You are on page 1of 2

Earthquake load calculation, BNBC 1993

Project:

Zone co-efficient, Z= 0.15 (for zone 2)


Structural importance, I= 1.00 (standard occupancy)
Response Modification co-efficient, R= 12.00 (SMRF for zone 2)
Site co-efficient, S= 2.00 (Type 4 soil as suggested in note 1)

C t = 0.083
h n = 104.96 (ft)
= 32.00 (m)

Natural period, T=C t (h n ) 3/4 = 1.117 (sec)

C=1.25 S/T 2/3 = 2.32

Total weight of building , W = 7.200E+04 (lb)


Water tank= 0 (lb)
Number of floors = 8

Base shear, V = (ZIC/R)W 2090 (lb)

T>.7, Therefore Ft required


F t = 0.07VT= 163 (lb)
V-F t = 1927 (lb)
(V − Ft ) wi hi
Fi =
∑ wi hi
Floor height
Weight of floor, above base, Force per
wi hi floor,
Floor (kN) (m) wihi F i , (kN)
1 9000 4 <-- OK 36000 54
2 9000 8 <-- OK 72000 107
3 9000 12 <-- OK 108000 161
4 9000 16 <-- OK 144000 214
5 9000 20 <-- OK 180000 268
6 9000 24 <-- OK 216000 321
7 9000 28 <-- OK 252000 375
8 9000 32 <-- OK 288000 428
9 --- 36 --- --- ---
10 --- 40 --- --- ---
11 --- 44 --- --- ---
12 --- 48 --- --- ---
13 --- 52 --- --- ---
14 --- 56 --- --- ---
15 --- 60 --- --- ---
16 --- 64 --- --- ---
17 --- 68 --- --- ---
18 --- --- --- ---
19 --- --- --- ---
20 --- --- --- ---
21 --- --- --- ---
22 --- --- --- ---
23 --- --- --- ---
24 --- --- --- ---
Roof 0 900 <-- OK 0 163
Total= 72000 1296000 2090
Wind load Calculation, BNBC 1993
Project: A

h= 48.78 m X 60.976 m

30.488 m
Plan
Elevation

Exposure Condition = A
Basic wind speed, V b = 210 km/h Wind direction-X Wind direction - Y
Velocity to pressure co-efficient C c = 4.72E-05
Structural importance co-efficient C i = 1.0 B= 60.976 m B= 30.488 m
Sustained wind pressure q z =C c C i C z V b 2 = 2.082 C z L= 30.488 m L= 60.976 m
Gust co-efficient C g = 1.242 h= 48.78 m h= 48.78 m
Pressure, p z-x = C g C p-x q z = 3.748 C z
Pressure, p z-y = C g C p-y q z = 2.973 C z L/B= 0.500 L/B= 2.000
h/B= 0.800 h/B= 1.600
C z = Combined height and exposure co-efficient
Cp= 1.450 Cp= 1.150

Wind pressure calculation X-dir Y-dir


Height (m) p z-x p z-x Area Floor level p z-y p z-y Area Floor level
CZ
Floor from GL N/mm2 lb/ft2 m2 force (kip) N/mm2 lb/ft2 m2 force (kip)

1 3.000 <-- OK 0.3680 0.001379 28.8 182.9 56.7 0.001094 22.83 91.5 22.5
2 6.000 <-- OK 0.4159 0.001559 32.5 182.9 64.1 0.001236 25.81 91.5 25.4
3 9.000 <-- OK 0.4979 0.001866 39.0 182.9 76.7 0.001480 30.89 91.5 30.4
4 12.000 <-- OK 0.5656 0.002120 44.3 182.9 87.2 0.001682 35.10 91.5 34.6
5 15.000 <-- OK 0.6245 0.002341 48.9 182.9 96.3 0.001856 38.75 91.5 38.2
6 18.000 <-- OK 0.6771 0.002538 53.0 182.9 104.4 0.002013 42.01 91.5 41.4
7 21.000 <-- OK 0.7250 0.002717 56.7 182.9 111.8 0.002155 44.98 91.5 44.3
8 24.000 <-- OK 0.7692 0.002883 60.2 182.9 118.6 0.002287 47.73 91.5 47.0
9 27.000 <-- OK 0.8105 0.003038 63.4 182.9 124.9 0.002409 50.29 91.5 49.5
10 30.000 <-- OK 0.8492 0.003183 66.4 182.9 130.9 0.002525 52.69 91.5 51.9
11 33.000 <-- OK 0.8859 0.003321 69.3 182.9 136.6 0.002634 54.97 91.5 54.2
12 36.000 <-- OK 0.9208 0.003451 72.0 182.9 141.9 0.002737 57.13 91.5 56.3
13 39.000 <-- OK 0.9540 0.003576 74.6 182.9 147.1 0.002836 59.20 91.5 58.3
14 42.000 <-- OK 0.9859 0.003695 77.1 182.9 152.0 0.002931 61.17 91.5 60.3
15 45.000 <-- OK 1.0165 0.003810 79.5 182.9 156.7 0.003022 63.07 91.5 62.1
16 --- --- --- --- --- --- --- --- --- ---
17 --- --- --- --- --- --- --- --- --- ---
18 --- --- --- --- --- --- --- --- --- ---
19 --- --- --- --- --- --- --- --- --- ---
20 --- --- --- --- --- --- --- --- --- ---
21 --- --- --- --- --- --- --- --- --- ---
22 --- --- --- --- --- --- --- --- --- ---
23 --- --- --- --- --- --- --- --- --- ---
24 --- --- --- --- --- --- --- --- --- ---
ROOF 48.780 <-- OK 1.0536 0.003949 82.4 115.3 102.3 0.003132 65.37 57.6 40.6
Total force along X direction 1808 kip Total force alongY direction 717 kip