SECTION (03.2)
EARTH WORK
Reference shall be made to section (3) of Specifications.
Excavation in ordinary soil including scaffoldings and
transportation of excavated material to dump areas approved
3.2.01
by the Organization and concerned Authorities and
compensation for excavation outside the geometric measured
volumes. (Including excavation for external stairs and
escalators).
Rate per cubic meter 3
m 2600
Total to Collection
Page 1 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
Replacement soil (structural fill) under foundation level with
soil as per specified in geotechnical report. measured from
bottom of plain concrete by layers not more than 250 mm for
3.2.04
each layer thickness. The price includes the compaction till not
less than 95% as compaction percentage from modified
proctor test and all requested tests as per geotechnical report,
project specifications and the Egyptian code of practice of soil
mechanics. …. (m3).
Rate per cubic meter 3
m 12000
Fill soil behind the retaining walls and narrow areas with
3.2.07 cemented sand (150 kg/m3) as shown in design drawings. The
price includes all requested tests as per project specifications
and the Egyptian code of practice of soil mechanics
Total to Collection
Page 2 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
3.2.08 Replacement soil backfill a layer of( aggregate + sand) at a
ratio of (2:1) between and above foundation level as per
specified in project specs. measured from the foundation level
by layers not more than 250 mm for each layer thickness. The
price includes the compaction till not less than 95% as m
3
NA
compaction percentage from modified proctor test and all
requested tests as per geotechnical report, project
specifications and the Egyptian code of practice of soil
mechanics.
shoring
3.2.10 Supply and installation of shoring systems as needed to
protect adjacent properties,Rate includes the design of the
shoring system and submission of all necessary drawings and
C.N for the organization approval. Rate per linear meter of the
shoring system (secent piles,sheet piles,purlin wall ...etc.)
Rate per linear meter m NA
Page 3 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
SECTION (03.2)
EARTH WORK
Total of page 1
Total of page2
Total of page3
Total to Summary
Page 4 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
SECTION (05)
CONCRETE WORKS
Reference is to be made to section (5) of Specifications.
Plain Concrete
Total to Collection
Page 5 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
Reinforced Concrete
N.B.: Rates of concrete works include all expenses related to
the supply of materials, labour, plant, equipment, mixes design
.mixing, scaffolding, installation and dismantling of forms,
placement, construction joints, curing, testing, site laboratory,
admixtures (additives such as plasticizer) and all required to
conform with drawings and specifications, and satisfy
contractual obligations . Rates excludes reinforcement unless
otherwise stated in item. The price also includes the use of
sulphate resistant cement and other requirements as indicated
to soil report and durability requirements stated in spec item
(1.5).
Page 6 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
Total to Collection
Page 7 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
5.09 Reinforced concrete of minimum characteristic cube strength
40 MPa {Equivalent cylinder strength 32 MPa} of minimum
3
sulphate resistant cement content 460 kg/m of concrete,
excluding steel reinforcement.
Rate per cubic meter
a. For columns 3
m NA
b. For slabs 3
m NA
c. For slabs on corrugated sheets 3
m NA
d. For stairs 3
m NA
e. For parapets 3
m NA
f. For shear walls and cores 3
m NA
g. For beams and frames 3
m NA
h. For retaining walls 3
m NA
5.10
Supply and install of steel reinforcement. Rate includes supply
of materials, cutting, shaping, assembly, installation, splicing,
losses, chairs binding wire, testing and all other expenses
required to comply with the specifications. (Including steel
reinforcement for all RC elements).
Rate per ton
a. Steel Fy =500 MPA T 3075
Total to Collection
Page 8 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
SECTION (05)
CONCRETE WORKS
Total of page 5
Total of page 6
Total of page 7
Total of page 8
Total to Summary
Page 9 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
SECTION (06)
Total to Collection
Page 10 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
Precast reinforced concrete of minimum characteristic cube
strength 40 MPa {Equivalent cylinder strength 32 MPa} of
3
minimum sulphate resistant cement content 460 kg/m of
6.02
concrete, using concrete with fly ash or alternatively GGBS or
silica fume as approved by the Organization, excluding steel
reinforcement. Include all materials used in fixation or joints
fillers
Rate per cubic meter
a. For columns (fair faced) 3
m NA
b. For slabs (fair faced) 3
m NA
c. For beams (fair faced) 3
m NA
d. For footings (fair faced) 3
m NA
e. For walls (fair faced) 3
m NA
Total to Collection
Page 11 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
6.04 Supply and install reinforcement precast concrete crash
barrier of minimum cube strength 40mpa including joint
treatment 300 kg cement per cubic meter of sand ( contractor
is to submit complete details of units and method of fixation to
rate per linear meter m NA
Page 12 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
SECTION (06)
Total of page 10
Total of page 11
Total of page 12
Total to Summary
Page 13 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
SECTION (08)
a. Steel Sections T
2
8.03 Structural Steel grade ST - 37 (Fy =2.40t/cm ) without fire
resisting coating.
Rate per ton
2
Structural Steel grade ST - 37 (Fy =2.40t/cm ) (painted with
8.04
fire resistant coating measured in items (8.07&8.08).
Total to Collection
Page 14 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
Supply and install of checkered plates for stairs (thickness will
be according to approved DWG) prepared for applying
8.06
adhesive for granite installation For external and internal stairs
(bottom of checkered plate to be coated with zinc epoxy 80
micron thick).
Rate per square meter 2
m NA
8.07 2
Structural Steel grade ST - 52 (Fy =3.60t/cm ) without fire
resisting coating.
for steel sheds above platforms (rate per ton) T NA
8.08 Supply & install of ball joints space truss . the price shall
include submit of the full detailed drawings, design calculation
of the space truss system and connections with concrete
columns , specs and method statement for review before
construction.
Rate per square meter 2
m NA
Page 15 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
SECTION (08)
Total of page 14
Total of page 15
Total to Summary
Page 16 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
SECTION (10)
Page 17 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
SECTION (10)
Total of page 17
Total to Summary
Page 18 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
SECTION (17)
Screeds
17.01 Fiber Reinforced Screed, with required thickness, Refer Floor
M2 24223
Finishes, compressive strength between 20-25 Mpa.
Page 19 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
SECTION (17)
Total of page 19
Total to Summary
Page 20 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
SECTION (02)
MASONRY
Page 21 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
SECTION (02)
MASONRY
Total of page 21
Total to Summary
Page 22 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
SECTION (03)
Page 23 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
SECTION (03)
Total of page 23
Total to Summary
Page 24 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
SECTION (04)
THERMAL INSULATION
4.01 Supply and installation of thermal insulation for roofing
consisting of extruded polystyrene board 50mm thick and a
M2 6566
polyethylene sheet 400 micron thick, in accordance with
Specifications, Section (04).
4.02 Thermal Insulation Board 50 mm thick Mineral Wool behind
spandrel panels, External stone claddings, and/or inbetween
M2 10223
External cavity walls where required and as specified in
drawings and Tech. specifications
Total to Collection
Page 25 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
SECTION (04)
THERMAL INSULATION
Total of page 25
Total to Summary
Page 26 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
SECTION (17)
Screeds
17.01 Fiber Reinforced Screed, with required thickness, Refer Floor
M2 24223
Finishes, compressive strength between 20-25 Mpa.
Page 27 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
SECTION (17)
Total of page 27
Total to Summary
Page 28 of 29
CLIENT : NATIONAL AUTHORITY FOR TUNNELS
PROJECT : EETS - ELECTRICAL EXPRESS TRAIN STATIONS
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
NOTE
EGP. EGP.
EARTH WORK
CONCRETE WORKS
MASONRY
THERMAL INSULATION
TOTAL
Page 29 of 29