6 ELECTRICAL WORKS
7 BATHROOMS
PLUMBING: CHANGING &
INSTALLATION OF ALL THE FITTINGS AND PER
FIXTURES IN 2 BATHROOMS(ALL FITTINGS 2 20000 40,000.00
BATHROOM
& FIXTURES TO BE PROVIDED BY THE
CLIENT)
PROVIDING & FIXING VANITY IN
LAMINATED WPC BELOW WASHBASIN L/S 1 20,000.00 20,000.00
IN 2 BATHROOMS
8 MASTER BEDROOM
9 BEDROOM 2
10 BEDROOM 3
11 BEDROOM 4
PROVIDING & FIXING OF MACHINE
MADE WARDROBE IN LAMINATED
ACTION TESA HDHMR BOARD WITH
SOFT CLOSE HAFELE/HETTICH HINGES &
P. Sq. Ft. 51 1,650.00 84,150.00
CHANNELS; 0.8MM INTERNAL LAMINATE
; 1MM OUTER LAMINATE; INTERNAL
PROFILE LIGHTS AS PER DESIGN (PER
HANDLE COST : RS.250/-)
13 FAMILY LOUNGE
14 DOORS
REFURBISHING ALL THE DOORS WITH PLY
, VENEER, MELAMINE POLISH & NEW
HARDWARE AS PER PER UNIT 8 12,000.00 96,000.00
DESIGN(HARDWARE TO BE PROVIDED
BY THE CLIENT)
PROVIDING & FIXING OF SOLID WOOD
MAIN DOOR AS PER DESIGN (HARWARE PER UNIT 1 35,000.00 35,000.00
TO BE PROVIDED BY THE CLIENT)