MAINTENANCE WORK (2018 – 2019)

S/N WORK DONE MONTH/YEAR

1 Corrective Maintenance of GT1 Generator (Over 29/01/2018 -2/02/2018


Voltage)
5 Corrective maintenance on GT2 lube oil vapour 15/02/2018
separator (Replacement of Bearings)
6 Installation of new GT1 rotating rectifier diode 16/02/2018
7 Installation of battery room extraction fan motor 27/03/2018
8 Commissioning/ Installation of automatic voltage 10/04/2018
regulator on GT1
9 Corrective maintenance on lube oil cooler fan motor 17/04/2018
of GT1 (FC1)
10 Installation of Station Inverter 17/04/2018
11 Installation of automatic voltage regulator on GT2 19/04/2018
12 Corrective maintenance of gas heater 2A 26/04/2018-28/04/2018
13 Transformers oil testing 30/04/2018
14 Installation of surge arrestors on Lighting panels 10/05/2018-11/05/2018
15 Overhaul of outdoor lighting 14/05/2018- 25/05/2018
16 Replacement of GT1 Incomer potential transformer 7/06/2018
17 Maintenance of 33KV switch gear panels, breakers 09/06/2018
and testing
18 Replacement of GT5 Incomer potential transformer 12/06/2018
19 Installation and commissioning of a new lube oil 13/06/2018
vapour separator on GT3
20 Configuration of LN1 local network breaker 14/06/2018
21 Configuration of LN2 local network breaker 15/06/2018
22 Installation / replacement of GT3 manual module 15/06/2018
voltage regulator, AVR, digital generator protection,
reverse power diode.
23 GT4 Generator Insulation resistance test 18/07/2018
24 Installation of GT3 Generator Digital generator 24/07/2018
protection relay
25 Installation of DAB electric suction pump motor for 25/07/2018
Basement
26 Installation of Exciter diode failure detector on GT3 29/07/2018
27 Corrective maintenance on turbine hall lighting panel 06/08/2018
and lighting fittings
28 Corrective Maintenance work on Ahoada LN2 Export 11/09/2018
breaker knob on the (SSP )
29 Installation of MESD UPS 11/09/2018
30 Installation of Generator cooler fan motor 88BG3 18/09/2018
GT1
31 Installation of Generator cooler fan motor 88BG4 GT2 19/09/2018
32 Maintenance of low voltage switch board master pact 20/09/2018- 22/09/2018
breaker
33 Corrective maintenance of indoor lighting 25/09/2018 – 22/09/2018
34 Replacement of Time delay relays in MCC cubicles 27/09/2018
35 Replacement of T01, T02 silica gel 09/10/2018
36 Replacement of lube oil cooler fan Motor of GT1 23/10/2018
88FC1
37 Replacement of lube oil cooler fan Motor of GT2 24/10/2018
88FC1
38 Maintenance of Firefighting controller and battery 27/11/2018
installation
39 Maintenance of Spare lube oil cooler fan motors 5/12/2018
40 Installation of new lube oil vapour separator on GT3 18/12/2018
41 GT4 Insulation resistance test 07/01/2019
42 Installation of extraction fan motor in the battery 09/01/2019
room
43 Tracing of admin transformer cable 21/01/2019 - 28/01/2019
44 Replacement of GT1 Generator Cooler Fan Motor 4 04/02/2019
45 Replacement of Admin transformer to a spare 04/02/2019
transformer
46 Testing of T03 Export transformer 10/02/2019 - 11/02/2019
47 Corrective maintenance on TA3 Transformer 15/02/2019
48 Termination of TA transformer cable 20/02/2019 – 23/20/2019
49 Installation of AVR on GT3 20/02/2019
50 Restoration of power supply to Administrative 22/02/2019 -05/03/2019
Building (Installation of distribution board, and
wiring)
51 Installation of Black-start 2 Batteries 13/03/2019

You might also like