1 Batu Gunung/batu belah M 010 m3 Puruk Cahu 224,532 280,665 = [(150.000 + (15.000 x jarak)] / 3 (7) + (11)
Saripoi 623,700 779,625 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Dirung Lingkin 498,960 623,700 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Muara Laung 548,856 686,070 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Makunjung 561,330 701,663 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Tbg Lahung 374,220 467,775 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Kunyi 498,960 623,700 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Tbg Bantian 449,064 561,330 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Olong 374,220 467,775 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Muara Joloi 498,960 623,700 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
2 Batu Pecah 10 - 15 cm M 026 m3 Puruk Cahu 319,788 399,735 = [(150.000 + (15.000 x jarak)] / 3 (7) + (11)
(Manual) Saripoi 755,244 944,055 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Dirung Lingkin 619,164 773,955 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Muara Laung 673,596 841,995 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Makunjung 694,008 867,510 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Tbg Lahung 489,888 612,360 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Kunyi 625,968 782,460 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Tbg Bantian 571,536 714,420 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Olong 489,888 612,360 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Muara Joloi 639,576 799,470 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
3 Batu Pecah 5 - 7 cm M 022 m3 Puruk Cahu 427,518 534,398 = [(150.000 + (15.000 x jarak)] / 3 (7) + (11)
(Manual) Saripoi 899,262 1,124,078 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Dirung Lingkin 751,842 939,803 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Muara Laung 810,810 1,013,513 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Makunjung 840,294 1,050,368 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Tbg Lahung 619,164 773,955 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Kunyi 766,584 958,230 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Tbg Bantian 707,616 884,520 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Olong 619,164 773,955 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Muara Joloi 796,068 995,085 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
4 Batu Pecah 3 - 5 cm M 023 m3 Puruk Cahu 592,515 740,644 = [(150.000 + (15.000 x jarak)] / 3 (7) + (11)
(Alat) (Produksi) Saripoi 854,469 1,068,086 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Dirung Lingkin 754,677 943,346 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Muara Laung 904,365 1,130,456 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Makunjung - - = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Tbg Lahung - - = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Kunyi - - = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Tbg Bantian - - = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Olong - - = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Muara Joloi - - = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
5 Batu Pecah 2 - 3 cm M 024 m3 Puruk Cahu 742,203 927,754 = [(150.000 + (15.000 x jarak)] / 3 (7) + (11)
(Alat) (Produksi) Saripoi 1,004,157 1,255,196 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Dirung Lingkin 904,365 1,130,456 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Muara Laung 1,054,053 1,317,566 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Makunjung - - = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Tbg Lahung - - = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Kunyi - - = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Tbg Bantian - - = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Olong - - = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Muara Joloi - - = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
6 Batu Pecah 1 - 2 cm M 025 m3 Puruk Cahu 742,203 927,754 = [(150.000 + (15.000 x jarak)] / 3 (7) + (11)
(Alat) (Produksi) Saripoi 1,004,157 1,255,196 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Dirung Lingkin 904,365 1,130,456 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Muara Laung 1,054,053 1,317,566 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Makunjung - - = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Tbg Lahung - - = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Kunyi - - = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Tbg Bantian - - = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Olong - - = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Muara Joloi - - = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
7 Batu Pecah 0,5 - 1 cm M 026 m3 Puruk Cahu 742,203 927,754 = [(150.000 + (15.000 x jarak)] / 3 (7) + (11)
(Alat) (Produksi) Saripoi 1,004,157 1,255,196 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Dirung Lingkin 904,365 1,130,456 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Muara Laung 1,054,053 1,317,566 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Makunjung - - = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Tbg Lahung - - = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Kunyi - - = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Tbg Bantian - - = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Olong - - = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Muara Joloi - - = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
8 Batu Pecah Tersaring M 018 m3 Puruk Cahu 742,203 927,754 = [(150.000 + (15.000 x jarak)] / 3 (7) + (11)
(Alat) (Produksi) Saripoi 1,004,157 1,255,196 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Dirung Lingkin 904,365 1,130,456 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Muara Laung 1,054,053 1,317,566 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Makunjung - - = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Tbg Lahung - - = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Kunyi - - = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Tbg Bantian - - = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Olong - - = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Muara Joloi - - = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
9 Debu Batu m3 Puruk Cahu 674,730 843,413 = [(150.000 + (15.000 x jarak)] / 3 (7) + (11)
Saripoi 912,870 1,141,088 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Dirung Lingkin 822,150 1,027,688 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Muara Laung 958,230 1,197,788 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Makunjung - - = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Tbg Lahung - - = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Kunyi - - = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Tbg Bantian - - = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Olong - - = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Muara Joloi - - = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
10 Kerikil Galian Bukit M 011 m3 Puruk Cahu 187,110 233,888 = [(150.000 + (15.000 x jarak)] / 3 (7) + (11)
(Awcas) Saripoi 461,538 576,923 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Dirung Lingkin 436,590 545,738 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Muara Laung 498,960 623,700 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Makunjung 424,116 530,145 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Tbg Lahung 424,116 530,145 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Kunyi 486,486 608,108 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Tbg Bantian 424,116 530,145 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Olong 361,746 452,183 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Muara Joloi 486,486 608,108 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
11 Kerikil Sungai M 012 m3 Puruk Cahu 228,690 285,863 = [(150.000 + (15.000 x jarak)] / 3 (7) + (11)
Saripoi 598,752 748,440 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Dirung Lingkin 449,064 561,330 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Muara Laung 598,752 748,440 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Makunjung 436,590 545,738 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Tbg Lahung 436,590 545,738 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Kunyi 498,960 623,700 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Tbg Bantian 436,590 545,738 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Olong 374,220 467,775 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Muara Joloi 453,600 567,000 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
12 Kerikil Sungai Ayak M 013 m3 Puruk Cahu 253,260 316,575 = [(150.000 + (15.000 x jarak)] / 3 (7) + (11)
Tanpa Pasir Saripoi 589,680 737,100 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Dirung Lingkin 453,600 567,000 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Muara Laung 589,680 737,100 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Makunjung 442,260 552,825 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Tbg Lahung 442,260 552,825 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Kunyi 498,960 623,700 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Tbg Bantian 442,260 552,825 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Olong 385,560 481,950 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Muara Joloi 498,960 623,700 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
13 Pasir Urug / Timbunan M 040 m3 Puruk Cahu 111,132 138,915 = [(150.000 + (15.000 x jarak)] / 3 (7) + (11)
Saripoi 170,667 213,334 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Dirung Lingkin 178,605 223,256 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Muara Laung 267,908 334,884 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Makunjung 250,047 312,559 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Tbg Lahung 309,582 386,978 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Kunyi 202,419 253,024 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Tbg Bantian 190,512 238,140 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Olong 190,512 238,140 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Muara Joloi 250,047 312,559 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
14 Pasir Ayak Untuk M 041 m3 Puruk Cahu 166,320 207,900 = [(150.000 + (15.000 x jarak)] / 3 (7) + (11)
Beton / Pasir Barito. Saripoi 449,064 561,330 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Dirung Lingkin 349,272 436,590 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Muara Laung 498,960 623,700 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Makunjung 374,220 467,775 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Tbg Lahung 374,220 467,775 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Kunyi 498,960 623,700 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Tbg Bantian 374,220 467,775 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Olong 311,850 389,813 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Muara Joloi 498,960 623,700 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
15 Sirtu (tidak diayak, dari M 042 m3 Puruk Cahu 187,110 233,888 = [(150.000 + (15.000 x jarak)] / 3 (7) + (11)
sungai) Saripoi 548,856 686,070 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Dirung Lingkin 399,168 498,960 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Muara Laung 548,856 686,070 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Makunjung 436,590 545,738 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Tbg Lahung 436,590 545,738 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Kunyi 498,960 623,700 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Tbg Bantian 374,220 467,775 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Olong 374,220 467,775 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Muara Joloi 498,960 623,700 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
16 Tanah Timbunan M 050 m3 Puruk Cahu 99,225 124,031 = [(150.000 + (15.000 x jarak)] / 3 (7) + (11)
Saripoi 158,760 198,450 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Dirung Lingkin 166,698 208,373 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Muara Laung 238,140 297,675 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Makunjung 238,140 297,675 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Tbg Lahung 297,675 372,094 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Kunyi 190,512 238,140 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Tbg Bantian 178,605 223,256 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Olong 178,605 223,256 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Muara Joloi 238,140 297,675 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
17 Semen Portland M080 zak Puruk Cahu 124,200 155,250 = [(150.000 + (15.000 x jarak)] / 80 (7) + (11)
(1 zak = 50 kg) Saripoi 142,997 178,747 = [(150.000 + (15.000 x jarak)] / 80 (8) + (11)
Dirung Lingkin 142,997 178,747 = [(150.000 + (15.000 x jarak)] / 80 (8) + (11)
Muara Laung 136,080 170,100 = [(150.000 + (15.000 x jarak)] / 80 (8) + (11)
Makunjung 125,442 156,803 = [(150.000 + (15.000 x jarak)] / 80 (8) + (11)
Tbg Lahung 158,760 198,450 = [(150.000 + (15.000 x jarak)] / 80 (9) + (11)
Tbg Kunyi 201,960 252,450 = [(150.000 + (15.000 x jarak)] / 80 (10) + (11)
Tbg Bantian 190,080 237,600 = [(150.000 + (15.000 x jarak)] / 80 (9) + (11)
Tbg Olong 207,900 259,875 = [(150.000 + (15.000 x jarak)] / 80 (10) + (11)
Muara Joloi 219,780 274,725 = [(150.000 + (15.000 x jarak)] / 80 (10) + (11)
18 Besi Beton Polos (top) M167 Kg Puruk Cahu 13,662 17,078 = [(150.000 + (15.000 x jarak)] / 4.000 (7) + (11)
Saripoi 13,900 17,375 = [(150.000 + (15.000 x jarak)] / 4.000 (8) + (11)
Dirung Lingkin 13,900 17,375 = [(150.000 + (15.000 x jarak)] / 4.000 (8) + (11)
Muara Laung 13,900 17,375 = [(150.000 + (15.000 x jarak)] / 4.000 (8) + (11)
Makunjung 13,662 17,078 = [(150.000 + (15.000 x jarak)] / 4.000 (8) + (11)
Tbg Lahung 14,137 17,672 = [(150.000 + (15.000 x jarak)] / 4.000 (9) + (11)
Tbg Kunyi 14,494 18,117 = [(150.000 + (15.000 x jarak)] / 4.000 (10) + (11)
Tbg Bantian 14,434 18,043 = [(150.000 + (15.000 x jarak)] / 4.000 (9) + (11)
Tbg Olong 14,672 18,340 = [(150.000 + (15.000 x jarak)] / 4.000 (10) + (11)
Muara Joloi 16,276 20,345 = [(150.000 + (15.000 x jarak)] / 4.000 (10) + (11)
19 Kayu Ulin Balok Besar M 181 m3 Puruk Cahu 5,278,500 6,598,125 = [(150.000 + (15.000 x jarak)] / 3 (7) + (11)
Saripoi 2,328,750 2,910,938 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Dirung Lingkin 5,278,500 6,598,125 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Muara Laung 6,831,000 8,538,750 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Makunjung 5,589,000 6,986,250 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Tbg Lahung 4,471,200 5,589,000 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Kunyi 6,210,000 7,762,500 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Tbg Bantian 6,210,000 7,762,500 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Olong 2,484,000 3,105,000 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Muara Joloi 4,657,500 5,821,875 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
20 Kayu Ulin Balok Kecil M 181 m3 Puruk Cahu 5,643,000 7,053,750 = [(150.000 + (15.000 x jarak)] / 3 (7) + (11)
Saripoi 4,455,000 5,568,750 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Dirung Lingkin 5,346,000 6,682,500 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Muara Laung 6,534,000 8,167,500 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Makunjung 5,346,000 6,682,500 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Tbg Lahung 5,049,000 6,311,250 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Kunyi 5,940,000 7,425,000 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Tbg Bantian 5,940,000 7,425,000 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Olong 2,376,000 2,970,000 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Muara Joloi 4,455,000 5,568,750 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
21 Papan Ulin M 181 m3 Puruk Cahu 6,997,320 8,746,650 = [(150.000 + (15.000 x jarak)] / 3 (7) + (11)
Saripoi 5,940,000 7,425,000 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Dirung Lingkin 5,940,000 7,425,000 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Muara Laung 8,167,500 10,209,375 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Makunjung 8,167,500 10,209,375 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Tbg Lahung 6,311,250 7,889,063 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Kunyi 5,940,000 7,425,000 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Tbg Bantian 5,940,000 7,425,000 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Olong 2,970,000 3,712,500 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Muara Joloi 5,568,750 6,960,938 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
22 Kayu Lanan Balok Kecil m3 Puruk Cahu 2,376,000 2,970,000 = [(150.000 + (15.000 x jarak)] / 3 (7) + (11)
Saripoi 2,079,000 2,598,750 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Dirung Lingkin 2,376,000 2,970,000 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Muara Laung 1,782,000 2,227,500 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Makunjung 1,782,000 2,227,500 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Tbg Lahung 2,524,500 3,155,625 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Kunyi 2,376,000 2,970,000 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Tbg Bantian 2,257,200 2,821,500 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Olong 1,485,000 1,856,250 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Muara Joloi 2,079,000 2,598,750 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
23 Papan Lanan m3 Puruk Cahu 2,577,960 3,222,450 = [(150.000 + (15.000 x jarak)] / 3 (7) + (11)
Saripoi 2,227,500 2,784,375 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Dirung Lingkin 2,598,750 3,248,438 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Muara Laung 2,079,000 2,598,750 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Makunjung 2,079,000 2,598,750 = [(150.000 + (15.000 x jarak)] / 3 (8) + (11)
Tbg Lahung 2,524,500 3,155,625 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Kunyi 2,376,000 2,970,000 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Tbg Bantian 2,301,750 2,877,188 = [(150.000 + (15.000 x jarak)] / 3 (9) + (11)
Tbg Olong 1,856,250 2,320,313 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Muara Joloi 2,227,500 2,784,375 = [(150.000 + (15.000 x jarak)] / 3 (10) + (11)
Keterangan :
Regional I : Kecamatan Murung
Catatan :
- Harga Setempat sudah termasuk Pungutan Resmi Lainnya (sesuai daerah ybs).
- Harga Total sudah termasuk Pajak PPn dan Keuntungan Pelaksana.
- Untuk Lokasi yang sulit ditempuh lewat jalan darat dan jauh dari pinggir sungai perlu ditambah dengan
Ongkos Angkut sesuai jauh lokasi atau jarak tempuh angkutan (darat/sungai).
- Harga Bahan Pabrikasi dihitung Harga Pabrik + Ongkos Kirim + Pajak PPN dan Keuntungan Pelaksana.
C. UPAH
REGIONAL
REGION I REGION II REGION III REGION IV
Kec. Tanah Siang Kec. Sumber Barito
Harga Dasar Kec. Barito Tuhup Raya Kec. Sei Babuat Kec. U'ut Murung
No. JENIS KEAHLIAN SAT. KODE Kec. Murung KET.
(Rp.) Kec. Laung Tuhup Kec. Permata Intan Kec. Seribu Riam
Kec. Tanah Siang Selatan
Total Total Total Total
(Rp.) (Rp.) (Rp.) (Rp.)
1 2 3 4 5 6 7 8 9 10
Keterangan :
Regional I : Kecamatan Murung
NILAI FISIK:
Rp 561,000,000.00
PROGRAM :
Program Pembangunan Prasarana Sanitasi
KEGIATAN :
Pembuatan Prasarana Sanitasi (DAK)
PEKERJAAN :
Pembangunan Baru Tangki Septik Skala Komunal Desa Karalai 8 Unit (DAK)
LOKASI :
Kecamatan Tanah Siang
TAHUN :
2018
RENCANA ANGGARAN BIAYA (RAB)
Program : Program Pembangunan Prasarana Sanitasi
Kegiatan : Pembuatan Prasarana Sanitasi (DAK)
Pekerjaan : Pembangunan Baru Tangki Septik Skala Komunal Desa Karalai 8 Unit (DAK)
Lokasi : Kecamatan Tanah Siang
Tahun : 2018
I PEKERJAAN PENDAHULUAN
1 Pekerjaan Pengukuran dan Pembersihan Lokasi - 8.00 Keg 522,500.00 4,180,000.00
2 Biaya Operasional KSM - 1.00 Unit 2,000,000.00 2,000,000.00
3 Pemasangan Bowplank - 8.00 Unit 525,000.00 4,200,000.00
4 Pembuatan Papan Nama Kegiatan - 1.00 Bh 400,000.00 400,000.00
Jumlah I 10,780,000.00
Terbilang : ### LIMA RATUS ENAM PULUH SATU JUTA RUPIAH ###
PERHITUNGAN VOLUME
Program : Program Pembangunan Prasarana Sanitasi
Kegiatan : Pembuatan Prasarana Sanitasi (DAK)
Pekerjaan : Pembangunan Baru Tangki Septik Skala Komunal Desa Karalai 8 Unit (DAK)
Lokasi : Kecamatan Tanah Siang
Tahun : 2018
1 2 3 4
I PEKERJAAN PENDAHULUAN
1 Pekerjaan Pengukuran dan Pembersihan Lokasi
= 1.00 x 8.00 = 8.000
2 Biaya Operasional KSM
= 1.00 x 1.00 = 1.000
3 Pemasangan Bowplank
= 1.00 x 8.00 = 8.000
4 Pembuatan Papan Nama Kegiatan
= 1.00 = 1.00
II PEKERJAAN TANAH DAN URUGAN
1 Galian Tanah Septictank
Galian Septictank = 3.00 x 1.90 x 2.60 x 8.00 = 118.56
118.56 Jumlah = 118.560
2 Galian Tanah Pipa, Bak Kontrol dan Manhole
Galian Pipa (80% Panjang Pipa) = 819.20 x 0.20 x 0.50 = 81.92
Galian Bak Kontrol = 0.50 x 0.55 x 0.60 x 38.00 = 6.27
Galian Manhole = 0.70 x 0.80 x 0.75 x 27.00 = 11.34
Galian Manhole Resapan = 0.70 x 0.80 x 1.10 x 8.00 = 4.93
104.46 Jumlah = 104.458
3 Urugan Tanah Kembali
Urugan Galian Pipa = 81.92 - 8.19 - 6.44 = 67.29
67.29 Jumlah = 67.291
4 Urugan Pasir
Urugan Bawah Lantai Septicktank = 3.00 x 1.90 x 0.08 x 8.00 = 3.65
Urugan Pipa = 819.20 x 0.20 x 0.05 = 8.19
Urugan Bak Kontrol = 0.50 x 0.55 x 0.05 x 27.00 = 0.37
Urugan Galian Manhole = 0.70 x 0.80 x 0.05 x 27.00 = 0.76
12.97 Jumlah = 12.967
III PEKERJAAN BETON, DAN PASANGAN
1 Pek . Beton (f'c = 14,5 Mpa)
a Beton Sloof,Penyangga Media Bakteri, Kolom, Ring Balok dan Dinding Septictank (f'c = 14,5 Mpa)
Dinding Sisi Luar P = 2.70 x 1.95 x 0.10 x 2.00 = 1.05
Dinding Sisi Luar L = 1.50 x 2.07 x 0.10 x 2.00 = 0.62
Dinding Sisi Dalam P = 1.70 x 1.53 x 0.10 x 2.00 = 0.52
Dinding Sisi Dalam L = 0.50 x 1.53 x 0.10 x 2.00 = 0.15
Kaki Kolom Dalam = 0.35 x 0.15 x 0.15 x 2.00 = 0.02
Sloof Sisi Dalam P = 1.75 x 0.15 x 0.20 x 2.00 = 0.11
Sloof Sisi Dalam L = 0.55 x 0.15 x 0.20 x 2.00 = 0.03
Penyangga = 2.60 x 0.10 0.10 x 2.00 = 0.05
8.00 x 2.55 Jumlah = 20.424
1 2 3 4
0.20 Jumlah = 0.196
2 Pek. Pembesian
a Pembesian Sloof Septictank Ø 10 dan 8 mm Jarak 15 Cm
Pembesian Horizontal :
Sloof Sisi Luar P = 2.80 x 4.00 x 0.62 x 2.00 = 13.82
Sloof Sisi Luar L = 1.60 x 4.00 x 0.62 x 2.00 = 7.90
Sloof Sisi Dalam P = 1.85 x 4.00 x 0.62 x 2.00 = 9.13
Sloof Sisi Dalam L = 0.65 x 4.00 x 0.62 x 2.00 = 3.21
8.00 x 34.06
Pembesian Vertikal :
Sloof Sisi Luar P = 2.70 : 0.15 x 0.50 x 0.40 x 2.00 = 7.51
Sloof Sisi Luar L = 1.60 : 0.15 x 0.50 x 0.40 x 2.00 = 4.35
Sloof Sisi Dalam P = 1.75 : 0.15 x 0.70 x 0.40 x 2.00 = 6.64
Sloof Sisi Dalam L = 0.55 : 0.15 x 0.70 x 0.40 x 2.00 = 2.21
8.00 x 20.70 Jumlah = 438.051
b Pembesian Lantai Septictank Ø 10 mm Jarak 15 Cm
Pembesian A = 2.80 : 0.15 x 1.60 x 0.62 x 8.00 = 150.05
150.05
Pembesian B = 1.60 : 0.15 x 2.80 x 0.62 x 8.00 = 152.03
152.03 Jumlah = 302.083
c Pembesian Kolom Septictank Ø 10 mm Jarak 15 Cm
Pembesian Vertikal :
Kolom Sisi Luar = 2.15 x 4.00 x 0.62 x 4.00 = 21.22
Kolom Sisi Dalam = 1.73 x 4.00 x 0.62 x 4.00 = 17.08
Kaki Kolom Dalam = 0.55 x 4.00 x 0.62 x 2.00 = 2.71
8.00 x 41.02
Pembesian Horizontal :
Kolom Sisi Luar = 1.95 : 0.15 x 0.42 x 0.40 x 4.00 = 9.29
Kolom Sisi Dalam = 1.53 : 0.15 x 0.42 x 0.40 x 4.00 = 7.30
Kaki Kolom Dalam = 0.35 : 0.15 x 0.50 x 0.40 x 2.00 = 1.19
8.00 x 17.78 Jumlah = 470.345
d Pembesian Dinding Septictank Ø 10 mm Jarak 15 Cm
Pembesian Vertikal :
Dinding Sisi Luar P = 2.70 : 0.15 x 2.15 x 0.62 x 2.00 = 50.41
Dinding Sisi Luar L = 1.50 : 0.15 x 2.27 x 0.62 x 2.00 = 30.81
Dinding Sisi Dalam P = 1.70 : 0.15 x 1.73 x 0.62 x 2.00 = 25.62
Dinding Sisi Dalam L = 0.50 : 0.15 x 1.73 x 0.62 x 2.00 = 8.54
8.00 x 115.38
Pembesian Horizontal :
Dinding Sisi Luar P = 2.05 : 0.15 x 2.90 x 0.62 x 2.00 = 50.10
Dinding Sisi Luar L = 2.17 : 0.15 x 1.70 x 0.62 x 2.00 = 31.47
Dinding Sisi Dalam P = 1.63 : 0.15 x 1.90 x 0.62 x 2.00 = 25.79
Dinding Sisi Dalam L = 1.63 : 0.15 x 0.70 x 0.62 x 2.00 = 9.50
8.00 x 116.86 Jumlah = 1,857.910
e Pembesian Ring Balok Septictank Ø 10 dan 8 mm Jarak 15 Cm
Pembesian Horizontal :
Balok Sisi Luar P = 2.80 x 4.00 x 0.62 x 2.00 = 13.82
Balok Sisi Luar L = 1.60 x 4.00 x 0.62 x 2.00 = 7.90
Balok Sisi Dalam P = 1.80 x 4.00 x 0.62 x 2.00 = 8.88
Balok Sisi Dalam L = 0.60 x 4.00 x 0.62 x 2.00 = 2.96
8.00 x 33.56
Pembesian Vertikal :
Balok Sisi Luar P = 2.70 : 0.15 x 0.42 x 0.40 x 2.00 = 6.30
Balok Sisi Luar L = 1.30 : 0.15 x 0.42 x 0.40 x 2.00 = 2.99
Balok Sisi Dalam P = 1.70 : 0.15 x 0.42 x 0.40 x 2.00 = 3.98
Balok Sisi Dalam L = 0.30 : 0.15 x 0.42 x 0.40 x 2.00 = 1.00
8.00 x 14.27 Jumlah = 382.658
f Pembesian Penutup Septictank Ø 10 mm Jarak 15 Cm
Pembesian A = 2.80 : 0.15 x 2.00 x 0.62 x 2.00 = 23.45
8.00 x 23.45
Pembesian B = 1.60 : 0.15 x 3.20 x 0.62 x 2.00 = 21.72
8.00 x 21.72 Jumlah = 361.315
g Pembesian Bak Kontrol Ø 10 mm Jarak 15 Cm 45.164
Pembesian Vertikal
Manhole = 0.40 : 0.15 x 0.45 x 0.62 x 4.00 = 3.33
Pembesian Horizontal
Manhole = 0.35 : 0.15 x 0.40 x 0.62 x 4.00 = 2.96
38.00 6.29 Jumlah = 239.149
h Pembesian Lantai dan Penutup Bak Kontrol Ø 10 mm Jarak 15 Cm
Pembesian Lantai = 0.40 : 0.15 x 0.40 x 0.62 x 2.00 = 1.48
1.48
Pembesian Penutup = 0.50 : 0.15 x 0.45 x 0.62 x 2.00 = 2.22
38.00 x 2.22 Jumlah = 84.406
i Pembesian Manhole Ø 10 mm Jarak 15 Cm
Pembesian Vertikal
Manhole = 0.60 : 0.15 x 0.55 x 0.62 x 4.00 = 6.79
No. URAIAN PEKERJAAN Uraian Perhitungan Jumlah
1 2 3 4
Pembesian Horizontal
Manhole = 0.60 : 0.15 x 0.60 x 0.62 x 4.00 = 7.40
27.00 x 14.19 Jumlah = 383.157
j Pembesian Lantai dan Penutup Manhole Ø 10 mm Jarak 15 Cm
Pembesian Lantai = 0.60 : 0.15 x 0.60 x 0.62 x 2.00 = 3.70
3.70
Pembesian Penutup = 0.70 : 0.15 x 0.65 x 0.62 x 2.00 = 4.01
27.00 x 4.01 Jumlah = 108.284
k Pembesian Manhole Resapan Ø 10 mm Jarak 15 Cm
Pembesian Vertikal
Manhole Resapan = 0.60 : 0.15 x 0.95 x 0.62 x 4.00 = 11.72
Pembesian Horizontal
Manhole Resapan = 1.00 : 0.15 x 0.60 x 0.62 x 4.00 = 10.37
8.00 x 22.09 Jumlah = 176.709
l Pembesian Penutup Manhole Resapan Ø 10 mm Jarak 15 Cm
Pembesian Penutup = 0.70 : 0.15 x 0.65 x 0.62 x 2.00 = 4.01
8.00 x 4.01 Jumlah = 32.084
3 Pek. Bekisting
a Bekisting Bawah Sloof Septictank
Sloof Sisi Luar P = 2.80 x 0.10 x 8.00 = 2.24
Sloof Sisi Luar L = 1.60 x 0.10 x 8.00 = 1.28
Sloof Sisi Dalam P = 1.75 x 0.10 x 3.00 x 8.00 = 4.20
Sloof Sisi Dalam L = 0.55 x 0.10 x 3.00 x 8.00 = 1.32
9.04 Jumlah = 9.040
b Bekisting Kolom, Dinding dan Ring Balok Septictank
Dinding Sisi Luar P = 2.70 x 1.95 x 2.00 x 2.00 = 21.06
Dinding Sisi Luar L = 1.50 x 2.07 x 2.00 x 2.00 = 12.42
Dinding Sisi Dalam P = 1.70 x 1.53 x 2.00 x 2.00 = 10.40
Dinding Sisi Dalam L = 0.50 x 1.53 x 2.00 x 2.00 = 3.06
Kaki Kolom Dalam = 0.35 x 0.15 x 4.00 x 2.00 = 0.42
x 8.00 x 47.36 Jumlah = 378.912
c Bekisting Penutup Septictank
= 2.80 x 1.60 x 8.00 = 35.84
35.84 Jumlah = 35.840
d Bekisting Bak Kontrol
= 0.40 x 0.45 4.00 x 2.00 x 38.00 = 54.72
54.72 Jumlah = 54.720
e Bekisting Bak Manhole
= 0.60 x 0.65 4.00 x 2.00 x 27.00 = 84.24
84.24 Jumlah = 84.240
f Bekisting Bak Manhole Resapan
= 0.60 x 1.00 4.00 x 2.00 x 8.00 = 38.40
38.40 Jumlah = 38.400
4 Pek. Plesteran
Plesteran Dinding Sisi Dalam P = 2.60 x 1.93 x x 2.00 = 10.04
Plesteran Dinding Sisi Dalam L = 1.40 x 2.06 x x 2.00 = 5.77
Plesteran Dinding Sisi Dalam Luar P = 1.70 x 1.73 x 2.00 x 2.00 = 11.76
Plesteran Dinding Sisi Dalam Luar L = 0.50 x 1.73 x 2.00 x 2.00 = 3.46
Plesteran Lantai 2.60 x 1.50 x 3.90
8.00 x 279.42 Jumlah = 279.424
5 Pek. Acian
Acian Dinding Sisi Dalam P = 2.50 x 1.93 x x 2.00 = 9.65
Acian Dinding Sisi Dalam L = 1.40 x 2.06 x x 2.00 = 5.77
Acian Dinding Sisi Dalam Luar P = 1.70 x 1.73 x 2.00 x 2.00 = 11.76
Acian Dinding Sisi Dalam Luar L = 0.50 x 1.73 x 2.00 x 2.00 = 3.46
Acian Kaki Kolom = 0.35 x 0.15 x 4.00 x 4.00 = 0.84
AcianLantai 2.60 x 1.50 x = 3.90
8.00 x 283.06
Acian Dinding Bak Kontrol = 0.30 x 0.35 x 4.00 x 38.00 = 15.96
Acian Lantai Bak Kontrol = 0.40 x 0.40 x 38.00 = 6.08
22.04
Acian Dinding Manhole = 0.50 x 0.55 x 4.00 x 27.00 = 29.70
Acian Dinding Manhole Resapan = 0.50 x 1.00 x 4.00 x 8.00 = 16.00
Acian Lantai Manhole = 0.60 x 0.60 x 27.00 = 9.72
55.42 Jumlah = 360.516
6 Pek. Pas. Ulin 5/7 Cm Penyangga Media Bakteri
Sisi Panjang = 1.40 x 0.07 x 0.05 x 8.00 = 0.04
Sisi Pendek = 0.40 x 0.07 x 0.05 x 36.00 = 0.05
8.00 x 0.09 Jumlah = 0.717
7 Plastik Cor
Lantai Septictank = 2.90 x 1.70 x 8.00 = 39.44
Lantai Bak Kontrol = 0.50 x 0.50 x 38.00 = 9.50
Lantai Manhole = 0.70 x 0.70 x 27.00 = 13.23
62.17 Jumlah = 62.170
8 Pek. Pas. Pipa PVC Ø 4" AW
No. URAIAN PEKERJAAN Uraian Perhitungan Jumlah
1 2 3 4
Pipa Septictank = 1.00 + 2.00 x 2.00 x 8.00 = 48.00
Pipa Outlet = 4.00 x 8.00 = 32.00
Pipa Jaringan dan SR = 1,024.00 = 1,024.00
1,104.00 Jumlah = 1,104.000
9 Pemasangan / Pegadaan Media Bakteri Botol Plastik (Tersusun Sarang Tawon )
= 1.00 x 8.00 = 8.00
8.00 Jumlah = 8.000
10 Pek. Pas. Aksesoris Pipa
a Elbow PVC Ø 4"
Septictank = 4.00 x 8.00 = 32.00
32.00 Jumlah = 32.000
b Tee PVC Ø 4"
Septictank = 3.00 x 8.00 = 24.00
24.00 Jumlah = 24.000
PERHITUNGAN VOLUME
Jumlah
Keg
Unit
Unit
Bh
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
Jumlah
4
M3
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Jumlah
Kg
Kg
Kg
Kg
M2
M2
M2
M2
M2
M2
M2
M2
M3
M2
Jumlah
M'
Unit
Bh
Bh
ANALISA
A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.75 109,798.00 82,348.50
Mandor L.04 OH 0.025 120,120.00 3,003.00
JUMLAH TENAGA KERJA 85,351.50
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.9 109,798.00 98,818.20
Mandor L.04 OH 0.045 120,120.00 5,405.40
JUMLAH TENAGA KERJA 104,223.60
B BAHAN
Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5 109,798.00 54,899.00
Mandor L.04 OH 0.05 120,120.00 6,006.00
JUMLAH TENAGA KERJA 60,905.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3 109,798.00 32,939.40
Mandor L.04 OH 0.01 120,120.00 1,201.20
JUMLAH TENAGA KERJA 34,140.60
B BAHAN
Pasir urug 1.200 171,000.00 205,200.00
JUMLAH HARGA BAHAN 205,200.00
C PERALATAN
CATATAN
Bobot isi pasir = 1.400 kg/m3. Bobot isi kerikil = 1.350 kg/m3. Buckling factor pasir = 20 %
A.4.1.1.2. Membuat 1 m3 beton mutu f’ = 9.8 MPa (K 125). slump (12 ± 2) cm. w/c = 0.78
w/c = 0.87
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 109,798.00 181,166.70
Tukang Batu L.02 OH 0.275 111,930.00 30,780.75
Kepala Tukang L.03 OH 0.028 117,260.00 3,283.28
Mandor L.04 OH 0.083 120,120.00 9,969.96
JUMLAH TENAGA KERJA 225,200.69
B BAHAN
Semen Portland kg 276 1,700.00 469,200.00
Pasir Beton kg 828 250.00 207,000.00
Kerikil (Maks 30mm) kg 1012 366.67 371,066.67
Air Liter 215
JUMLAH HARGA BAHAN 1,047,266.67
C PERALATAN
A. A.4.1.1.5. Membuat 1 m3 beton mutu f’ = 14.5 MPa. slump (12 ± 2) cm. w/c = 0.66
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 109,798.00 181,166.70
Tukang Batu L.02 OH 0.275 111,930.00 30,780.75
Kepala Tukang L.03 OH 0.028 117,260.00 3,283.28
Mandor L.04 OH 0.083 120,120.00 9,969.96
JUMLAH TENAGA KERJA 225,200.69
B BAHAN
Semen Portland kg 326 1,700.00 554,200.00
Pasir Beton kg 760 250.00 190,000.00
Kerikil (Maks 30mm) kg 1029 366.67 377,300.00
Air Liter 215
JUMLAH HARGA BAHAN 1,121,500.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.07 109,798.00 7,685.86
Tukang Besi L.02 OH 0.07 111,930.00 7,835.10
Kepala Tukang L.03 OH 0.007 117,260.00 820.82
Mandor L.04 OH 0.004 120,120.00 480.48
JUMLAH TENAGA KERJA 16,822.26
B BAHAN
Besi beton (polos/ulir) kg 10.500 14,000.00 147,000.00
Kawat beton kg 0.15 26,000.00 3,900.00
JUMLAH HARGA BAHAN 150,900.00
C PERALATAN
JUMLAH HARGA ALAT
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.52 109,798.00 57,094.96
Tukang Kayu L.02 OH 0.26 111,930.00 29,101.80
Kepala Tukang L.03 OH 0.026 117,260.00 3,048.76
Mandor L.04 OH 0.026 120,120.00 3,123.12
JUMLAH TENAGA KERJA 92,368.64
B BAHAN
Kayu kelas III m3 0.022 1,612,000.00 35,464.00
Paku 5 cm – 10 cm kg 0.15 26,000.00 3,900.00
Minyak bekisting Liter 0 36,400.00 -
JUMLAH HARGA BAHAN 39,364.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.66 109,798.00 72,466.68
Tukang Kayu L.02 OH 0.33 111,930.00 36,936.90
Kepala Tukang L.03 OH 0.033 117,260.00 3,869.58
Mandor L.04 OH 0.033 120,120.00 3,963.96
JUMLAH TENAGA KERJA 117,237.12
B BAHAN
Kayu kelas III m3 0.040 1,612,000.00 64,480.00
Paku 5 cm – 12 cm kg 0.400 26,000.00 10,400.00
Minyak bekisting Liter 0.000 36,400.00 -
Balok kayu Bekisting m3 0.015 803,088.00 12,046.32
Dolken kayu galam. 8–10 cm
Batang 3.000 9,880.00 29,640.00
panjang 4 m
JUMLAH HARGA BAHAN 116,566.32
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.66 109,798.00 72,466.68
Tukang Kayu L.02 OH 0.33 111,930.00 36,936.90
Kepala Tukang L.03 OH 0.033 117,260.00 3,869.58
Mandor L.04 OH 0.033 120,120.00 3,963.96
JUMLAH TENAGA KERJA 117,237.12
B BAHAN
Kayu kelas III m3 0.030 1,612,000.00 48,360.00
Paku 5 cm – 12 cm kg 0.400 26,000.00 10,400.00
Minyak bekisting Liter 0.000 36,400.00 -
Balok kayu Bekisting m3 0.020 803,088.00 16,061.76
Dolken kayu , 8–10 cm, panj. 4 m
Batang 3.000 9,880.00 29,640.00
JUMLAH HARGA BAHAN 104,461.76
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 221,698.88
E Harga Satuan Pekerjaan 221,698.88
A.4.1.1.25.b. Pemasangan 1 m2 Bekisting untuk manhole dan bak kontrol
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.66 109,798.00 72,466.68
Tukang Kayu L.02 OH 0.33 111,930.00 36,936.90
Kepala Tukang L.03 OH 0.033 117,260.00 3,869.58
Mandor L.04 OH 0.033 120,120.00 3,963.96
JUMLAH TENAGA KERJA 117,237.12
B BAHAN
Kayu kelas III m3 0.030 1,612,000.00 48,360.00
Paku 5 cm – 12 cm kg 0.400 26,000.00 10,400.00
Minyak bekisting Liter 0.000 36,400.00 -
Balok kayu Bekisting m3 0.020 803,088.00 16,061.76
Dolken kayu , 8–10 cm, panj. 4 m
Batang 0.000 9,880.00 -
JUMLAH HARGA BAHAN 74,821.76
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 109,798.00 32,939.40
Tukang Batu L.03 OH 0.150 111,930.00 16,789.50
Kepala Tukang L.03 OH 0.015 117,260.00 1,758.90
Mandor L.04 OH 0.015 120,120.00 1,801.80
JUMLAH TENAGA KERJA 53,289.60
B BAHAN
Semen PC Kg 6.240 1,700.00 10,608.00
Pasir m3 0.024 495,000.00 11,880.00
JUMLAH HARGA BAHAN 22,488.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 109,798.00 21,959.60
Tukang Batu L.03 OH 0.100 111,930.00 11,193.00
Kepala Tukang L.03 OH 0.010 117,260.00 1,172.60
Mandor L.04 OH 0.010 120,120.00 1,201.20
JUMLAH TENAGA KERJA 35,526.40
B BAHAN
Semen PC Kg 3.250 1,700.00 5,525.00
JUMLAH HARGA BAHAN 5,525.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 109,798.00 8,893.64
Tukang batu L.02 0.135 111,930.00 15,110.55
Kepala tukang L.03 0.0135 117,260.00 1,583.01
Mandor L.04 OH 0.004 120,120.00 480.48
JUMLAH TENAGA KERJA 26,067.68
B BAHAN
Pipa PVC 4” M 1.2 119,275.00 143,130.00
Perlengkapan % 10 119,275.00 11,927.50
JUMLAH HARGA BAHAN 155,057.50
C PERALATAN
A. BAHAN
Keterangan :
Regional I : Kecamatan Murung
(7) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(9) + (11)
(10) + (11)
(9) + (11)
(10) + (11)
(10) + (11)
(7) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(9) + (11)
(10) + (11)
(9) + (11)
(10) + (11)
(10) + (11)
(7) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(9) + (11)
(10) + (11)
(9) + (11)
(10) + (11)
(10) + (11)
(7) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(9) + (11)
(10) + (11)
(9) + (11)
(10) + (11)
(10) + (11)
(7) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(9) + (11)
(10) + (11)
(9) + (11)
(10) + (11)
(10) + (11)
(7) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(9) + (11)
(10) + (11)
(9) + (11)
(10) + (11)
(10) + (11)
(7) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(9) + (11)
(10) + (11)
(9) + (11)
(10) + (11)
(10) + (11)
(7) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(9) + (11)
(10) + (11)
(9) + (11)
(10) + (11)
(10) + (11)
(7) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(9) + (11)
(10) + (11)
(9) + (11)
(10) + (11)
(10) + (11)
(7) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(9) + (11)
(10) + (11)
(9) + (11)
(10) + (11)
(10) + (11)
(7) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(9) + (11)
(10) + (11)
(9) + (11)
(10) + (11)
(10) + (11)
(7) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(9) + (11)
(10) + (11)
(9) + (11)
(10) + (11)
(10) + (11)
(7) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(9) + (11)
(10) + (11)
(9) + (11)
(10) + (11)
(10) + (11)
(7) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(9) + (11)
(10) + (11)
(9) + (11)
(10) + (11)
(10) + (11)
(7) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(9) + (11)
(10) + (11)
(9) + (11)
(10) + (11)
(10) + (11)
(7) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(9) + (11)
(10) + (11)
(9) + (11)
(10) + (11)
(10) + (11)
(7) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(9) + (11)
(10) + (11)
(9) + (11)
(10) + (11)
(10) + (11)
(7) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(9) + (11)
(10) + (11)
(9) + (11)
(10) + (11)
(10) + (11)
(7) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(9) + (11)
(10) + (11)
(9) + (11)
(10) + (11)
(10) + (11)
(7) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(9) + (11)
(10) + (11)
(9) + (11)
(10) + (11)
(10) + (11)
(7) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(9) + (11)
(10) + (11)
(9) + (11)
(10) + (11)
(10) + (11)
(7) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(9) + (11)
(10) + (11)
(9) + (11)
(10) + (11)
(10) + (11)
(7) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(8) + (11)
(9) + (11)
(10) + (11)
(9) + (11)
(10) + (11)
(10) + (11)
AN UMUM
B. BAHAN UMUM
Catatan :
- Harga Setempat sudah termasuk Pungutan Resmi Lainnya (sesuai daerah ybs);
- Harga Total sudah termasuk Pajak dan Keuntungan Pelaksana;
- Harga Satuan ini bukan Harga Mutlak yang dijadikan pedoman pengadaan barang dan jasa pemerintah sesuai
ketentuan peraturan perundang-undangan;
- Untuk Lokasi yang sulit ditempuh lewat jalan darat dan jauh dari pinggir sungai perlu ditambah dengan
Ongkos Angkut sesuai jauh lokasi atau jarak tempuh angkutan (darat/sungai).
Keterangan :
Regional I : Kecamatan Murung
- Harga Bahan Pabrikasi dihitung Harga Pabrik + Ongkos Kirim + Pajak PPN dan Keuntungan Pelaksana.
D. UPAH
1 2 3 4
Keterangan :
Regional I : Kecamatan Murung
pemerintah sesuai
REGIONAL
REGION I REGION II REGION III REGION IV
Kec. Tanah Siang Kec. Sumber Barito
Harga Dasar Kec. Barito Tuhup Raya Kec. Sei Babuat Kec. U'ut Murung
Kec. Murung KET.
(Rp.) Kec. Laung Tuhup Kec. Permata Intan Kec. Seribu Riam
Kec. Tanah Siang Selatan
Total Total Total Total
(Rp.) (Rp.) (Rp.) (Rp.)
5 6 7 8 9 10