NE1 - 700MW CSP + 250MW PV Hybrid Projec

Commissioning Record and Report

Checking Record

SYSTEM: LV SYSTEM(23BFT21) UNIT: PT2/TES


No. name KKS Result Remark

400 V INCOMING Breaker(23BFA21GS101)

1 400V Incoming Breaker Close CMD 23BFA21GS101ZB11

2 400V Incoming Breaker Open CMD 23BFA21GS101ZB12

3 400V Incoming Breaker Breaker Closed 23BFA21GS101XB01

4 400V Incoming Breaker Breaker Open 23BFA21GS101XB02

400V Incoming Breaker Switchgear


5 23BFA21GS101XB52
Available
400V Incoming Breaker 27 relay (live
6 23BFA21GS101XB27
line)
400V LV Measurement Switchgear (23BFA21GS301)

7 400V SWGR AVAILABLE 23BF21GS301XB52

8 400V LOW VOLTAGE 23BFA21GS301XB12

9 400V ANY MCC Breaker Tripped 23BFA21GS301XB07

400 V transformer box (23BFT21)

Winding temp alrm 23BFA21GS101XB08

Winding temp trip 23BFA21GS101XB50

400 V LV TieBreaker(13BFA21GS201)

10 400V Close CMD 23BFA21GS201ZB11

11 400V Open CMD 23BFA21GS201ZB12

12 400V Breaker Closed 13BFA21GS201XB01

13 400V Breaker Opened 13BFA21GS201XB02

14 400V Switchgear Available 13BFA21GS201XB52

Commissioning:
Date:
(Signature)
EPC: Date:

1/2
NE1 - 700MW CSP + 250MW PV Hybrid Projec
Commissioning Record and Report

Checking Record

SYSTEM: LV SYSTEM(23BFT21) UNIT: PT2/TES


No. name KKS Result Remark

(Signature)
Operator:
Date:
(Signature)
Owner:
Date:
(Signature)

2/2