This 3 sentence summary provides the key details from the Surface Conduit Installation Checklist document:
The document is a checklist for inspecting the installation of surface conduit, listing 15 items to check including that conduits are clean and sealed, runs and supports are installed correctly according to specifications and drawings, bend radii and spacings meet requirements, and fittings, seals, grounds and connections are properly installed. Upon completion of the inspection, the contractor and client must sign accepting the installation and any deviations are noted for as-built documents.
This 3 sentence summary provides the key details from the Surface Conduit Installation Checklist document:
The document is a checklist for inspecting the installation of surface conduit, listing 15 items to check including that conduits are clean and sealed, runs and supports are installed correctly according to specifications and drawings, bend radii and spacings meet requirements, and fittings, seals, grounds and connections are properly installed. Upon completion of the inspection, the contractor and client must sign accepting the installation and any deviations are noted for as-built documents.
This 3 sentence summary provides the key details from the Surface Conduit Installation Checklist document:
The document is a checklist for inspecting the installation of surface conduit, listing 15 items to check including that conduits are clean and sealed, runs and supports are installed correctly according to specifications and drawings, bend radii and spacings meet requirements, and fittings, seals, grounds and connections are properly installed. Upon completion of the inspection, the contractor and client must sign accepting the installation and any deviations are noted for as-built documents.
SURFACE CONDUIT INSTALLATION CHECKLIST Page 1 of 1
ITEMS TO BE CHECKED CHECKED DATE
YES / NO 1 Conduits clean, reamed, sealed, bushed & no threads outside equipment 2 Conduit runs installed as per specification & drawing 3 Supports & spacing as per specification & drawing 4 Supports adjacent to terminal fitting 5 Bend radius correct per specification & free of deformities 6 Expansion joints installed as per drawing 7 Correct spacing between instruments & power circuits 8 Correct spacing from hot pipes or surfaces to specification 9 All fittings properly installed, sealed, bushed & saddled 10 All required seals & drains installed as per drawing 11 Conduit permanently & effectively grounded 12 Flexible conduit type size installed as per drawing 13 Proper connections to junction boxes & equipment 14 All deviations, revisions or changes recorded for As Builts 15