700MW CSP + 250 MW PV Hybrid IPP

-DEWA

Owner Noor Energy 1 EPC SEGC


Substation 700MW CSP+250MW PV HYBRID-IPP PHASE IV
Sub-contractor JEPCC
Equipment Power cable Test Report
Installation location 20BBA10GS404 HTF MAIN PUMPS FAR GROUP 19cabinet
1.Equipment parameters
WDZC-YJY-12/20kV 3 x
Model Rated voltage(kV) 12/20kV
185
22WBC19GT001
20BBA10GS404
The starting The ending HTF MAIN PUMPS FAR
MV Switchgear
GROUP 19 VSD
Cable length (m) 40 Release date /

Cable KKS 20BBA10-004G Manufacturer /

2.Insulation Resistance measurement


Insulation Measured value(GΩ)
Test position Resistance test Test time(min)
voltage (V-DC) before voltage test after voltage test

A-B,C and ground 2500 1 1000 1000

B-A,C and ground 2500 1 1000 1000

C-A,B and ground 2500 1 1000 1000

3.AC withstand voltage test

Test position Test voltage (kV) Test time(min) Test frequency(Hz)

A-B,C and ground 24 15 105.7

B-A,C and ground 24 15 105.6

C-A,B and ground 24 15 105.4

Test Result Pass

4.Check the ends of the line phase

Test Result correct


Test date 2023.01.24 Temperature 23 ℃ 34 %
Calibration due
Test Instrument Make Model Serial Number
date
Series Suzhou
Resonance Test Industrial Park HVFRF-270 41539 22/06/2024
Device Haiwo
Insulation
Resistance SCEEC DM50C 521575 22/06/2024
Tester
5.conclusion:

Qualified

Tested By. Witnessed By. SEGC Witnessed By. NE1


700MW CSP + 250 MW PV Hybrid IPP
-DEWA

Owner Noor Energy 1 EPC SEGC


Substation 700MW CSP+250MW PV HYBRID-IPP PHASE IV
Sub-contractor JEPCC
Equipment Power cable Test Report
Installation location 20BBA10GS420 HTF MAIN PUMPS FAR GROUP 20cabinet
1.Equipment parameters
WDZC-YJY-12/20kV 3 x
Model Rated voltage(kV) 12/20kV
185
22WBC19GT001
20BBA10GS420
The starting The ending HTF MAIN PUMPS FAR
MV Switchgear
GROUP 20 VSD
Cable length (m) 40 Release date /

Cable KKS 20BBA10-005Q Manufacturer /

2.Insulation Resistance measurement


Insulation Measured value(GΩ)
Test position Resistance test Test time(min)
voltage (V-DC) before voltage test after voltage test

A-B,C and ground 2500 1 1000 1000

B-A,C and ground 2500 1 1000 1000

C-A,B and ground 2500 1 1000 1000

3.AC withstand voltage test

Test position Test voltage (kV) Test time(min) Test frequency(Hz)

A-B,C and ground 24 15 102.3

B-A,C and ground 24 15 102.5

C-A,B and ground 24 15 102.1

Test Result Pass

4.Check the ends of the line phase

Test Result correct


Test date 2023.01.30 Temperature 23 ℃ 34 %
Calibration due
Test Instrument Make Model Serial Number
date
Series Suzhou
Resonance Test Industrial Park HVFRF-270 41539 22/06/2024
Device Haiwo
Insulation
Resistance SCEEC DM50C 521575 22/06/2024
Tester
5.conclusion:

Qualified

Tested By. Witnessed By. SEGC Witnessed By. NE1


700MW CSP + 250 MW PV Hybrid IPP
-DEWA

Owner Noor Energy 1 EPC SEGC


Substation 700MW CSP+250MW PV HYBRID-IPP PHASE IV
Sub-contractor JEPCC
Equipment Power cable Test Report
Installation location 20BBA10GS419 HTF MAIN PUMPS FAR GROUP 21cabinet
1.Equipment parameters
WDZC-YJY-12/20kV 3 x
Model Rated voltage(kV) 12/20kV
185
22WBC21GT001
20BBA10GS419
The starting The ending HTF MAIN PUMPS FAR
MV Switchgear
GROUP 21VSD
Cable length (m) 40 Release date /

Cable KKS 20BBA10-005R Manufacturer /

2.Insulation Resistance measurement


Insulation Measured value(GΩ)
Test position Resistance test Test time(min)
voltage (V-DC) before voltage test after voltage test

A-B,C and ground 2500 1 1000 1000

B-A,C and ground 2500 1 1000 1000

C-A,B and ground 2500 1 1000 1000

3.AC withstand voltage test

Test position Test voltage (kV) Test time(min) Test frequency(Hz)

A-B,C and ground 24 15 36.50

B-A,C and ground 24 15 36.60

C-A,B and ground 24 15 36.60

Test Result Pass

4.Check the ends of the line phase


Test Result correct

Test date 2023.01.24 Temperature 23 ℃ 34 %


Calibration due
Test Instrument Make Model Serial Number
date
Series Suzhou
Resonance Test Industrial Park HVFRF-270 41539 22/06/2024
Device Haiwo
Insulation
Resistance SCEEC DM50C 521575 22/06/2024
Tester
5.conclusion:

Qualified

Tested By. Witnessed By. SEGC Witnessed By. NE1


700MW CSP + 250 MW PV Hybrid IPP
-DEWA

Owner Noor Energy 1 EPC SEGC


Substation 700MW CSP+250MW PV HYBRID-IPP PHASE IV
Sub-contractor JEPCC
Equipment Power cable Test Report
Installation location 20BBA10GS404 HTF MAIN PUMPS FAR GROUP 22cabinet
1.Equipment parameters
WDZC-YJY-12/20kV 3 x
Model Rated voltage(kV) 12/20kV
185
22WBC22GT001
20BBA10GS418
The starting The ending HTF MAIN PUMPS FAR
MV Switchgear
GROUP 22VSD
Cable length (m) 40 Release date /

Cable KKS 20BBA10-005S Manufacturer /

2.Insulation Resistance measurement


Insulation Measured value(GΩ)
Test position Resistance test Test time(min)
voltage (V-DC) before voltage test after voltage test

A-B,C and ground 2500 1 1000 1000

B-A,C and ground 2500 1 1000 1000

C-A,B and ground 2500 1 1000 1000

3.AC withstand voltage test

Test position Test voltage (kV) Test time(min) Test frequency(Hz)

A-B,C and ground 24 15 39.10

B-A,C and ground 24 15 39.30

C-A,B and ground 24 15 39.20

Test Result Pass

4.Check the ends of the line phase

Test Result correct


Test date 2023.01.24 Temperature 23 ℃ 34 %
Calibration due
Test Instrument Make Model Serial Number
date
Series Suzhou
Resonance Test Industrial Park HVFRF-270 41539 22/06/2024
Device Haiwo
Insulation
Resistance SCEEC DM50C 521575 22/06/2024
Tester
5.conclusion:

Qualified

Tested By. Witnessed By. SEGC Witnessed By. NE1


700MW CSP + 250 MW PV Hybrid IPP
-DEWA

Owner Noor Energy 1 EPC SEGC


Substation 700MW CSP+250MW PV HYBRID-IPP PHASE IV
Sub-contractor JEPCC
Equipment Power cable Test Report
Installation location 20BBA10GS417HTF MAIN PUMPS FAR GROUP 23 cabinet
1.Equipment parameters
WDZC-YJY-12/20kV 3 x
Model Rated voltage(kV) 12/20kV
185
22WBC23GT001
20BBA10GS417
The starting The ending HTF MAIN PUMPS FAR
MV Switchgear
GROUP 23 VSD
Cable length (m) 40 Release date /

Cable KKS 20BBA10-005G Manufacturer /

2.Insulation Resistance measurement


Insulation Measured value(GΩ)
Test position Resistance test Test time(min)
voltage (V-DC) before voltage test after voltage test

A-B,C and ground 2500 1 1000 1000

B-A,C and ground 2500 1 1000 1000

C-A,B and ground 2500 1 1000 1000

3.AC withstand voltage test

Test position Test voltage (kV) Test time(min) Test frequency(Hz)

A-B,C and ground 24 15 42.20

B-A,C and ground 24 15 42.40

C-A,B and ground 24 15 42.30

Test Result Pass

4.Check the ends of the line phase


Test Result correct

Test date 2023.01.31 Temperature 23 ℃ 34 %


Calibration due
Test Instrument Make Model Serial Number
date
Series Suzhou
Resonance Test Industrial Park HVFRF-270 41539 22/06/2024
Device Haiwo
Insulation
Resistance SCEEC DM50C 521575 22/06/2024
Tester
5.conclusion:

Qualified

Tested By. Witnessed By. SEGC Witnessed By. NE1


700MW CSP + 250 MW PV Hybrid IPP
-DEWA

Owner Noor Energy 1 EPC SEGC


Substation 700MW CSP+250MW PV HYBRID-IPP PHASE IV
Sub-contractor JEPCC
Equipment Power cable Test Report
Installation location 20BBA10GS409 HTF MAIN PUMPS FAR GROUP 02 cabinet
1.Equipment parameters
WDZC-YJY-12/20kV 3 x
Model Rated voltage(kV) 12/20kV
185
22WBC02GT001
20BBA10GS409
The starting The ending HTF MAIN PUMPS FAR
MV Switchgear
GROUP 02 VSD
Cable length (m) 40 Release date /

Cable KKS 20BBA10-005D Manufacturer /

2.Insulation Resistance measurement


Insulation Measured value(GΩ)
Test position Resistance test Test time(min)
voltage (V-DC) before voltage test after voltage test

A-B,C and ground 2500 1 1000 1000

B-A,C and ground 2500 1 1000 1000

C-A,B and ground 2500 1 1000 1000

3.AC withstand voltage test

Test position Test voltage (kV) Test time(min) Test frequency(Hz)

A-B,C and ground 24 15 97.10

B-A,C and ground 24 15 97.10

C-A,B and ground 24 15 96.90

Test Result Pass


4.Check the ends of the line phase

Test Result correct

Test date 2023.01.23 Temperature 23 ℃ 34 %


Calibration due
Test Instrument Make Model Serial Number
date
Series Suzhou
Resonance Test Industrial Park HVFRF-270 41539 22/06/2024
Device Haiwo
Insulation
Resistance SCEEC DM50C 521575 22/06/2024
Tester
5.conclusion:

Qualified

Tested By. Witnessed By. SEGC Witnessed By. NE1


700MW CSP + 250 MW PV Hybrid IPP
-DEWA

Owner Noor Energy 1 EPC SEGC


Substation 700MW CSP+250MW PV HYBRID-IPP PHASE IV
Sub-contractor JEPCC
Equipment Power cable Test Report
Installation location 20BBA10GS408 HTF MAIN PUMPS FAR GROUP 03 cabinet
1.Equipment parameters
WDZC-YJY-12/20kV 3 x
Model Rated voltage(kV) 12/20kV
185
22WBC03GT001
20BBA10GS408
The starting The ending HTF MAIN PUMPS FAR
MV Switchgear
GROUP 03 VSD
Cable length (m) 40 Release date /

Cable KKS 20BBA10-005E Manufacturer /

2.Insulation Resistance measurement


Insulation Measured value(GΩ)
Test position Resistance test Test time(min)
voltage (V-DC) before voltage test after voltage test

A-B,C and ground 2500 1 1000 1000

B-A,C and ground 2500 1 1000 1000

C-A,B and ground 2500 1 1000 1000

3.AC withstand voltage test

Test position Test voltage (kV) Test time(min) Test frequency(Hz)

A-B,C and ground 24 15 33.70

B-A,C and ground 24 15 33.80

C-A,B and ground 24 15 33.80

Test Result Pass


4.Check the ends of the line phase

Test Result correct

Test date 2023.01.7 Temperature 23 ℃ 34 %


Calibration due
Test Instrument Make Model Serial Number
date
Series Suzhou
Resonance Test Industrial Park HVFRF-270 41539 22/06/2024
Device Haiwo
Insulation
Resistance SCEEC DM50C 521575 22/06/2024
Tester
5.conclusion:

Qualified

Tested By. Witnessed By. SEGC Witnessed By. NE1


700MW CSP + 250 MW PV Hybrid IPP
-DEWA

Owner Noor Energy 1 EPC SEGC


Substation 700MW CSP+250MW PV HYBRID-IPP PHASE IV
Sub-contractor JEPCC
Equipment Power cable Test Report
Installation location 20BBA10GS422 HTF MAIN PUMPS FAR GROUP 04 cabinet
1.Equipment parameters
WDZC-YJY-12/20kV 3 x
Model Rated voltage(kV) 12/20kV
185
22WBC04GT001
20BBA10GS422
The starting The ending HTF MAIN PUMPS FAR
MV Switchgear
GROUP 03 VSD
Cable length (m) 40 Release date /

Cable KKS 20BBA10-005N Manufacturer /

2.Insulation Resistance measurement


Insulation Measured value(GΩ)
Test position Resistance test Test time(min)
voltage (V-DC) before voltage test after voltage test

A-B,C and ground 2500 1 1000 1000

B-A,C and ground 2500 1 1000 1000

C-A,B and ground 2500 1 1000 1000

3.AC withstand voltage test

Test position Test voltage (kV) Test time(min) Test frequency(Hz)

A-B,C and ground 24 15 102.0

B-A,C and ground 24 15 100.1


C-A,B and ground 24 15 99.60

Test Result Pass

4.Check the ends of the line phase

Test Result correct

Test date 2023.01.6 Temperature 23 ℃ 34 %


Calibration due
Test Instrument Make Model Serial Number
date
Series Suzhou
Resonance Test Industrial Park HVFRF-270 41539 22/06/2024
Device Haiwo
Insulation
Resistance SCEEC DM50C 521575 22/06/2024
Tester
5.conclusion:

Qualified

Tested By. Witnessed By. SEGC Witnessed By. NE1


700MW CSP + 250 MW PV Hybrid IPP
-DEWA

Owner Noor Energy 1 EPC SEGC


Substation 700MW CSP+250MW PV HYBRID-IPP PHASE IV
Sub-contractor JEPCC
Equipment Power cable Test Report
Installation location 20BBA10GS421 HTF MAIN PUMPS FAR GROUP 05 cabinet
1.Equipment parameters
WDZC-YJY-12/20kV 3 x
Model Rated voltage(kV) 12/20kV
185
22WBC05GT001
20BBA10GS421
The starting The ending HTF MAIN PUMPS FAR
MV Switchgear
GROUP 05 VSD
Cable length (m) 40 Release date /

Cable KKS 20BBA10-005P Manufacturer /

2.Insulation Resistance measurement


Insulation Measured value(GΩ)
Test position Resistance test Test time(min)
voltage (V-DC) before voltage test after voltage test

A-B,C and ground 2500 1 1000 1000

B-A,C and ground 2500 1 1000 1000

C-A,B and ground 2500 1 1000 1000

3.AC withstand voltage test

Test position Test voltage (kV) Test time(min) Test frequency(Hz)

A-B,C and ground 24 15 104.4

B-A,C and ground 24 15 104.9

C-A,B and ground 24 15 104.3

Test Result Pass

4.Check the ends of the line phase


Test Result correct

Test date 2023.01.7 Temperature 23 ℃ 34 %


Calibration due
Test Instrument Make Model Serial Number
date
Series Suzhou
Resonance Test Industrial Park HVFRF-270 41539 22/06/2024
Device Haiwo
Insulation
Resistance SCEEC DM50C 521575 22/06/2024
Tester
5.conclusion:

Qualified

Tested By. Witnessed By. SEGC Witnessed By. NE1