Construction of 6 lane Vijayawada Bypass from Chinna Autupalli (Design Ch.
0+000) to Gollapudi (Design Ch. 30+000) in Vijayawada - Gundugolanu Section of NH 16 in the state of Andhra Pradesh on Hybrid Annuity Mode (Package - 3)
CLIENT : National Highway Authority Of India
INDEPENDENT ENGINEER : Lion Engineering Consultant CONCESSIONAIRE : MEIL Vijayawada Bypass Roadways Pvt Ltd CONTRACTOR : Megha Engineering & Infrastructure Ltd DAILY PROGRAMME FOR LABORATORY Date:- 20.05.2023 Description in Details From To Side Remarks 07 DAYS CUBE TESTING Grade 1 drain slab M-30 15+220 15+230 RHS 2 cc lined drain M-10 19+350 19+400 LHS 3 vup under drain wall M-30 4+400 4 boundary wall pole erection M-20 27+900 27+800 RHS 5 mnb hand rail beams M-30 12+587 5+121 LHS 6 re wall coping beam M-25 26+590 26+690 mcw 7 kerb laying M-20 k 1+800 1+750 8 toe wall pcc M-15 3+220 3+190 LHS 9 boundary wall pole erection M-20 27+700 27+800 LHS 10 vup under drain pcc M-15 5+121 11 MJB gap slab beam 2nd lift A1 RHS M-30 23+470 RHS 28 DAYS CUBE TESTING 15 toe wall raft M-30 22+850 22+860 LHS 16 toe wall 2nd lift M-30 22+820 22+830 LHS 17 LVUP A1 GAP slab M-30 21+464 LHS 18 kerb laying M-20 k 8+500 8+550 RHS 19 RCC drain slab M-30 29+006 29+160 LHS 20 cc lined drain M-10 22+230 22+300 RHS 21 re wall coping beam M-25 26+390 26+414 LHS 22 vup a2 drain wall M-30 16+626 RHS 23 friction slab stritch concrete M-40 0+720 0+820 LHS 24 VUP A1 gap slab beam 1st lift M-30 16+626 25 VG-40 bitumen Testing 26 KTP B/A soil sample CBR casting pits - 41,43,45,47,49
27 moisture correction and individual gradation for concrete works