Professional Documents
Culture Documents
OF FLOODING CASULTIES, DAMAGES AND ACTIONS RELATED TO SHIP SYSTEMS (in relation with 1‐104‐304 ‐ Flooding Casualties Treshold plan)
Ship system : PROVISION REFRIGERATING PLANT ASSESMENT ‐ SRtP
Drawing No.: 1‐554‐104_Sheet 2/2
List of damaged system parts List of non‐functional system parts out of
Mark Affected casualty threshold Description of system damage List of action to prepare system for SRtP
inside casualty threshold affected casualty threshold
FL 38 Flooding casualty threshold 38 Flooding in Void Space ‐‐‐ ‐‐‐ ‐‐‐
‐ Provision Freezer System DX Condenser Unit in ER
2 Refrigerant supply in MFZ 4 for:
FL 39 Flooding casualty threshold 39 Flooding in Engine Room 2 ‐‐‐
‐ Provision System copper piping and fittings in ER ‐ Provision stores.
2
Flooding in: ‐ Provision Freezer System Evaporators in affected
‐ Trafo Room; spaces Refrigerant supply in MFZ 4 for:
FL 55 Flooding casualty threshold 55 ‐‐‐
‐ Provisions; ‐ Provision System copper piping and fittings in ‐ Provision stores.
‐ Corridors. affected spaces
Flooding in any space other than
FL X All other flooding casualities ‐‐‐ ‐‐‐ ‐‐‐
those mentioned above
Page 1 of 2
LIST OF FIRE CASULTIES, DAMAGES AND ACTIONS RELATED TO SHIP SYSTEMS (in relation with 1‐104‐306 ‐ Fire Casualties Treshold plan)
Ship system : PROVISION REFRIGERATING PLANT ASSESMENT ‐ SRtP
Drawing No.: 1‐554‐104_Sheet 2/2
List of damaged system parts List of non‐functional system parts out of
Mark Affected casualty threshold Description of system damage List of action to prepare system for SRtP
inside casualty threshold affected casualty threshold
Deck 2
‐ Provision Freezer System DX Condenser Unit in ER
2 Refrigerant supply in MFZ 4 for:
FR 1 Fire casualty threshold 1 Fire in Engine Room 2 ‐‐‐
‐ Provision System copper piping and fittings in ER ‐ Provision stores.
2
‐ Provision System copper piping and fittings in Refrigerant supply in MFZ 4 for:
FR 16 Fire casualty threshold 16 Fire in Corridor ‐‐‐
Corridor ‐ Provision stores.
‐ Provision Freezer System Evaporators in Provision
Fire in Provision ‐ Vegetable (‐25 ‐ Vegetable (‐25 degC) Refrigerant supply in MFZ 4 for:
FR 21 Fire casualty threshold 21 ‐‐‐
degC) ‐ Provision System copper piping and fittings in ‐ Provision stores.
Provision ‐ Vegetable (‐25 degC)
Deck 3
Fire in:
‐ Corridor;
‐ Provision System copper piping and fittings in Refrigerant supply in MFZ 4 for:
FR 55 Fire casualty threshold 55 ‐ Master Provision Office; ‐‐‐
affected spaces ‐ Provision stores.
‐ Trolley Washroom;
‐ Crew Toilets.
‐ Provision System copper piping and fittings in Refrigerant supply in MFZ 4 for:
FR 56 Fire casualty threshold 56 Fire in Food Preparation Room ‐‐‐
Food Preparation Room ‐ Provision stores.
‐ Provision Freezer System Evaporators in Provision
Refrigerant supply in MFZ 4 for:
FR 58 Fire casualty threshold 58 Fire in Provision ‐ Provision System copper piping and fittings in ‐‐‐
‐ Provision stores.
Provision
Deck 4
‐ Provision System copper piping and fittings in Refrigerant supply in MFZ 4 for:
FR 93 Fire casualty threshold 93 Fire in Galley ‐‐‐
Galley ‐ Provision stores.
‐ Provision System copper piping and fittings in Refrigerant supply in MFZ 4 for:
FR 94 Fire casualty threshold 94 Fire in Cold Room ‐‐‐
Cold Room ‐ Provision stores.
Rest of Vessel
Fire in any space other than those
FR X All other fire casualities ‐‐‐ ‐‐‐ ‐‐‐
mentioned above
Page 2 of 2