SYSTEM
SCHEDULE
SPECIFICATION
REF. DRWG
ACTION
No. DESIGNATION
YES NO N/A DATE
1 All items are located in accordance with the approved installation drawing.
2 All switch actions operate and plates are free from cracks and scratches.
4 Switch and socket box are fitted with earthing terminals, and metal plates
6 Pull switches are complete with break joint rings and nylon pull cords.
7 Correct rating fused are fitted in all spur units and plug tops.
8 Finish of fixing screw heads are identical to the finish of metal plates.
REMARK