You are on page 1of 1

Contingency Plan

Name of Production: The InSync Motion Producers Name: Tee Rowe Contact Number:
07561 636710

Location / Potential problem Effect on production Control Measure Existing measures


scene
Weather, Transport, Damaged equipment with Check the weather and make sure Plan everything out according to the
Wallisdown People costly repairs, to properly survey an area that is times of day where there are less
Road Illness or injury prone due safe. people which means less room for
to weather and the error and anxiety about general
busyness of the location. problems occurring.
Bournemouth Weather, Transport, Won't be able to film Check the weather and make sure Plan out everything to the very last
Gardens People which slows down to properly survey an area that is detail, and don’t be afraid to change
production. Damaged safe and find a quieter area that the date if things aren’t looking how,
equipment with costly isn’t surrounded by people so they you expect them to on the day.
repairs, don’t disturb and you don’t disturb
them.

You might also like