Site Plan with culvert points

Legend No

N
Textile Fabrik Com 1 Faqir Abad
drain canal Bereshna road and canal
Playing Ground 2 Bereshna road and canal
Residential Houses 3 Detail (03)

Streets 4
Designed Drains 5

Ferdawsi drain canal

Culvert

Culvert

Culverts

Detail (B)

Culvert

Culverts

Detail (D) Detail (02)


Culvert
N

Culvert
Culverts
Culvert

Culverts
Culvert
Culvert
Detail (01)

N
Detail (A)
Culvert
Faqir Abad
Ferdawsi drain canal drain canal

Bereshna road
N
02 Culvert Section
C
60
15
70

01
C
10

02
70

C
10

Culvert Plan 15 45 60 60 60 60 60 60 60 60 45 15
511

60
Channel Rebaring Culvert Slab Rebaring 70

80
7

15
10
70
84

60
90
78 60 8 90 8
01 Culvert Section R C C 15 cm
C
Base cours10cm with 98%compacting
03
R
Detail (F)

02
01
R

10
50
10

Slope
550

700
100
10

1000 55250

50
400

10
Detail (G)

Street Plan VIEW


3000

300 300 300 300

SAW CUT
CONTRACTION
JOINTS @
AFTER
TRAFFIC LINE
EVERY 3M

TRANSVERSE TRANSVERSE
ISOLATION JOINT ISOLATION JOINT
WITH DOWEL WITH DOWEL
LONGITUDINAL BARS @ AFTER
BARS @ AFTER JOINT WITH
EVERY 30M EVERY 30M
TIE BARS TRAFFIC LINE

Street Joint Plan


05 Culvert Section
C

30
50

06
C
8

05
58

C
10

45
60 60 60 60 60 60 60 45
540 15
15

Culvert Plan
7
7

10 10 15
7

35
55
38

7
58

58

58

66
15 50 10
60 66 06
C
Channel Section
R C C 10 cm
Channel Rebaring Culvert Slab Rebaring Canal Rebaring Base cours10cm with
98%compacting
05 Culvert Section
C

30
50

06
C
8

05
58

C
10

45
60 60 60 60 60 60 60 45
540 15
15

Culvert Plan
7
7

10 10 15
7

35
55
38

7
58

58

58

66
15 50 10
60 66 06
C
Channel Section
R C C 10 cm
Channel Rebaring Culvert Slab Rebaring Canal Rebaring Base cours10cm with
98%compacting
L= 10M
EXISTING HOUSE WALL EXISTING HOUSE WALL

C
BROOMED SURFACE
95

70
55

15

10
15 520 15 95 15 150

550 95 165

P C C 15 cm
Base course 15cm with 98%compacting
Existing sub grade to be scarified at 20cm, reshaped and
01 Street Section compacted 93% of MDD before placing the top layer
R

Detail (G)
Detail (F)

12
15

50
100

15
12
L= 552.5M
EXISTING HOUSE WALL EXISTING HOUSE WALL

RCC 10 cm
Base course10cm with 95%compacting

50
BROOMED SURFACE CL BROOMED SURFACE

35
10

160 50 550 50 160


10

150 50 15 520 15 50 150


10 10

P C C 15 cm
02 Street Section Base course 15cm with 98%compacting
Existing sub grade to be scarified at 20cm, reshaped and
R compacted 93% of MDD before placing the top layer

L= 4M
EXISTING HOUSE WALL EXISTING HOUSE WALL

RCC 10 cm
Base course 10cm with 95%compacting

BROOMED SURFACE CL BROOMED SURFACE


50

50
35
10

160 50 600 50 160


15

150 50 15 570 15 50 150


10
10
P C C 15 cm
Base course 15cm with 98%compacting
Existing sub grade to be scarified at 20cm, reshaped and
03 Street Section compacted 93% of MDD before placing the top layer
R
Transverse Isolation Joint
Detail A
Contraction Joint Dept(3)cm

275

300
275

Pvc Poipe 1inch L=30cm 16@25cm c/c L=50cm


08 Culvert Section
C
30
50

09
C
8

08
58

C
8

15 45 15
60 60 60 60 60 60 60 45
540

Culvert Plan 58
Channel Rebaring Culvert Slab Rebaring

30
10 12 12
7

38
7

58
58

58

8 50 8
60 12 12
66
RCC 12 cm
09 Culvert Section
Base cours10cm with
C 98%compacting
Detile (A)

Detile (B)
Slope= 1.966%

03
C
48000

80

15
15

0
10
15
10

15 60 15
90
8
190

60
106

R C C 15 cm
Base cours10cm with 98%compacting
10
15

15
03 Channel Section
C
Detail (A) Detail (B)
1811 1811
1810 1810
1809 1809
1808 1808

%
1.966
1807 1807
1806 1806
1805 1805
1804 1804
1803 1803
1802 1802
1801 1801
1800 1800
1799 1799
1798 1798
1797 1797
1796 1796
1795 1795

STATION 0+00 0+060 0+120 0+180 0+240 0+300 0+360 0+420 0+480

EXISTING
ELEVATION 1800 1802.018 1803.307 1804.473 1805.31 1806.194 1807.229 1808.796 1809.436
DESIGN
1800 1801.18 1802.359 1803.539 1804.718 1805.898 1807.077 1808.257 1809.436
ELEVATION

CUT & FILE 0.000 -0.839 -0.948 0.935 -0.592 -0.297 -0.152 0.540 0.000

LONG PROFILE SECTION


Schedule for Canal lining and Berishna Concrete road of 5th District

Number of
1st-month 2nd-month 3th-month 4th-month 5th-month

Quantity

worker
Norm
Unit

Day
Descrition
No

20
25
30

20
25
30

20
25
30

20
25
30
10
15

10
15

10
15

10
15
20
25
30
10
15

5
5
Mobilization 5 6x5
1 1 LS 6

2 Excavation and cutting of side 1590.25 0.9 35 40 35x40


drains
Rcc (M200), including all needs & 538.75 3.6 /0.5 50x44
3 50 44
curing according to specification

4 Sub grade and leveling 2949.3 0.3 35 25 35x25

5 25x10
Base Curse layer 641.69 0.4 25 10

6 PCC Concrete Road with curing 467.66 3.25/0.5 38 38x40


40

Transverse Isolation Joint with 2 40


2x40
7 Kg 268.77
PVC pipe
Contraction Joint 2 40 2x40
8 Kg 502.62

Road way concrete cutting m 735 40 1x40


9 1

5x5
10 Demobilization Ls 3,397.4 5 5

N=30+1,340+2,200+875+250+1,520+80+80+40+25
N= 6,440 M P= 14(10D)
n= 140 D 6,440 M = 46 M/D 46*14=644M
140 D
11800

07
C
46750

Channel Plan
Detile (D)
10
00
0

Detail (D)
50

62
10 12

12 12
50
8 50 8
12 92 12

07 Channel Section R C C 12 cm
Base cours10cm with
C 98%compacting