2. Present
Load Consumption (As per Existed MD noted in MSEB Meter)
– For Imida process only
Dated = July 2019
Total maximum demand = 425 kVA (70.90 x 6[Multiplying factor])
Utility Area
Brine Chiller Compressor = 250KW x 2
= 500KW
Cooling Water Pump = 60 KW
Cooling Water Fan = 30 KW
Primary/ Secondary Pump Cooli = 60 KW
MEE/ETP = 139 KW
Current DG capacity is not sufficient to bear the load capacity if lambda process and
Brine Chiller starts simultaneously with Imida process. DG Up-gradation required.