FCCL N L-3

Sr# Problem description Area Remarks


Belt check-weigher load cells at 212BC1,is still not
1 installed. Main Crusher

Protection covers must have to be installed on


3
all instruments and Control box in open i.e; Main Crusher and Raw Mill
Bagfilters ,Belt check-weighers controllers,
Silos levels, Actautors etc.

Metal detector at coal mill area has been


4
damaged that needs to be replaced/repaired Coal Mill
and installed on urgent basis before kiln light-
up for proper and safe operation of coal mill.

5 Raw Mill Bag House Inlet, Outlet and Delta Raw Mill
pressure transmitters need to be re-calibrated.

6
Requried Plate form at Raw mill Hot Gas Raw Mill
Damper

7
Speed Sensors of all belts converes are not Raw Mill
active in CCR

Protection covers / shades must have to be


installed on all instruments and Control box in
8 open i.e; Kil tyre Temperatures, Bagfilters ,Belt Kiln and Coal
check-weighers controllers, Silos levels,
Actautors etc.

9 Leval Transmiter of Furnace oil is not installed Kiln Furnace

10 Leval Transmiter of Water tank is not properly


hanged

11 Raw Mill main feed belt Metal Detector is repaird.

Coal Mill main feed belt Metal Detector is repaird


12 and not active yet.