Annex 1-C Drawings RFQ13168
Annex 1-C Drawings RFQ13168
Legend No
N
Textile Fabrik Com 1 Faqir Abad
drain canal Bereshna road and canal
Playing Ground 2 Bereshna road and canal
Residential Houses 3 Detail (03)
Streets 4
Designed Drains 5
Culvert
Culvert
Culverts
Detail (B)
Culvert
Culverts
Culvert
Culverts
Culvert
Culverts
Culvert
Culvert
Detail (01)
N
Detail (A)
Culvert
Faqir Abad
Ferdawsi drain canal drain canal
Bereshna road
N
02 Culvert Section
C
60
15
70
01
C
10
02
70
C
10
Culvert Plan 15 45 60 60 60 60 60 60 60 60 45 15
511
60
Channel Rebaring Culvert Slab Rebaring 70
80
7
15
10
70
84
60
90
78 60 8 90 8
01 Culvert Section R C C 15 cm
C
Base cours10cm with 98%compacting
03
R
Detail (F)
02
01
R
10
50
10
Slope
550
700
100
10
1000 55250
50
400
10
Detail (G)
SAW CUT
CONTRACTION
JOINTS @
AFTER
TRAFFIC LINE
EVERY 3M
TRANSVERSE TRANSVERSE
ISOLATION JOINT ISOLATION JOINT
WITH DOWEL WITH DOWEL
LONGITUDINAL BARS @ AFTER
BARS @ AFTER JOINT WITH
EVERY 30M EVERY 30M
TIE BARS TRAFFIC LINE
30
50
06
C
8
05
58
C
10
45
60 60 60 60 60 60 60 45
540 15
15
Culvert Plan
7
7
10 10 15
7
35
55
38
7
58
58
58
66
15 50 10
60 66 06
C
Channel Section
R C C 10 cm
Channel Rebaring Culvert Slab Rebaring Canal Rebaring Base cours10cm with
98%compacting
05 Culvert Section
C
30
50
06
C
8
05
58
C
10
45
60 60 60 60 60 60 60 45
540 15
15
Culvert Plan
7
7
10 10 15
7
35
55
38
7
58
58
58
66
15 50 10
60 66 06
C
Channel Section
R C C 10 cm
Channel Rebaring Culvert Slab Rebaring Canal Rebaring Base cours10cm with
98%compacting
L= 10M
EXISTING HOUSE WALL EXISTING HOUSE WALL
C
BROOMED SURFACE
95
70
55
15
10
15 520 15 95 15 150
550 95 165
P C C 15 cm
Base course 15cm with 98%compacting
Existing sub grade to be scarified at 20cm, reshaped and
01 Street Section compacted 93% of MDD before placing the top layer
R
Detail (G)
Detail (F)
12
15
50
100
15
12
L= 552.5M
EXISTING HOUSE WALL EXISTING HOUSE WALL
RCC 10 cm
Base course10cm with 95%compacting
50
BROOMED SURFACE CL BROOMED SURFACE
35
10
P C C 15 cm
02 Street Section Base course 15cm with 98%compacting
Existing sub grade to be scarified at 20cm, reshaped and
R compacted 93% of MDD before placing the top layer
L= 4M
EXISTING HOUSE WALL EXISTING HOUSE WALL
RCC 10 cm
Base course 10cm with 95%compacting
50
35
10
275
300
275
09
C
8
08
58
C
8
15 45 15
60 60 60 60 60 60 60 45
540
Culvert Plan 58
Channel Rebaring Culvert Slab Rebaring
30
10 12 12
7
38
7
58
58
58
8 50 8
60 12 12
66
RCC 12 cm
09 Culvert Section
Base cours10cm with
C 98%compacting
Detile (A)
Detile (B)
Slope= 1.966%
03
C
48000
80
15
15
0
10
15
10
15 60 15
90
8
190
60
106
R C C 15 cm
Base cours10cm with 98%compacting
10
15
15
03 Channel Section
C
Detail (A) Detail (B)
1811 1811
1810 1810
1809 1809
1808 1808
%
1.966
1807 1807
1806 1806
1805 1805
1804 1804
1803 1803
1802 1802
1801 1801
1800 1800
1799 1799
1798 1798
1797 1797
1796 1796
1795 1795
STATION 0+00 0+060 0+120 0+180 0+240 0+300 0+360 0+420 0+480
EXISTING
ELEVATION 1800 1802.018 1803.307 1804.473 1805.31 1806.194 1807.229 1808.796 1809.436
DESIGN
1800 1801.18 1802.359 1803.539 1804.718 1805.898 1807.077 1808.257 1809.436
ELEVATION
CUT & FILE 0.000 -0.839 -0.948 0.935 -0.592 -0.297 -0.152 0.540 0.000
Number of
1st-month 2nd-month 3th-month 4th-month 5th-month
Quantity
worker
Norm
Unit
Day
Descrition
No
20
25
30
20
25
30
20
25
30
20
25
30
10
15
10
15
10
15
10
15
20
25
30
10
15
5
5
Mobilization 5 6x5
1 1 LS 6
5 25x10
Base Curse layer 641.69 0.4 25 10
5x5
10 Demobilization Ls 3,397.4 5 5
N=30+1,340+2,200+875+250+1,520+80+80+40+25
N= 6,440 M P= 14(10D)
n= 140 D 6,440 M = 46 M/D 46*14=644M
140 D
11800
07
C
46750
Channel Plan
Detile (D)
10
00
0
Detail (D)
50
62
10 12
12 12
50
8 50 8
12 92 12
07 Channel Section R C C 12 cm
Base cours10cm with
C 98%compacting