FIRE HOSE REEL INSPECTION LOG

Area : DIP - PHASE II PLANT MANAGER :


Date : INSPECTED BY :

HOSE AND SERVICE COMPLETED /


S.N0 SERIAL NUM LOCATION PLACED REMARKS
NOZZLES FREE REQUIRED

1 HR21 COIL AREA LINE 4 ok March -June 2023

2 HR22 COIL AREA LINE 4 ok March -June 2023

ENGG WORK SHOP LINE


3 HR23 ok March -June 2023
4

COIL AREA NEAR


4 HR24 ok March -June 2023
ENTRANCE LINE 3

5 HR25 CABIN SECTION ok March -June 2023

6 HR26 EASY PANEL ok March -June 2023

DOORS AND WINDOWS


7 HR27 ok March -June 2023
LINE 1

DOORS AND WINDOWS


8 HR28 ok March -June 2023
LINE 1

OFFICE AREA GROUND


9 HR29 ok March -June 2023
FLOOR RIGHT SIDE

OFFICE AREA GROUND


10 HR30 ok March -June 2023
FLOOR LEFT SIDE

OFFICE AREA FIRST


11 HR31 ok March -June 2023
FLOOR RIGHT SIDE

OFFICE AREA FIRST


12 HR32 ok March -June 2023
FLOOR LEFT SIDE

SHOW ROOM AREA


13 HR33 GROUND FLOOR RIGHT ok March -June 2023
SIDE

SHOW ROOM AREA


14 HR34 GROUND FLOOR LEFT ok March -June 2023
SIDE

Checked By
Signature
Date