QUOTATIONS AND OPTIONS FOR SURIA PANTAI UNIT 26-20

We refer to the above and we are pleased to quote you for the below mentioned items with the following descriptions, terms an

No. Descriptions for Option 3 Unit Qty Unit Price


Preliminaries, Pre-Construction works and Site
1
Management
 Setting out and site covering L/Sum 1 0.00
 Clearance during renovation L/Sum 1 0.00
 Clearance upon completion - debris removal and dusting
L/Sum 1 0.00
out
w Transportation L/Sum 1 0.00
w Debris management and rorobin rental L/Sum 1 200.00
w Water and electrical supplication L/Sum 1 0.00
WIRING, ELECTRICAL AND INSTALLATION
1
WORKS
1.1 New wiring works - hacking and conceal
 Additional 13A point complete with switch set at living
Nos 2 120.00
room
 Additional 13A point complete with switch set for room 2
Nos 2 120.00
& Additional
w 3 light and point complete with switch set for
Nos 2 100.00
room 2 & 3
w Reposition ceiling fan hook Nos 2 0.00
w Additional exhaust fan point and isntallation of exhaust
Nos 1 180.00
fan
w Replacement of plug point at wet kitchen area Nos 1 120.00
Copper and piping works for Aircondition - without
1.2
installation
 Living area (1.5hp or 2hp) L/Sum 1 450.00
w Master bedroom area (1.0hp) L/Sum 1 350.00

1.3 Installation Works


 Installation of ceiling fan - install only - client to provide
Nos 5 60.00
fan
 Installation of ceiling lights - on existing point for whole
Nos 1 0.00
house
 Installation of water heater - install only - client to
Nos 2 120.00
provide
2 CEILING WORKS
Supply of labour and workmanship for ceiling works
w Installation of box up ceiling to cover copper works L/Sum 1 650.00
w Installation of flat plaster ceiling for hallway complete
L/Sum 1 250.00
with wiring
w Installation of box up to cover curtain rail at living hall L/Sum 1 250.00

3 CONCRETE, TILING AND WET WORKS


 New concrete table top complete with sink and hob hole L/Sum 1 2400.00
w To supply and install wall tiles for whole area L/Sum 1 1600.00
w Piping adjustment works for sink area with tiles work - at
L/Sum 1 450.00
dry kitchen of sliding window with exhaust fan attach to
w Installation
L/Sum 1 780.00
it
4 CARPENTRY WORKS
Installation of new DRY Kitchen Cabinet - Melamine Panel
L/S 1 7800.00
+ Quartz Top
w Come with new sink
 Soft close, accessories and drawers

Installation of new WET Kitchen Cabinet - 4G door panel L/S 1 2700.00


 Soft close, accessories and drawers

Total
ollowing descriptions, terms and conditions:

Amount Remarks

0.00 Included
0.00 Included
0.00 Included
0.00 Included
200.00
0.00 Client to provide

position to be
240.00
determined
position to be
240.00
determined
position to be
200.00
determined
0.00 FOC
180.00 Client to provide fan
120.00 Client to provide fan

with hacking and


450.00
plastering
with hacking and
350.00
plastering

300.00
FOC - client to provide
0.00
lights
240.00 With piping set

650.00 for both aircond works


250.00
250.00 Inclusive of curtain rail

2400.00 L shape
1600.00 labour and materials
450.00
780.00

7800.00
2700.00 L - Shape

19400.00