DG LOAD CALCULATION

1.     Present DG Capacity = 750 kVA

2.     Present
Load Consumption (As per Existed MD noted in MSEB Meter)
– For Imida process only
Dated = July 2019
Total maximum demand = 425 kVA (70.90 x 6[Multiplying factor])

3.     Future Load consumption


  Plant Area = 56 KW

  Utility Area
Brine Chiller Compressor = 250KW x 2
= 500KW
Cooling Water Pump = 60 KW
Cooling Water Fan = 30 KW
Primary/ Secondary Pump Cooli = 60 KW
MEE/ETP = 139 KW

Net Total = 789 KW

  For Plant Area considering diversity factor of 0.6 = 56 x 0.6


= 33.6 KW

  For Utility Area considering diversity factor of 0.7 = 789 x 0.7


= 552.3 KW

Total KW = 552.3 + 33.6


= 585.9 KW
Total kVA = 585.9 / 0.85
= 689.3 kVA

4.     Total Requirement of Diesel Generator

Total Requirement = Current maximum demand + Future requirement


= 425 + 689.3
= 1114.3 kVA

Current DG capacity is not sufficient to bear the load capacity if lambda process and
Brine Chiller starts simultaneously with Imida process. DG Up-gradation required.