You are on page 1of 3

THE PROCESS FLOW CHART OF SPRING STEEL BRIGHT BAR FOR

INDOSPRING
R16-004/0-02
Raw material supplier withdrawal to supplier
NO

Inspection of raw 5
Is the result OK?

YES

Ore powder and Fuel

Molten iron

Scrap steel and


accessorial material

10 Feed material to BOF

NO

25
20 Smelting in 100t BOF Is the result OK?

YES

30 Refining in 100t LF 35
Is the result OK?

YES

NO

45
Vacuum degassing in Is the result OK?
40
100t RH

YES
报废
NO

Continuous casting 55
Is the result OK? △ KCC
50 390mm×510mm
YES
1
No.2 factory rolling line
NO
65
60 (Big bar rolling line) Are the time and
temperature OK?
Bloom Heating
YES

NO Reject

Rolling to billet 75 Is the length and


70 surface quality OK?
(200×200)

YES

NO Reject

85 Is the length and


80 Sawing surface quality OK?

YES

Wire factory NO
95 Are the time and
90 Billet Heating temperature OK?

YES

NO Reject
△ KCC
Rolled to the wire 105 semifinished
100 △ KPC
(φ10-20) product test

YES

NO
Bright Factory
115 Hardness is ok?
110 Softening annealing

YES
NO Reject
△ KCC
125 finished products
120 Drawing,Cutting,Grinding inspection

YES

130 Eddy current testing △ KPC

140 Package
2
150 Stored in Warehouse
Special characteristic symbol △

THE PROCESS FLOW CHART OF SPRING STEEL


BRIGHT BAR FOR INDOSPRING ( SUP12 SUP12V)
Editor:Wu Ming No:LC-2016-373-01
Auditor:Huang Zhen Date:2016-03-05
江阴兴澄特种钢铁有限公司
JIANG YIN XING CHENG SPECIAL STEEL WORKS CO., LTD

You might also like