Manual Modeling, Optimization and Design Op Pit A - FIM

Universidad Nacional del Altiplano


FACULTY OF ENGINEERING MINES

"MANUAL MODELING, OPTIMIZATION AND


DESIGN IN OPEN PIT WITH MINESIGHT" v1.0

Produced by: Roni Alexander Cotrado Cahui

E-mail: roni_play@hotmail.com

October 2010

Note - The name and the program described MineSight® are owned by Mintec Inc - Tucson, Arizona.

one
Manual Modeling, Optimization and Design Op Pit A - FIM

one

Identification and MODELING FLOW CHART


creation of PCF- GEOLOGICAL
Data File 10

3 4

Data Fusion initialization Review and carguío

File 11 of Data
two
Procedure: (dat201.ia)
(Assays)
CONCSA
Procedure: Process:
P10211.DAT P20101.DAT

7 6

Calculation of composite Initialization File 8 and 9


materials (Bench (Composites)
Deployment holes MS3D
compositing)
5

Process: Process:
P50101.DAT P10209.DAT

9 10

Creating solid with initialization


interpretation of
the "Linker Tool" File 15 (block
geology by
8 from sections model) Procedure:
sections

P60101.DAT

12

User calculations
(equivalent law, Coding regions from
Grade estimation by IDW
confidence level, etc.)
and Kriging eleven
13 Procedure: geological solids
Ordinary

P61201.DAT MS3D

fifteen

Initialization File 25 Initializing File 13,


(VBM) Exporting Item transfer to
14
deployment 16
contours TOPOG
model

MOLE

two
Manual Modeling, Optimization and Design Op Pit A - FIM

17

FLOW CHART OF OPTIMIZATION BY METHOD WITH


Initialization of the MSEP LERCH GROSSMAN AND
new file 13 PIT DESIGN FINAL OPERATIVE
(GSF)

18 19

Data entry Display surface pit


(Costs, Operating Pit
recovery rates, etc.) Minesight design with Pit
to optimal in 3D Expansion
MSOPIT Tool

twenty-one

Calculation of
Intersecting with the
FINISH reserves topography twenty
pitres Final pit

3
Manual Modeling, Optimization and Design Op Pit A - FIM

one Data identification and creation of the PCF - File 10

In this step we must define the location of OU or project, copy the Data (necklace, survey,
assay, etc.). Prior to entering the program must identify the keys to our project
such as: geometric boundaries in 3 dimensions, ranges of assaying, types
rock, etc.

1. On the local drive D: create a folder called and it gives a database copy that
on the CD.

2. Enter the ms compass to create the PCF (archi vo control project) and locate the folder
A, OK, OK.

3. We the MS-compass window, click appears in File / New / PCF, OK and fill as follows:

4
Manual Modeling, Optimization and Design Op Pit A - FIM

panel 1

panel 2

GO, see the report then close it.

5
Manual Modeling, Optimization and Design Op Pit A - FIM

4. Go to File / New / Project and select the file una10.dat (PCF)

5. Close the MS-compass, open the ms3d, select r the folder, click Yes.

In the configuration window seleccio project Initialize nar from an existing PCF, click
una10.dat and automatically fills coordena you give. okay

6
Manual Modeling, Optimization and Design Op Pit A - FIM

the program window appears for the first time, Here I changed the background color
white.

two Data Fusion

What follows is merging the data with the called procedure CONCSA
(Convert collar survey, assays). this procedimient or generate an ASCII file named
DAT201.IA which contain all the information Bores. This file can be read and
charged to MineSight for subsequent deployment and 3D n.

Data of the proj to .

Necklaces file (Collars.csv) .- indicates the ID's , the coordinates of the points
drilling, maximum depth and other information Bores.

7
Manual Modeling, Optimization and Design Op Pit A - FIM

Deviations file (Surveys.csv) .- Shows direction and dip of bores


different intervals.

Assays file (Assays.csv) .- It shows the value It is assaying laws and density
different intervals. In this case we have gold and co bre with density information.

Lithology file (Lithology.csv) .- Contains information on rock types with their


respective codes along the holes.

8
Manual Modeling, Optimization and Design Op Pit A - FIM

Alteration file (Alter.csv) .- indicates the Morse Code or alteration recorded in the holes.

PROCESS CONCSA

1. Enter the compass.

Select follows the group and operates tion to quickly find the
CONCSA.

Or we can find it by putting in All and All respectively and seek


procedure by putting his name, then click either rch and you highlight the desired program.

9
Manual Modeling, Optimization and Design Op Pit A - FIM

2. Fill as follows

panel 1

To not go wrong with the file name in the manually select first box
with.

10
Manual Modeling, Optimization and Design Op Pit A - FIM

panel 2

panel 3

eleven
Manual Modeling, Optimization and Design Op Pit A - FIM

panel 4

Panel 5 (in this case we have 2 files Earth Science to)

12
Manual Modeling, Optimization and Design Op Pit A - FIM

Panel 6 (geology file 1)

Panel 7 (geology file 2)

GO

13
Manual Modeling, Optimization and Design Op Pit A - FIM

Report operations conducted by the procedimi ent

Reviewing the DAT201.IA

Open with notepad, merged file

14
Manual Modeling, Optimization and Design Op Pit A - FIM

3 Initialization File 11 (Assays)

we then create the file 11 in which It is stored the information created in the
previous step (DAT201.IA).

1. Put group and operation as follows and choose Initialize Assay File.

panel 1

REF # indicates the maximum number of holes that conten Dravida file in the project are
26, so it will fit into the file because it puts mos a range of 0 to 300.
FROM is the beginning of the section or range Essayist and

TO is the end of the section or range


-AI- interval is less FROM TO bone assay We range of 0 to 500
since the length maxi ma of holes is 333.2
Precision put in 0.1 to one decimal

fifteen
Manual Modeling, Optimization and Design Op Pit A - FIM

panel 2
Enter items that contain, for values maximum precision and view data with Excel.
Lith put 0, 0 and -1 because it is an item of face cteres alphanumeric.

The following panels left blank or go direct Aug"

4 Review and loading of Data (dat201.ia)

The following is dat201.ia to load the file 11 c on the procedure called " Load Ascii
Dh Data ". It will run twice, first check e have that there are no errors and
when we are sure we run a second time p ara transfer it to file 11

1. To find the procedure put in grup oy operation follows

16
Manual Modeling, Optimization and Design Op Pit A - FIM

panel 1
Use the file chooser to select the file gives t201.ia with the browser.

Panel 2, note that this activating " Check Data Only single "For verification.

17
Manual Modeling, Optimization and Design Op Pit A - FIM

Panel 3, enter the labels of the items in the same order they appear in the dat201.ia with
except REF #

Go to "GO"

We Mxpert window appears which no TO FIND ró errors or warnings

18
Manual Modeling, Optimization and Design Op Pit A - FIM

We run again, but unchecking the "Check Data Only (Do not Store) "to make
upload the data to the file 11

5 Initialization File 8 and 9 (Composites)

Now create the file composites in which It will indicate the length of compositing
in this case 10 meters (bench height) for post eriormente using a procedure that will read the
file 11 and make calculations.

1. Open the procedure putting group and oper ation as follows:

19
Manual Modeling, Optimization and Design Op Pit A - FIM

panel 1

panel 2

GO

twenty
Manual Modeling, Optimization and Design Op Pit A - FIM

6 Calculating composites (Bench Compositing)

1. Open the calculation method of composite materials called "Bench Compositing" put
group and operation as follows:

Panel 1, leave blank

panel 2

Panel 3, 4 and 5 left blank, GO

twenty-one
Manual Modeling, Optimization and Design Op Pit A - FIM

Check the report file with the new inte rvalos regularized to 10 meters.

7 Deployment holes MS3D

And then that information was calculated position and l I composites by processes
ms-compass, we will continue to deploy Informat 3D ion so that we
a clear view of the holes in space and as I compare with legends, histograms and
labels values ​and composites and assaying n sections.

1. Close the compass in the Data Manager to create a Assays new folder named.

22
Manual Modeling, Optimization and Design Op Pit A - FIM

2. Highlight the folder assays and right click , to choose New / DH View / Minesight put
the name "AU"

Select the PCF UNA10.DAT and highlight UNA11.DAT Y UNA12.DAT OK

No to not limit the items available

2. 3
Manual Modeling, Optimization and Design Op Pit A - FIM

It appears the properties window view talad ro, click "All" and "Load Selection"

And the holes appear

24
Manual Modeling, Optimization and Design Op Pit A - FIM

3. In the same window click on "Cutoffs" for so GnarLE a range of colors AU item, then
click "Intervals", fill as in Figure

It gets from 0 to 3 with 0.1 increments what sign ifica there will be 30 intervals

4. Right click on the intervals and select "S All elect "

25
Manual Modeling, Optimization and Design Op Pit A - FIM

5. Once selected click "Properties" Lueg or click "Set Color by Range" set color
rank. OKAY.

Close the object properties.

26
Manual Modeling, Optimization and Design Op Pit A - FIM

6. Close the window Cutoffs, go to the tab " Survey ", set up as follows for
show me the ID's of the holes in 3D

7. Go to the "Intervals" tab, click the plus sign + to add labels Gold Rehearse in
coloring method fix cutoff. Apply

27
Manual Modeling, Optimization and Design Op Pit A - FIM

BUILDING PLANS (GRIDSETS) to display 2D


1. In the Data Manager to create a new folder Deno mined GRIDS
2. Highlight the created folder and right-click New / gridset put name NS (north
south). Create plans based on the PCF, fill c Omo follows then OK.

28
Manual Modeling, Optimization and Design Op Pit A - FIM

If we see in the plan view visualize the blueprints

3. In the data manager gridsets close NS, Save the Date to install these planes in the current viewer

. Set as follows:

29
Manual Modeling, Optimization and Design Op Pit A - FIM

It displays the East-5970 level

VIEWING OF LAWS histograms

1. Open the properties drill AU, go to p tinning "Strips" histograms, click ,


configured as follows

Strip width is the maximum width of the histogram and


histogram Color item item is to assign the gold colors
Histogram / Wiggle Trace Max value refers to maxi mo of the selected item.

30
Manual Modeling, Optimization and Design Op Pit A - FIM

Apply

8 Interpretation of geology by sections

one. To perform this procedure need to create r an oriented north-south gridset


with planes spaced every 25 meters, then creates RLO install the current viewer.

31
Manual Modeling, Optimization and Design Op Pit A - FIM

two. We must also set the range of vision bores 2D + -25 meters.
Enter properties and fill Drillhole yes.

3. Activate 2D mode and go to the plane This 5925


Four. Create a folder called GEOLOGIA within it create a geometry called
"NS Sections". Put it in edit mode
5. Activate the Snap Point to force scanning Contacts ore and
clearance.

6. Go to menu Polyline / 2D Create / Polygon , start scanning, click right before


close the polygon should look like.

7. Perform the same procedure for the other sect Ion: 5950, 5975, 6000, 6025,
6050, 6075, 6100 and 6125.

32
Manual Modeling, Optimization and Design Op Pit A - FIM

A very important condition for the next step It is that polygons should be
properly closed, to verify this we enter geometry and properties
Polylines tab activate the "Polygon Fill"

8. Now we must interpret the geology, this rep resented by altering codes.
To do this we will create a new view of such adro. Close AU and drill
sections. Right click on the folder Assays / New / DH View / MineSight. I call it
"ALT"

33
Manual Modeling, Optimization and Design Op Pit A - FIM

9. Load all drills and choose Item Cutoff ALT

10. Cutoffs set in legend for codes d and alteration.

eleven. In the Intervals tab, add the item ALT COLORED or cutoff, Apply.

3. 4
Manual Modeling, Optimization and Design Op Pit A - FIM

12. Now draw sections for code alteració n 1. Create a new geometry
called "NS Sections ALT"

9 Creating solid with the "Linker Tool" to part go Sections

Now we will use previously created sections to generate solids with geological
tool linker Tool . We must first verify that to Section s have been
drawn in the same direction and having a flashpoint end in common. We can also
smooth polygons using the command smooth and command densify to increase
number of points for triangulation. A Once generated to solid gold and alt-1
apply Boolean operations to differentiate accurately alteration zones
interpreted.

35
Manual Modeling, Optimization and Design Op Pit A - FIM

one. Open only "Sections NS", we will remove the atr ibuto the poligon fill. now

select the button . Also enable the Sh OW nodes Selection

two. Go to Polyline / Redefine / Direction menu. it appears window, once more


select objects. Check that all the s sections have the same
address, if it does not proceed to change the dir ection. Preview, Apply.

3. Go to Polyline / Redefine / All EndPoints menu appears shall circles at points where
You started scanning the sections, the objective is that these are aligned so that
Triangulation is good.

36
Manual Modeling, Optimization and Design Op Pit A - FIM

Four. GEOLOGY folder create a new geometry Call oresolid ado, put it in way
of edition. Go to menu Utilities / Linker Tool . Click the button Select Area polylines.
Select all sections. Apply.

37
Manual Modeling, Optimization and Design Op Pit A - FIM

5. Open the properties of oresolid, set in file Surfaces unchecking Show


Lines (display lines) and activate Show Faces ( show faces).

It notes that the solid is not closed by the coast two.

6. Close the missing polygons by clicking triangulate Polyline and selecting


only the end sections, right click pa ra finish.

We closed the Linker Tool, our solid must be A) Yes:

38
Manual Modeling, Optimization and Design Op Pit A - FIM

7. Finally, we must merge the triangulations is leccionamos with button . the


Go to

menu Surface / Merged Selected .

As our strong indicator that is correct Built mind should give us


volume information when using the Query.

8. Analogously we generate solid for alteration sections 1


(Yellow) that we will call "Solid ALT1"

9. Inside the folder create a folder den GEOLOGIA ominada "SOLIDOS


ACCURATE "within it create the geometry" ALT2 "p oniéndolo in edit mode.
10. Having opened the "oresolid" and "Solid ALT1". Go to m enu Surface / Intersect Surfaces Tool .

39
Manual Modeling, Optimization and Design Op Pit A - FIM

In primary group select the oresolid (orange ) and as a side group to solid
ALT1 (yellow) Get Results leave Merged Surf Operation aces and choose Cut
Surface diff (Cut surface difference). Previe w, Apply.

eleven. Close other solid and leave open only "ALT2 "Configure you to show me
only the faces of triangulation on their property is.

12. If we consult with the query, we see that no vol umen, indicating that there
some opening or intersection, which corrected oars using the Verify. First

Select the solid with the button Surface / Verify


. Go to menu . Select the solid.
Openings option (openings). Verify, Repair.

13. We will check the correction using the query. Must d ar volume information.
14. Now we create the geometry "ALT1" put mode d and editing. ALT1 result of
intersection of "oresolid" and "Solid ALT1". open the Intersect Surfaces Tool from the
Surface menu. Select the option "Cut (Int)". It should be as follows:

ALT1

40
Manual Modeling, Optimization and Design Op Pit A - FIM

fifteen. Likewise for opening ALT1 patching s with Verify. In the figure
below must geological solids will use then to code the
blocks per type of alteration.

41
Manual Modeling, Optimization and Design Op Pit A - FIM

10 Initialization File 15 (block model)

Blockmodel
It is a three-dimensional modeling consisting of d iscretizar virtually the site in
hundreds of parallelepipeds (blocks), with Featu sticas ranging according to system
operation to use, which can represent characteristics and reservoir properties.
Then initialize the file 15 or mode the block which will contain several
Items with information laws, rock types, porc entage topography, economic values
block, codes of confidentiality, etc. to go e have sequentially adding.

one. Compass enter the MS in All group put in Oper ation put Initialize. Then
click "Initialize Model File" or search for the p ROCEDURE p60101.dat

42
Manual Modeling, Optimization and Design Op Pit A - FIM

Panel 1, leave blank

panel 2

DESCRIPTION OF ITEMS

MOLE Block is the percentage below the topo graphy


AUIDW Golden Law, estimated by weighting method d the Inverse Distance
AUKRG Golden Law, estimated by Kriging method Ordin Aryan

CUIDW Copper grade, estimated by weighting method the Inverse Distance


CUKRG Copper grade, estimated by Kriging method Or nary
ALT Code Rock (type of alteration)
DIST Maximum distance to the nearest composite couple to interpolation.
NCOMP Number of composites used to estimate the v alor law block
CONF Code of confidentiality (measured, indicated and inferred)

ROUTE Route number


VALPT economic value per ton ($ / ton)
VALBK economic value per unit ($ / block)
PUSH Number of Pushback
PROC Process number
KVAR Percentage change kriging

43
Manual Modeling, Optimization and Design Op Pit A - FIM

Panel 3, leave blank

Panel 4 is to set values ​of some items advance, in this case only for TOPO
100% will

GO

eleven Coding regions from solid geolo gicos in MS3D

one. In the DataManager create a new folder called da "BLOCK MODEL". Click
law in this New / Model View folder to create a model view called
ALT.

two. As Primary display item will ALT, click Apply to display us the

model

44
Manual Modeling, Optimization and Design Op Pit A - FIM

3. Go to the Geometry tab, click on the red button

Four. Click to select the geometry selection sól Gone ALT1 and ALT2

Four. Five
Manual Modeling, Optimization and Design Op Pit A - FIM

5. Once selected geological solids must assign a code 1 for


ALT1 and 2 for ALT2

6. Ok, if you want you can save changes. ah we go to pray Model Code.

30% indicates the minimum percentage to be coincid go with the solid block to encode
Entire model code to encode the entire model Zone Item code to
assign an item where alm It acenará information.

7. Click on CODE, Si.

46
Manual Modeling, Optimization and Design Op Pit A - FIM

8. To visualize graphically encoded pattern d ALT, should set the


Model View. In the Display tab put in Style 3D b locks to show us in
three dimensional view of blocks. In Cutoffs fijarem I ALT item colors.

47
Manual Modeling, Optimization and Design Op Pit A - FIM

9. In the Range tab, set at all levels and dir ections

10. On the Options tab, limit the ALT item with range> = 1 and <3. Apply

48
Manual Modeling, Optimization and Design Op Pit A - FIM

12 Grade estimation by Ordinary Kriging and IDW

IDW estimate or inverse distance


This method applies a weighting factor to each It is surrounding the sample point block
mineralized. Said weighting factor is the inv erso the distance between each sample and the
center of the block, raised to a power n, their ele take values ​between 1 and 3. It is intuitive
assume that the potential influence of a sob value re a point decreases as the value departs
of that point, the attribute change as a function ng inverse distance. In other words,
is achieved give greater weight to the values ​Próxim os and minor but those furthest from the
point estimation. Only samples that come d ithin a given search area
They are weighted of said form. Gener formula the estimation is:

Where: Gi
: Known values ​of an attribute (law).
gave : Distances from the known values ​to pun to estimate.
M : Exponent distance considered.

However, this method has the following des advantage:

- It is empirical
- too geometric
- Does not consider the structure of the phenomenon minerality or (continuity and anisotropy)
- It does not provide an error rate associated with the estimate.

Defining the size of the search area


When any estimation procedure smudging ng either by IDW and Kriging, these
They demand a search area which can be a circle or ellipse if only out in search
NS and EW, should also be out by lifting We define the size of the sphere or
ellipsoid. It has the following general formula:

DMM = (St / n) 1/2


Where:
DMM : Average distance sampling
St : Total area covered by the samples
N : Number of samples

Approximate area covered by composites = 77000 m2


Number of composites = 26 DMM =
54.42

How to search for IDW method will be a CiR ass with dimension 54.42 * 2 = 108.84, the
which will assume 100 meters.
Then we enter the value Minesight 100 for NS and EW direction.

49
Manual Modeling, Optimization and Design Op Pit A - FIM

one. Enter the MS Compass, search for the IDW Inte program rpolation

panel 1

fifty
Manual Modeling, Optimization and Design Op Pit A - FIM

Panel 2, we define search distances, expo nent of inverse distance, number


maximum composite to estimate a block.

Panel 3, we enter the items for interpolation and indicate the method of calculation.

51
Manual Modeling, Optimization and Design Op Pit A - FIM

Panel 4 and 5, left blank because no considerarem ellipse as you search area

Panel 6, to limit interpolation only to b loques alteration coded 1 and 2.

Panel 7, leave blank, GO

Mxpert window will show the number of CALs made asses, as shown was calculated
bank by bank.

Press any key ...

52
Manual Modeling, Optimization and Design Op Pit A - FIM

Estimation of gold grades by method "Ordinary Kriging"


Prior to this step we need an analysis variographic of composites, which it
we do with the MS Data Analyst program.

one. MS Data Analyst Open from the menu Minesight / Data Analyst (MSDA) .

two. click on File / New / Project , select a folder and within another called
DATA ANALYST

Click Yes

Main window of MS Data Analyst

53
Manual Modeling, Optimization and Design Op Pit A - FIM

3. click on Settings / Set Import Directory to set the folder of your project A

Four. click on Data / Source to load data from our pro composites ject.
Step 1, type definition project

Step 2, defined as data type to the composite s

54
Manual Modeling, Optimization and Design Op Pit A - FIM

OK

Step 3 Select the items to be loaded

55
Manual Modeling, Optimization and Design Op Pit A - FIM

Drillholes record, selecting holes, d ecting like this (use for all).

Block Model Limits tab to limit the blocks columns, rows and levels (not applicable)

56
Manual Modeling, Optimization and Design Op Pit A - FIM

Basic Filtering to filter the data according to certain criteria.

OKAY.

OKAY.

57
Manual Modeling, Optimization and Design Op Pit A - FIM

5. In the main window MSDA, go to the menu Tools / Build Variogram to build
variograms.
On the General tab, we must indicate the type of var iograma building, the distance lag
to evaluate the samples and the item to be analyzed.

Directions the tab set the number of variogr love in different directions and
inclinations (36 variograms).

58
Manual Modeling, Optimization and Design Op Pit A - FIM

Titles and labels on the tab to put labels d and the x, y axes.

Build, Yes.

Open global variogram, Open.

59
Manual Modeling, Optimization and Design Op Pit A - FIM

You can perform a automodelamiento of variogram to the Auto-fit button.

Close the window

6. In the main window go to the menu MSDA Utilities / Open 3D Variogram Manager ...
to model the main 3D variogram to be us virá to estimate it by method
Ordinary Kriging gold grades. OK

60
Manual Modeling, Optimization and Design Op Pit A - FIM

In this window click Add to add the variograms newly created.

Select all variograms using the bot ng SHIFT, OK.

61
Manual Modeling, Optimization and Design Op Pit A - FIM

all loaded variograms have.

Now configure the parameters for how we Give our 3D variogram with
Spherical model.

62
Manual Modeling, Optimization and Design Op Pit A - FIM

Now modeled using the Auto-Fit

And it is

The blue curve represents our variog 3D branch.

63
Manual Modeling, Optimization and Design Op Pit A - FIM

Rosa diagram

click on File / Export Variogram Model , OKAY.

64
Manual Modeling, Optimization and Design Op Pit A - FIM

Appoint as VARIO-AU

Close the MSDA

We can visualize the shape and orientation of OU or 3D variogram in Minesight

Create a folder on the Data Manager named VAR IOGRAMAS


Right click on the folder Variograms / Import / Variograms (ASCII) File .
Select VARIO-AU in the Data Analyst folder.

Attribute disable variograms

65
Manual Modeling, Optimization and Design Op Pit A - FIM

This is how the main variogram, which You can compare your drills.

The VARIO-AU file must be copied to the directory ONE project for use
later.

66
Manual Modeling, Optimization and Design Op Pit A - FIM

7. Now we proceed to estimate the laws with Method Two or Ordinary Kriging. enter the
MS Compass and search for the program.

panel 1

67
Manual Modeling, Optimization and Design Op Pit A - FIM

panel 2

panel 3

68
Manual Modeling, Optimization and Design Op Pit A - FIM

Panel 4, click Edit / File Chooser , to select the file VARIO-AU

Panel 5, leave blank

Panel 6, limit the calculation only the blocks alteration code 1 and 2

69
Manual Modeling, Optimization and Design Op Pit A - FIM

Panel 7, leave blank GO

8. Similarly calculate values ​for CUKRG

70
Manual Modeling, Optimization and Design Op Pit A - FIM

13 User calculations

Let's use some items of model or to perform calculations and store them in
other items of the same model.
Confidentiality code calculation CONF
The item CONF model will be used to store r a numeric code to categorize a block
as mineral checked (CONF = 1), mineralized zones likely as (CONF = 2) and mineralized zones
possible (CONF = 3). By categorizing block block will be based on the distance to the composite
(DIST) and the value closest block ALT (Alt eration).
The criterion is as follows:
CONF DISTANCE = 1 for 0 to 50 CONF = 2 for distance between
51 and 80 CONF = 3 to 81 and distance between 200

one. In the MS Compass, locate the User's Calc (Mo program of the)

FIRST RUN Panel 1

71
Manual Modeling, Optimization and Design Op Pit A - FIM

Panel 2, items to be used

Panel 3, we define the data range of ALT and DIST

72
Manual Modeling, Optimization and Design Op Pit A - FIM

Panel 4, define the shape of calculation, CONF = 1 pair a mineral tested.

Panel 5, item to be stored in the file 15 des For the calculations.

GO

73
Manual Modeling, Optimization and Design Op Pit A - FIM

SECOND RUN, modify only the panel 3 and 4 Panel 3,

panel 4

GO

74
Manual Modeling, Optimization and Design Op Pit A - FIM

THIRD CORRIDA only modify the panel 3 and 4 Panel 3

panel 4

GO

75
Manual Modeling, Optimization and Design Op Pit A - FIM

14 Deployment Model

Once the calculations made in the model, tenien do assigned laws, etc. The next step is
graphically displaying the items by legends with different types of 2D and deployment
3D.

one. The model view "ALT" found in the folder BLOCK MODEL create a
copy and paste the same location, open their pr opiedades, reappoint as
AUIDW change the item ALT AUIDW. set l a legend.

Defined intervals according to information you have on file assays


regarding the laws of gold and copper.

76
Manual Modeling, Optimization and Design Op Pit A - FIM

Select all intervals and go to properties to fix the color range.

Apply

Proceed in the same way for AUKRG, CUIDW and C UKRG

77
Manual Modeling, Optimization and Design Op Pit A - FIM

two. Now we visualize 2D blocks labeled s of items of interest. As


requirement should be installed gridset. Open the current and check Viewer. Y

switch to 2D mode with "Change to 2D Mode" button or

3. Once installed, navigate to any plane do nde cut to model blocks,


this case is the plane of the E6025 model view AUIDW

78
Manual Modeling, Optimization and Design Op Pit A - FIM

Four. Open the properties of the current view. to conf igurar style filled polygons

5. On the Labels tab enter the following items

79
Manual Modeling, Optimization and Design Op Pit A - FIM

6. In Model Properties, Labels tab, change color, t fixing and source tags.

80
Manual Modeling, Optimization and Design Op Pit A - FIM

fifteen Initialization File 25 (VBM) Exporting the Contours

one. Open the MS Compass, locate the Initialize program to VBM File.

Panel 1, creating the VBM "UNA25.HOR"

81
Manual Modeling, Optimization and Design Op Pit A - FIM

Panel 2, type of planar orientation (horizontal)

GO
Press any key to continue ... Close the
Compass

two. In the Data Manager to create a new folder named TOPOGRAFIA, right-click the
folder, choose Import / DXF File. To select the contour file
"Contours".

82
Manual Modeling, Optimization and Design Op Pit A - FIM

3. In the GRIDS folder, create a new gridset denomin ado "Horizontal-5" that
spaced horizontal planes to represent each 5 meters, so that
match the curves.

83
Manual Modeling, Optimization and Design Op Pit A - FIM

Four. Gridsets close the screen, go to Poly menu line / Convert 3D to 2D. select
Contours all, right click, link what the gridset previously created.

Call your query on any of the curves , must show the number of plane

5. In the "Materials", right click New / M aterial, named as "901".


901 Open and configure.

84
Manual Modeling, Optimization and Design Op Pit A - FIM

6. Open the properties of "Contours" of the T Folder And relate OPOGRAFIA


Material "901".

7. Right click on the geometry "Contours" choose Export / VBM File.

85
Manual Modeling, Optimization and Design Op Pit A - FIM

Apply

16 Initializing File 13, Item TOPOG to transfer TOPO

one. Open the Compass, search for the "Initialize 2D Surface File ".

86
Manual Modeling, Optimization and Design Op Pit A - FIM

Panel 1, leave blank

Panel 2, enter elevations item TOPOG

GO

two. Open the Compass, locate the "Topo Grid program fro m VBM / DTM "for gridding
contour lines (UNA25.VBM)

87
Manual Modeling, Optimization and Design Op Pit A - FIM

panel 1

GO

Press key and

88
Manual Modeling, Optimization and Design Op Pit A - FIM

3. Displayed graphically, create the folder "gridded SURFACE ", right click
New / Model View, called TOPOG

In the Properties window click Apply, it shows a gray surface. Define your legend.

89
Manual Modeling, Optimization and Design Op Pit A - FIM

Four. In Compass, locate the "Add to Mod program Topo% the". This serves to calculate the
percentage of the blocks below the topography ed.

GO

90
Manual Modeling, Optimization and Design Op Pit A - FIM

5. To view, create a new view model l TOPO item. Right click on the
folder BLOCK MODEL New / Modelview. simply name like TOPO.

91
Manual Modeling, Optimization and Design Op Pit A - FIM

Apply.

So far we have prepared the block model to be optimized by method


Lerch-Grossman (LG).

17 Initialization of the new file 13 (GSF)

92
Manual Modeling, Optimization and Design Op Pit A - FIM

one. Enter the menu MineSight® / Economic Planner (MSEP) / Programs . Open the program
Initialize MSEP GSF. panel
1

GO.
You automatically creates the necessary items for a lmacenar the pit design.

two. MSOPIT enter the program - Design Pits. fill c Omo follows

93
Manual Modeling, Optimization and Design Op Pit A - FIM

Defining the new GSF una13.pto

Defining the design variable (net value bl or what)

94
Manual Modeling, Optimization and Design Op Pit A - FIM

TOPO and defining the item code Classifi- n resource which restrict CONF
measured and indicated only for blocks.

Range of values ​of the design variable

95
Manual Modeling, Optimization and Design Op Pit A - FIM

Defining the parameters economic Destination


Material Processing cost ($ Mining cost Specific Recovery
/ ton) ($ / ton) weight

Mill ALT1 3 one 2.5 75%


Mill ALT2 3 one 2.5 80%
dump ALT1 0 two 2.5
dump ALT2 0 two 2.5

a gold price of $ 1300 / Oz (05/10/2 considered 010).


Factor is the value converted to units pay bles ($ / ton) which is 0.03215
$ / Ton = law * Price * Recovery * Factor
This serves to calculate the net value of BLOQU is.

96
Manual Modeling, Optimization and Design Op Pit A - FIM

We will not use variable costs and discount rates annual.

97
Manual Modeling, Optimization and Design Op Pit A - FIM

an angle of constant slope of 45 degrees was used.

We define the design strategy and method of op timización Lerch-Grossman.

98
Manual Modeling, Optimization and Design Op Pit A - FIM

In Results, we send the current pit design to number 01

99
Manual Modeling, Optimization and Design Op Pit A - FIM

Define the outputs for route number ROUTE, VAL BK net value block VALPT
for value per ton.

Click on File / Manage Variables to save pará admitted meters


Click on File / Run Procedure to run the prog branch.

Wait to perform the calculations.

Interpreting the report

100
Manual Modeling, Optimization and Design Op Pit A - FIM

18 Display surface in optimum pit Mines ight 3D

one. Create a new folder named MSOPIT and create or n new model view

Click Yes

Select all items and delete the prefix Mo the View1. okay

101
Manual Modeling, Optimization and Design Op Pit A - FIM

Open PIT01, coloring by Cutoff

102
Manual Modeling, Optimization and Design Op Pit A - FIM

19 Operating Pit design with Pit Expansion Tool

First we will outline, ie generate contour of the surface PIT01 with Contour Tool

1. Create a folder called PIT FINAL create a geometry "contours" and put in edit mode.

2. Go to the Surface / Contour Tool menu, select the display surface.

103
Manual Modeling, Optimization and Design Op Pit A - FIM

3. Add a curve in the -40 to give operational level.

4. Create the geometry "Pit01" put in edit mode. Go to menu Eng Tools search for
Pit Expansion Tool.

104
Manual Modeling, Optimization and Design Op Pit A - FIM

5. With the Add button, select the main strings bottom of the pit bases.

6. Expand 28 banks to intersect the topography original. Preview, Apply.

105
Manual Modeling, Optimization and Design Op Pit A - FIM

On the Required tab can be set up bank (Step Size), and bank angles
overall slope expansion type, etc. in Optiona l pits can be generated according to certain
criteria block model, for example pue assigning angles according to the type of
rock.

7. In Roads (Highways) record, add a new co n the Add button and configure Edit
the starting point of the road.

106
Manual Modeling, Optimization and Design Op Pit A - FIM

Preview, Apply.

With the Triangulate button, you generate your DTM pit.

107
Manual Modeling, Optimization and Design Op Pit A - FIM

Close Pit Expansion, and save the settings.

twenty Topography intersecting with the final pit

one. FINAL PIT folder create a geometry denominad or TOPO + PIT, put mode
of edition.
two. Open the model view TOPOG of gridded SUR folder FACE

108
Manual Modeling, Optimization and Design Op Pit A - FIM

3. Go to the Surface / Intersect Surfaces Tool menu selection onar surfaces and run
Surface CuT cutting operation. Preview, Apply.

109
Manual Modeling, Optimization and Design Op Pit A - FIM

twenty-one
Reserve calculation Pitres

one. Compass Open, choose the file 13 una13.pt or

two. Open the program pitres

110
Manual Modeling, Optimization and Design Op Pit A - FIM

Panel 1, leave blank

panel 2

panel 2

111
Manual Modeling, Optimization and Design Op Pit A - FIM

panel 3

panel 4

112
Manual Modeling, Optimization and Design Op Pit A - FIM

panel 5

panel 6

113
Manual Modeling, Optimization and Design Op Pit A - FIM

Summary of bank reserves.