PROJECT: BUILDING FAÇADE CLEANING

ITEM NO DESCRIPTION Total UNIT MATERIALS/LABOR


GENERAL REQUIREMENT Qty. Unit cost Amount
1.0 1.) Mobilization/demobilization
2. Access to the work area using rappelling
1 Lot
2.0
3. Supply of cleaning tools, materials, chemicals,
and consumables. 1 Lot
3.0
4. Professional cleaning of the exterior glass
windows, frames, glass walls, granite
marbles/stones, aluminum claddings (fins, columns
and canopy) of Shang Salcedo Place 1 Lot

4.0
5. Provide Bonds and Insurance. 1 Lot
5.0
6.0 Labor
7.0 MARK-UP

8.0 12% VAT


TOTAL PROJECT COST (Estimated)