The document lists 51 maintenance tasks carried out between January 2018 and March 2019 on generators, transformers, switch gears, and other electrical equipment of a power station. Key maintenance works included corrective maintenance on generators and their components like lube oil separators, installation of new automatic voltage regulators, replacement of transformers, maintenance of switchgears, and restoration of power supply to administrative buildings. Regular testing of insulation and commissioning of new equipment was also conducted to ensure effective operations.
The document lists 51 maintenance tasks carried out between January 2018 and March 2019 on generators, transformers, switch gears, and other electrical equipment of a power station. Key maintenance works included corrective maintenance on generators and their components like lube oil separators, installation of new automatic voltage regulators, replacement of transformers, maintenance of switchgears, and restoration of power supply to administrative buildings. Regular testing of insulation and commissioning of new equipment was also conducted to ensure effective operations.
The document lists 51 maintenance tasks carried out between January 2018 and March 2019 on generators, transformers, switch gears, and other electrical equipment of a power station. Key maintenance works included corrective maintenance on generators and their components like lube oil separators, installation of new automatic voltage regulators, replacement of transformers, maintenance of switchgears, and restoration of power supply to administrative buildings. Regular testing of insulation and commissioning of new equipment was also conducted to ensure effective operations.
1 Corrective Maintenance of GT1 Generator (Over 29/01/2018 -2/02/2018
Voltage) 5 Corrective maintenance on GT2 lube oil vapour 15/02/2018 separator (Replacement of Bearings) 6 Installation of new GT1 rotating rectifier diode 16/02/2018 7 Installation of battery room extraction fan motor 27/03/2018 8 Commissioning/ Installation of automatic voltage 10/04/2018 regulator on GT1 9 Corrective maintenance on lube oil cooler fan motor 17/04/2018 of GT1 (FC1) 10 Installation of Station Inverter 17/04/2018 11 Installation of automatic voltage regulator on GT2 19/04/2018 12 Corrective maintenance of gas heater 2A 26/04/2018-28/04/2018 13 Transformers oil testing 30/04/2018 14 Installation of surge arrestors on Lighting panels 10/05/2018-11/05/2018 15 Overhaul of outdoor lighting 14/05/2018- 25/05/2018 16 Replacement of GT1 Incomer potential transformer 7/06/2018 17 Maintenance of 33KV switch gear panels, breakers 09/06/2018 and testing 18 Replacement of GT5 Incomer potential transformer 12/06/2018 19 Installation and commissioning of a new lube oil 13/06/2018 vapour separator on GT3 20 Configuration of LN1 local network breaker 14/06/2018 21 Configuration of LN2 local network breaker 15/06/2018 22 Installation / replacement of GT3 manual module 15/06/2018 voltage regulator, AVR, digital generator protection, reverse power diode. 23 GT4 Generator Insulation resistance test 18/07/2018 24 Installation of GT3 Generator Digital generator 24/07/2018 protection relay 25 Installation of DAB electric suction pump motor for 25/07/2018 Basement 26 Installation of Exciter diode failure detector on GT3 29/07/2018 27 Corrective maintenance on turbine hall lighting panel 06/08/2018 and lighting fittings 28 Corrective Maintenance work on Ahoada LN2 Export 11/09/2018 breaker knob on the (SSP ) 29 Installation of MESD UPS 11/09/2018 30 Installation of Generator cooler fan motor 88BG3 18/09/2018 GT1 31 Installation of Generator cooler fan motor 88BG4 GT2 19/09/2018 32 Maintenance of low voltage switch board master pact 20/09/2018- 22/09/2018 breaker 33 Corrective maintenance of indoor lighting 25/09/2018 – 22/09/2018 34 Replacement of Time delay relays in MCC cubicles 27/09/2018 35 Replacement of T01, T02 silica gel 09/10/2018 36 Replacement of lube oil cooler fan Motor of GT1 23/10/2018 88FC1 37 Replacement of lube oil cooler fan Motor of GT2 24/10/2018 88FC1 38 Maintenance of Firefighting controller and battery 27/11/2018 installation 39 Maintenance of Spare lube oil cooler fan motors 5/12/2018 40 Installation of new lube oil vapour separator on GT3 18/12/2018 41 GT4 Insulation resistance test 07/01/2019 42 Installation of extraction fan motor in the battery 09/01/2019 room 43 Tracing of admin transformer cable 21/01/2019 - 28/01/2019 44 Replacement of GT1 Generator Cooler Fan Motor 4 04/02/2019 45 Replacement of Admin transformer to a spare 04/02/2019 transformer 46 Testing of T03 Export transformer 10/02/2019 - 11/02/2019 47 Corrective maintenance on TA3 Transformer 15/02/2019 48 Termination of TA transformer cable 20/02/2019 – 23/20/2019 49 Installation of AVR on GT3 20/02/2019 50 Restoration of power supply to Administrative 22/02/2019 -05/03/2019 Building (Installation of distribution board, and wiring) 51 Installation of Black-start 2 Batteries 13/03/2019
Gas-Engines and Producer-Gas Plants
A Practice Treatise Setting Forth the Principles of Gas-Engines and Producer Design, the Selection and Installation of an Engine, Conditions of Perfect Operation, Producer-Gas Engines and Their Possibilities, the Care of Gas-Engines and Producer-Gas Plants, with a Chapter on Volatile Hydrocarbon and Oil Engines