You are on page 1of 1

Cyclical 

Maintenance of Chong Yuet Ming Physics and Chemistry Building & Outdoor Facilities 

MVAC INSTALLATION  
FOR 
CYCLICAL MAINTENANCE OF CHONG YUET MING 
PHYSICS AND CHEMISTRY BUILDING & 
OUTDOOR FACILITIES 
 
 
OPERATION AND MAINTENANCE MANUAL 
FOR 
LG2/F TO 6/F TOILET 
 
 

Prepared By: Chris Cheung (Rev.0) 
Issue Date: Mar‐2023, Getwick Engineers Ltd. 

You might also like