DIDURIT M60-5 V
Classification Refractory concrete (LCC) DIN EN ISO 1927-1
Bonding type Hydraulic
Processing
Processing below 5 °C is not recommended !!
Optimum processing temperature of the material: 15 to 25 °C
4,9-5,5 l/100kg
Mixing process
Dry mixing time: 1 minute
Addition of mixing compound
Wet mixing: 6 minutes, depending on mixing device
4,9-5,5 l/100kg
To set the correct dosing of the mixing compound, a consistency test ("ball-in-hand" test) is recommended!
Preparation of templates
The entire surface of the template must be treated with a suitable form release agent.
Lining
Do not mix more material than can be used up within 20 minutes! (Take transportation into account!)
Lining of the individual components must be done continuously and without interruption. Layer formation must
be avoided!
Air drying
After stripping, the components have to be exposed to air for a minimum of 24 hours to set. During this time,
the elements have to be kept moist or covered with film. Do not start heating before this minimum period of 24
hours is over.
Installed material needs to be protected from frost until it is heated.