This document contains a list of 70 drawing requirements for various structures with their required submission dates. The majority of drawings are required to be submitted by April 15th, 2023 or April 30th, 2023. Some drawings have already been received or submitted in advance of those dates. The document tracks the status of each drawing requirement and notes if any have already been received, submitted, or are in advance of the required date.
This document contains a list of 70 drawing requirements for various structures with their required submission dates. The majority of drawings are required to be submitted by April 15th, 2023 or April 30th, 2023. Some drawings have already been received or submitted in advance of those dates. The document tracks the status of each drawing requirement and notes if any have already been received, submitted, or are in advance of the required date.
This document contains a list of 70 drawing requirements for various structures with their required submission dates. The majority of drawings are required to be submitted by April 15th, 2023 or April 30th, 2023. Some drawings have already been received or submitted in advance of those dates. The document tracks the status of each drawing requirement and notes if any have already been received, submitted, or are in advance of the required date.
S.No. Structure Name Drawing Name 1 SECOND FLOOR LEVEL SECTIONS 15th April'23 Received 2 SECOND FLOOR BEAM REINFORCEMENT DETAILS 15th April'23 Received Submitted Final Design to GMRC on 16 March'23 3 SECOND FLOOR SLAB REINFORCEMENT DETAILS 15th April'23 Received 4 THIRD FLOOR LEVEL FRAMING PLAN 30th April'2023 Advance 5 THIRD FLOOR LEVEL SECTIONS 30th April'2023 Advance by 25 March'23 6 THIRD FLOOR BEAM REINFORCEMENT DETAILS 30th April'2023 Advance 7 THIRD FLOOR SLAB REINFORCEMENT DETAILS 30th April'2023 Advance 8 TERRACE LEVEL FRAMING PLAN 30th April'2023 Advance Metro Bhawan 9 TERRACE FLOOR LEVEL SECTIONS 30th April'2023 Advance by 30 March'23 10 TERRACE FLOOR BEAM REINFORCEMENT DETAILS 30th April'2023 Advance 11 TERRACE FLOOR SLAB REINFORCEMENT DETAILS 30th April'2023 Advance 12 MUMTY LEVEL FRAMING PLAN & SECTIONS 30th April'2023 Advance 13 MUMTY BEAM REINFORCEMENT DETAILS 30th April'2023 Advance by 31 March'23 14 MUMTY SLAB REINFORCEMENT DETAILS 30th April'2023 Advance 15 RAMP & PULPIT DETAILS & SECTIONS 31st March'2023 Received Submitted GFC to GMRC on 28 Nov'22 16 SECOND FLOOR LEVEL SECTIONS 15th April'23 17 SECOND FLOOR BEAM REINFORCEMENT DETAILS 15th April'23 by 30 March'23 18 SECOND FLOOR SLAB REINFORCEMENT DETAILS 15th April'23 19 TERRACE LEVEL FRAMING PLAN 30th April'2023 20 TERRACE FLOOR LEVEL SECTIONS 30th April'2023 Work Shop cum by 31 March'23 21 TERRACE FLOOR BEAM REINFORCEMENT DETAILS 30th April'2023 Administrative 22 Building TERRACE FLOOR SLAB REINFORCEMENT DETAILS 30th April'2023 23 MUMTY LEVEL FRAMING PLAN & SECTIONS 30th April'2023 24 MUMTY BEAM REINFORCEMENT DETAILS 30th April'2023 by 12 April '23 25 MUMTY SLAB REINFORCEMENT DETAILS 30th April'2023 26 STAIRCASE PLAN & SECTIONS (SH. 01 OF 02) 31st March'2023 Received by 6 March'23 27 STAIRCASE REINFORCEMENT DETAILS 31st March'2023 Received 28 PLINTH LEVEL FRAMING PLAN & SECTION DETAILS 15th April'23 Received 29 PLATFORM LEVEL FRAMING PLAN & SECTION DETAILS 15th April'23 Received 30 Heavy Cleaning Plant & PLINTH & PLATFORM BEAM REINFORCEMENT DETAILS 15th April'23 Received Submitted GFC to GMRC Blow Down Plant on 28 Dec '22 31 PLATFORM SLAB REINFORCEMENT DETAIL 15th April'23 Received 32 GRADE SLAB REINFORCEMENT DETAILS & SECTIONS & RAM15th April'23 Received 33 PLATFORM LEVEL FRAMING PLAN (SH. 01 OF 02) 31st March'2023 34 PLATFORM LEVEL FRAMING PLAN (SH. 02 OF 02) 31st March'2023 Covered Stabling by 26 March '23 35 PLATFORM BEAM REINFORCEMENT DETAIL 31st March'2023 36 PLATFORM SLAB REINFORCEMENT DETAIL 31st March'2023 37 PLINTH BEAM REINFORCEMENT DETAILS (SH. 01 OF 02) 15th April'23 Received Submitted GFC to GMRC 38 PLINTH BEAM REINFORCEMENT DETAILS (SH. 02 OF 02) 15th April'23 Received on 21 Feb'23 39 TERRACE BEAM REINFORCEMENT DETAILS (SH. 01 OF 02) 30th April'2023 40 Traction Store TERRACE BEAM REINFORCEMENT DETAILS (SH. 02 OF 02) 30th April'2023 by 24 April'23 41 TERRACE SLAB REINFORCEMENT DETAILS 30th April'2023 42 GRADE SLAB REINFORCEMENT DETAILS & RAMP DETAILS 15th April'23 Received Submitted GFC to GMRC on 21 Feb'23 43 COLUMN LAYOUT PLAN (SH. 01 OF 02) 31st March'2023 44 COLUMN LAYOUT PLAN (SH. 02 OF 02) 31st March'2023 45 FOUNDATION LAYOUT PLAN (SH. 01 OF 02) 31st March'2023 46 Open Stabling FOUNDATION LAYOUT PLAN (SH. 02 OF 02) 31st March'2023 by 26 March '23 47 COLUMN & FOUNDATION REINFORCEMENT DETAILS 31st March'2023 48 PLATFORM LEVEL FRAMING PLAN & SECTIONS 31st March'2023 49 PLATFORM BEAM & SLAB REINFORCEMENT DETAIL 31st March'2023 50 TERRACE LEVEL FRAMING PLAN & SECTIONS 31st March'2023 51 TERRACE BEAM REINFORCEMENT DETAILS (SH. 01 OF 02) 31st March'2023 by 6 April '23 52 TERRACE BEAM REINFORCEMENT DETAILS (SH. 02 OF 02) 31st March'2023 53 Inspection Office cum MUMTY LEVEL FRAMING PLAN & SECTIONS 31st March'2023 54 Bay MUMTY BEAM & SLAB REINFORCEMENT DETAILS 31st March'2023 by 9 April '23 55 TERRACE FLOOR SLAB REINFORCEMENT DETAILS 31st March'2023 56 RAMP & PULPIT DETAILS & SECTIONS 31st March'2023 Submitted GFC to GMRC on 9 Dec '22 57 COLUMN REINFORCEMENT DETAILS 15th April'23 58 FOUNDATION REINFORCEMENT DETAILS 15th April'23 59 FOUNDATION REINFORCEMENT DETAILS 15th April'23 60 RCC WALL REINFORCEMENT DETAIL 15th April'23 61 SECTION DETAILS 15th April'23 GMRC/ITD to provide 62 Autocoach Washinng PLINTH & TERRACE LEVEL FRAMING PLAN & SECTIONS 15th April'23 Vendor Inputs on or Plant & Control Room before 25 March '23 63 PLINTH BEAM REINFORCEMENT DETAILS 15th April'23 64 TERRACE BEAM REINFORCEMENT DETAILS 30th April'23 65 PLINTH SLAB REINFORCEMENT DETAILS 15th April'23 66 TERRACE FLOOR SLAB REINFORCEMENT DETAILS 30th April'23 Autocoach Washinng GMRC/ITD to provide Plant & Control Room Vendor Inputs on or before 25 March '23 Date of Systra Dates for Drawing Requirement List Requirement submission S.No. Structure Name Drawing Name 67 MISCELLANEOUS DETAILS 15th April'23 68 TERRACE LEVEL FRAMING PLAN & SECTIONS 30th April'2023 69 MUMTY LEVEL FRAMING PLAN & SECTIONS 30th April'2023 by 20 April'23 70 SECTION DETAILS 15th April'23 71 PLINTH BEAM REINFORCEMENT DETAILS 15th April'23 Submitted FD to GMRC on 21 Dec'22 72 TERRACE BEAM REINFORCEMENT DETAILS 30th April'2023 73 P-way & Traction TERRACE SLAB REINFORCEMENT DETAILS 30th April'2023 by 20 April'23 74 MUMTY BEAM & SLAB REINFORCEMENT DETAILS 30th April'2023 75 TERRACE SLAB REINFORCEMENT DETAILS 30th April'2023 76 GRADE SLAB REINFORCEMENT DETAILS 15th April'23 Submitted FD to GMRC 77 RAMP & STEPS DETAILS & SECTIONS 15th April'23 on 21 Dec'22 78 STAIRCASE PLAN & SECTIONS 15th April'23 by 15 April'23 79 STAIRCASE REINFORCEMENT DETAILS 15th April'23 80 FOUND. & COL. REINFORCEMENT DETAILS 30th April'2023 Submitted GFC to GMRC RRV Parking on 20 Feb'23 81 FOUND. & COL. LAYOUT AND PLINTH & ROOF GA PLAN 30th April'2023 82 SECTION DETAILS 30th April'2023 83 FOUND. & COL. REINFORCEMENT DETAILS 30th April'2023 84 Cleaners Room PLINTH & ROOF BEAM AND REINF. DETAILS 30th April'2023 by 19 April'23 85 GRADE & ROOF SLAB REINF. DETAILS 30th April'2023 86 PIT PLAN & SECTIONS & DETAILS 30th April'2023 87 PIT SECTIONS REINF. DETAILS 30th April'2023 88 ROOF SLAB & SECTIONS REINF. DETAILS 31st March'2023 Received 89 ASS/TSS PULPIT ,RAMP & STEPS GA & REINF. DETAILS 31st March'2023 Received Submitted FD to GMRC on 14 March'23 90 CANOPY & PENTHOUSE DETAILS, SECTIONS & REINFORCEM31st March'2023 Received 91 EXTERNAL MANHOLE RCC DETAILS (VEHICULAR LOAD) 31st March'2023 92 EXTERNAL MANHOLE RCC DETAILS (NON-VEHICULAR LOAD)31st March'2023 93 EXTERNAL CABLE TRENCH & PRECAST COVER RCC DETAILS 31st March'2023 94 EXTERNAL SEWERAGE/EFFLUENT MANHOLE RCC DETAILS 31st March'2023 95 STORM WATER DRAIN RCC DETAILS 31st March'2023 96 STORM WATER DRAIN RCC DETAILS (FOR VEHICULAR LOAD)31st March'2023 97 STORM WATER MANHOLE RCC DETAILS 31st March'2023 98 STORM WATER DESILTING CHAMBER & CATCH BASIN RCC D31st March'2023 99 HARVESTING PIT RCC DETAILS 31st March'2023 External Work by 31 March'23 100 GULLY & GREASE TRAP RCC DETAILS 31st March'2023 101 TYPICAL MULLION & LINTEL BEAM RCC DETAILS (SH. 01 OF 031st March'2023 received 102 TYPICAL MULLION & LINTEL BEAM RCC DETAILS (SH. 01 OF 031st March'2023 received 103 GATE COLUMN, FOOTING GA & REINF.DETAILS 31st March'2023 104 CULVERT DETAILS 1 31st March'2023 105 CULVERT DETAILS 2 31st March'2023 106 ADDITIONAL DETAIL 1 31st March'2023 107 ADDITIONAL DETAIL 2 31st March'2023 108 ADDITIONAL DETAIL 3 31st March'2023 109 ETP/STP FOUNDATION DETAIL IMMEDIATE received BY 28 March'2023 110 DEPOT RAMP RP-11 FOUNDATION DETAIL IMMEDIATE BY 30 March'2023 111 RP-12 FOUNDATION DETAIL IMMEDIATE BY 30 March'2023
Note: Total No. of Drawing = 111 no's
Balance Drawing to be issued = 81 no's Drawing to be issued by 31.03.2023 = 31 no's Drawing to be issued by 15.04.2023 = 15 no's Drawing to be issued by 30.04.2023 = 32 no's Drawing to be issued immediately = 03 no's