Systems Inquiry Questions

****

Power Requirements

What are the total power requirements for industrial/telecom equipment?

● Are the loads both AC and DC load?


R: Mainly DC (40 AMP @48 V DC), only few watts on AC (5
Amp @ 110 V AC)

● How many continuous watts of AC Power are required at each site?


R: About 600 Watts

● How many continuous watts of DC Power are required at each site?


R: About 2000 Watts

● What is the peak load consumed? kW, kWh?


R: About 2500 Watts

● What is the average load consumed? kW, kWh?


R: About 1920 Watts

● How large are the loads? kW?


R: About 1920 Watts

● How long will the loads operate? Time of Use? Watt-hrs per day?
R: The loads operate 24 hours per day @ 365 days per year.

● Will the loads operate day and night?


R: Yes. The loads will.
● What is the range, or the ranges of the power draw at each location?
R: From 1920 to 2500 Watts

● If multiple site locations are the load requirements the same at each
site?
R: Maybe we wiil have more sites like Maniapure

● Battery Considerations
○ Battery technology type?
R: Slow Discharge (GEL)
○ Bank voltage and capacity (i.e. 48Vdc, 3,000 amp-hours)?
R: 48 Vdc, 40 Amp

● How many days of autonomy (days without solar recharge) are


required?
R: One day or 24 hours

Location Details

● What is the Lattitude/Longitude (or city/country) of the site?


R: 5.920833°, -66.557222° (05°55'15", -66°33'26")

● How many clear (non-shaded) square meters are available at the site
for the solar PV system?
R: More than 100 square meters

● Is there a security fence?


R: Yes, There is

● Do the sites have an electric grid available?


R: Yes, They do. But the electric grid is not stable
How many hours per day of grid availability?
R: We do not have this data right now but we can find it
● Do the sites have an AC generator available?
○ Yes, They Do
○ What is the size of the generator?
■ We do not have this information right now

● Will remote monitoring be required? If so describe site connectivity


and communication protocols required, etc.
Of course, we need to monitor remotely the site trough IP and SNMP
Protocol (standard MIBs and TRAPS)

Commercial

● How many sites are you looking to solarize with our equipment?
R: Mora than 200 sites maybe more
● What is your planned project and rollout timeframe?
○ R: First we can do the pilot project and then we can start the big
project where we have about 200 sites
○ When do you need a quotation for the bid?
○ R: As soon as possible, this week.
■ Bid or contract award date?
○ R: This date is not clear yet but it is before the end of the year
○ When do you need the product built?
■ R: As soon as possible before of the end Jan 2021
○ When do you need the product delivered to-country; to site?
■ R: As soon as possible before of the end Dec 2020