BESTWAY CEMENT LIMITED CHAKWAL

PRODUCTION DEPARTMENT
Coal Fired Boiler Benefits
Date: 24.01.2014
Sr.# Description Value Remarks
Monthly Saving due to Peak Hours Before Boiler, load at peak hours around 5
= 2
Availing (MW) MW and with boiler 3 MW
Price Difference = 5,900 Rs/MW
1
Peak Hours MW (4*2) = 8
Saving per day = 47,200 Rs.
Saving in 30 days = 1,416,000 Rs.

Saving due to Mill Stoppages


Per stoppage impact of KWH = 0.15 KWH
Cement Production = 3,000 Tons
2
Total KW = 450
Price of 450 KWH = 6,233 Rs
Saving for 30 days = 186,975 Rs

Saving due to self consumption of Generator.


Breakdown time after sinkout = = 2 Hrs
Generator Self Consumption = = 1 MW
3
Priece Rs/MW = 13,850 Rs
Cost per sink out = 27,700 Rs
Cost for 2 breakdowns = 55,400 Rs (Only from 1st Dec-13 to 20 Jan-14)
Toal Saving (1+2+3) per month 1,658,375 Rs

4 Peak hours availability Available for Production.


5 Forced load shedding Avoided due to low load.

KWH Produced by Boiler inspite of kiln


6 = 170,000 KWH
stoppage

Time Required for heating of WHRPP = 5.00 Hrs

KWH During 5 hrs. (5x4.5x1000) = 22500 KWH


Price per KWH = 13.85 Rs
Saving Due to Boiler = 311,625