You are on page 1of 10

Sub: Uploading of M B Lal committee recommendations compliance status

Fire incident at POL terminal of Indian Oil Corporation’s in Jaipur on Oct 29, 2009, was
inquired by M B Lal committee. The implementation status of M B Lal inquiry committee
recommendations as on 31st August’2018 is attached herewith.

1
URAN PLANT

Purchase
Compliance Remarks
Sr. Items Description Requirement order Items Installed
Status

---- Commissioned ---


1. Fire Water Network ( FWN ) 01 no 01 no

High Volume Long Range Monitors ---- Commissioned ---


2. 53 nos 53 nos
(HVLR)

Automatic Rim Seal Fire Protection ---- Commissioned ---


3. 08 nos 08 nos
System

Medium Expansion Foam Generator ---- Complied ---


4. 01 no 01 no
(MEFG)

---- Commissioned ---


5. Hydro Carbon Detectors (HCD) 31 nos 31 nos

---- Commissioned ---


6. Close-Circuit Television (CCTV) 101 nos 101 nos

---
Complied
7. Emergency Kit 01 Set ---- 01 Set

2/9
HAZIRA PLANT

Purchase
Items Compliance
Sr. Items Description Requirement order Remarks
Installed Status

1
Complied
Fire Water Network ( FWN ) ----
01 no 01 no

High Volume Long Range Monitors Complied ----


2 ----
(HVLR) 46 nos 46 nos

Automatic Rim Seal Fire Protection Commissioned ----


3 ----
System 08 nos 08 nos

Medium Expansion Foam Generator ---- Complied ----


4
(MEFG) 02 nos 02 nos

----
5 Hydro Carbon Detectors (HCD) ---- Commissioned
34 nos 34 nos

Commissioned ----
6 Close-Circuit Television (CCTV) ----
61+55 61+55

Complied
01 Set 01 Set ----
7 Emergency Kit ----

3/9
RAJAHMUNDRY ASSET

Tatipaka Refinery

Purchase
Compliance
Sr. Items Description Requirement order Items Installed Remarks
Status

---- Complied ----


1. Fire Water Network ( FWN )
01 no 01 no

High Volume Long Range Monitors ----


2. 6 nos ---- 6 nos Commissioned
(HVLR)

Automatic Rim Seal Fire Protection


3. 2 nos ---- 2 nos Commissioned
System

Medium Expansion Foam Generator Complied ----


4. 3 nos ---- 3 nos
(MEFG)

28 nos 28 nos ----


5. Hydro Carbon Detectors (HCD) ---- Commissioned

----
6. Close-Circuit Television (CCTV) 18 nos ---- 18 nos Commissioned

----
7. Emergency Kit 1 Set ---- 1 Set Complied

4/9
ANKLESHWAR ASSET
CPF-Gandhar and CTF-Ankleshwar

Purchase
Items Compliance Remarks
Sr. Items Description Requirement order
Installed Status

Fire Water Network ----


1. 2 nos
( FWN )
Work in progress. Over all
High Volume Long Range Monitors ---- progress at CTF-Ank and
2. 62 nos 04.11.2014 EDC: Sept'2018 CPF Gandhar is 51.69 %
(HVLR)
(EDC: Expected date
of completion)
Automatic Rim Seal Fire Protection ----
3. 8 nos
System

56 nos 56 nos
Medium Expansion Foam Generator CPF- 30 CPF- 30 ----
4. ---- Complied
(MEFG) CTF-26 CTF-26

106 nos 106 nos


CPF-73 ---- CPF-73
5. Hydro Carbon Detectors (HCD) Commissioned ----
CTF-33 CTF-33

22 nos 22 nos ----


CPF-13 ---- CPF-13
6. Close-Circuit Television (CCTV) Commissioned
CTF-9 CTF-9

----

7. Emergency Kit 2 set ---- 2 set Complied

5/9
AHMEDABAD ASSET

De-salter Plant-Nawagam, CTF- Nawagam, CTF-Kalol and CTF-South Kadi

Purchase
Items Compliance Remarks
Sr. Items Description Requirement order
Installed Status

1. Fire Water Network ( FWN ) 4 nos Work in progress.


---- EDC: March’2019 Over all progress is
03.02.2015
65.33 %

High Volume Long Range Monitors


2. 45 nos
(HVLR)

Automatic Rim Seal Fire Protection ---- ----


3. 6 nos 6 nos Complied
System

Medium Expansion Foam Generator ---- ----


4. 68 nos 68 nos Complied
(MEFG)

82 nos. ---- 82 nos.


5. Hydro Carbon Detectors (HCD) Commissioned
---

6. Close-Circuit Television (CCTV) 50 nos 50 nos Commissioned


---- ----

7. Emergency Kit 2 Sets ---- 2 Sets Complied


---

6/9
MEHSANA ASSET

Mehsana CTF, CTF-North Kadi, CTF-South Santhal, CTF-North Santhal

Purchase
Items Compliance Remarks
Sr. Items Description Requirement order
Installed Status

--- Work in progress.


1. Fire Water Network ( FWN ) 4 nos EDC: North Kadi CTF
: June’2019 Over all progress is
08.07.2016 69.38 %
&
EDC: other CTFs:
High Volume Long Range Monitors --- 13th Oct’2019
2. 15 nos
(HVLR)

Automatic Rim Seal Fire Protection ---- ---- ---- ----


3. Not applicable
System

Medium Expansion Foam Generator Complied ----


4. 12 nos ---- 12 nos
(MEFG)

---- ---- Petroleum Class “B”


5. Hydro Carbon Detectors (HCD) NA NA
product

----
6. Close-Circuit Television (CCTV) 30 nos ---- 30 nos Commissioned

----
7. Emergency Kit 4 sets ---- 4 sets Complied

7/9
ASSAM ASSET

CTF-Geleky, CTF-Lakwa and CTF-Moran

Purchase
Items Remarks
Sr. Items Description Requirement order Compliance Status
Installed

GLK CTF:
(Fire water network & 12 Nos
1. Fire Water Network ( FWN ) 3 nos 03.02.2015 (GLK) Moran: HVLR) – EDC: March’2019
Fire water network Work in progress.
30.10.2013 (LKW
& 5 Nos HVLR
& MRN) LKW CTF:
Installed (June’17)
(Fire water network & 10 Nos
2.
High Volume Long Range Monitors
27 nos HVLR) - EDC: March’2019
(HVLR)

Automatic Rim Seal Fire Protection ---- ----


3. Not applicable ---- ----
System

Medium Expansion Foam Generator ---- ----


4. 41 nos ---- Complied
(MEFG)

GLK: 50 (Installed) Moran: 11(Installation started) ----


5. Hydro Carbon Detectors (HCD) 73 nos ----
LKW: 12 Available at site

---- ----
6. Close-Circuit Television (CCTV) 30 nos ---- Commissioned

----
----
7. Emergency Kit 3 Set ---- Complied

8/9
KARAIKAL ASSET

GGS-Narimanam,

Purchase
Items Compliance Remarks
Sr. Items Description Requirement order
Installed Status

Work in progress.
1. Fire Water Network ( FWN ) 1 no Over all progress is
EDC: March’2019 65.33 %
03.02.2015 ---
High Volume Long Range Monitors
2. 8 nos
(HVLR)

Automatic Rim Seal Fire Protection --- ---- ---


3.
System
N.A. ---

Medium Expansion Foam Generator Complied ---


4. 8 nos ---- 8 nos
(MEFG)

33 nos 33 nos ---


5. Hydro Carbon Detectors (HCD) ---- Commissioned

---
6. Close-Circuit Television (CCTV) 6 nos ---- 6 nos Commissioned

Complied ---
7. Emergency Kit 2 Sets ---- 2 Sets

9/9
KARAIKAL ASSET

VAP-Kuthalam

Purchase
Compliance Remarks
Sr. Items Description Requirement order Items Installed
Status

Complied
1. 1Fire Water Network ( FWN ) 1 no --- 1 no

High Volume Long Range Monitors ----


2.
(HVLR)
5 nos --- ------- Plant not in operation.
due to market
constraint for
Automatic Rim Seal Fire Protection ---- evacuation of VAP.
3. 2 nos 2 nos Commissioned
System HVLR, CCTV shall be
installed once the plant
Medium Expansion Foam Generator Complied becomes operational.
4. 8 nos ---- 8 nos
(MEFG)
---
8 nos 8 nos
5. Hydro Carbon Detectors (HCD) ---- Commissioned

6. Close-Circuit Television (CCTV) 4 nos --- --- --------

7. Emergency Kit 2 Sets ---- 2 Sets Complied

10/9