Professional Documents
Culture Documents
Department of Archaeology Item Rates: Ministry of Culture, Tourism & Civil Aviation
Department of Archaeology Item Rates: Ministry of Culture, Tourism & Civil Aviation
xls
Government of Nepal
Ministry of Culture, Tourism & Civil Aviation
Department of Archaeology
Item Rates
Project:- Inside Kathmandu Valley Fiscal Year:- 2078/079
Earth work
Brick work
Page 1
660230651.xls
Stone work
Page 2
660230651.xls
Flooring work
Wood work
Carving work
Page 3
660230651.xls
Roofing work
Page 4
660230651.xls
62 Gold gilding work (new coat) 1/4 tola per sq.ft m2 42118.60 ft2 3914.37
Scaffolding work
Concrete work
Page 5
660230651.xls
Dismantling work
Dismantling Chimney Brick work in mud
27 m3 963.01 ft3 27.28
mortar and throwing 10 metre away.
Dismantling Chimney Brick work in cemnt
28 m3 1926.02 ft3 54.54
mortar and throwing 10 metre away.
Miscellaneous
Pointing work
Page 6
660230651.xls
Plaster works
12.5 mm thick lime, surkhi and sand plaster
112 m2 530.44 ft2 49.30
in 1:1:2 ratio
20 mm thick lime, surkhi and sand plaster in
113 m2 711.12 ft2 66.09
1:1:2 ratio
Cornice works in lime, surkhi and sand
136 m2 3152.68 ft2 293.00
mortar 1: 1:1 ratio
Remanrks
wright approx . thikness
Gajur size hight Gauge
kg in mm
12" 1.20 16 1.60
18" 2.00 18 1.25
24" 3.50 20 1.00
30" 5.00 22 0.80
36" 7.20 24 0.63
42" 10.00 26 0.50
densityk
48" 14.00 metal
g/ mm3
54" 19.50 brass ###
60" 27.00 copper ###
Prepare
d by:- Checked by:- Approved by:-
Page 7