Space Utilisation WSP Project

1) Total scope of work


1.1 To add 2D furniture plan in the CAD drawings
1.2 Translate the exsting furniture layout of each room on to the cad floor plan
1.3 Adtocad DWG of each floor plan with furniture added to the agreed layers
1.4 Shows previous experience, translating hand drawn sketches to CAD
1.5 To complience with NSW codes, NSW guidelines, EMS guildelines
2) Extra liabilites
2.1 Bad planing leads to quality problems
2.2 Environmental, health and safety liabilities
2.3 construction plans
2.4 Property Damage
2.5 Labour violation
2.6 Worker injury
2.7 Avoid wasting time later by planing more now
3) Risk consideration for Quote
3.1 construction plans
3.2 Change orders and variations
3.3 Delay dispute and resolution
3.4 Delay contract and project payments
3.5 Defective design or delivery
3.6 Availablity of funding
3.7 Lack of coordination and/or communication 
3.8 Changes in work
3.9 Delayed deliveries and disruptions
3.10 Unsuitable equipment and materials