This document outlines the scope of work, extra liabilities, and risk considerations for a space utilization project that involves adding 2D furniture plans to CAD drawings of floor plans in compliance with various codes and guidelines. The scope of work includes translating existing furniture layouts onto CAD floor plans and producing final drawings. Extra liabilities that could arise include quality issues from poor planning, environmental/safety issues, and worker injury. Risks to consider for quoting include construction plan issues, payment delays, design or delivery defects, funding availability, and coordination/material problems.
This document outlines the scope of work, extra liabilities, and risk considerations for a space utilization project that involves adding 2D furniture plans to CAD drawings of floor plans in compliance with various codes and guidelines. The scope of work includes translating existing furniture layouts onto CAD floor plans and producing final drawings. Extra liabilities that could arise include quality issues from poor planning, environmental/safety issues, and worker injury. Risks to consider for quoting include construction plan issues, payment delays, design or delivery defects, funding availability, and coordination/material problems.
This document outlines the scope of work, extra liabilities, and risk considerations for a space utilization project that involves adding 2D furniture plans to CAD drawings of floor plans in compliance with various codes and guidelines. The scope of work includes translating existing furniture layouts onto CAD floor plans and producing final drawings. Extra liabilities that could arise include quality issues from poor planning, environmental/safety issues, and worker injury. Risks to consider for quoting include construction plan issues, payment delays, design or delivery defects, funding availability, and coordination/material problems.
1.1 To add 2D furniture plan in the CAD drawings 1.2 Translate the exsting furniture layout of each room on to the cad floor plan 1.3 Adtocad DWG of each floor plan with furniture added to the agreed layers 1.4 Shows previous experience, translating hand drawn sketches to CAD 1.5 To complience with NSW codes, NSW guidelines, EMS guildelines 2) Extra liabilites 2.1 Bad planing leads to quality problems 2.2 Environmental, health and safety liabilities 2.3 construction plans 2.4 Property Damage 2.5 Labour violation 2.6 Worker injury 2.7 Avoid wasting time later by planing more now 3) Risk consideration for Quote 3.1 construction plans 3.2 Change orders and variations 3.3 Delay dispute and resolution 3.4 Delay contract and project payments 3.5 Defective design or delivery 3.6 Availablity of funding 3.7 Lack of coordination and/or communication 3.8 Changes in work 3.9 Delayed deliveries and disruptions 3.10 Unsuitable equipment and materials