Professional Documents
Culture Documents
We are pleased to submit herewith the proposal for the Installation of Copper Tube and Drain line and
Aircon. Amounting to SEVENTY THOUSAND PESOS and 00/100 (Php 70,000.00). Please see below
breakdown for details:
10,000.
1 15ft 2.5 HF Master Bedroom 1 lot 00
17,000.
2 35ft 2.0 HF Bedroom 1 1 lot 00
C WALL MOUNT AIRCON INSTALLATION
4,000.
1 Aircon Installation of 2.5 HF @ 2nd Floor 1 lot 00
4,000.
2 Aircon Installation of 2.0 HF @ 2nd Flroor 1 lot 00
4,000.
3 Aircon Installation of 2.5 HF @ 3rd Floor 1 lot 00
4,000.
4 Aircon Installation of 2.0 HF @ 3rd Flroor 1 lot 00
TERMS OF PAYMENT:
1. 60 % Downpayment
2. 40 % Upon Installation done
Joecon Palec