Survey Formates Excel

Date : Instrument: Major Traverse by Total Station Horizontal Angle Observation Sheet Ht. of ins. Ins. St. & Sighted to HCR Observation Mean Horizontal angle Mean of sets Vertical/ Stadia reading {m} Horizontal Mean RL {(I+II)/2} Zenithal angle distance{m} of staff Face d m s m s d m s d m s d m s T M B dist. dist. Remarks L R L I-Set R L

Uploaded by

DANISH YASIN 064
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views44 pages

Survey Formates Excel

Date : Instrument: Major Traverse by Total Station Horizontal Angle Observation Sheet Ht. of ins. Ins. St. & Sighted to HCR Observation Mean Horizontal angle Mean of sets Vertical/ Stadia reading {m} Horizontal Mean RL {(I+II)/2} Zenithal angle distance{m} of staff Face d m s m s d m s d m s d m s T M B dist. dist. Remarks L R L I-Set R L

Uploaded by

DANISH YASIN 064
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Tribhuvan University

Institute of Engineering
Central Campus, Pulchowk
Department of Civil Engineering
Survey Instruction Committee
B.E. Survey Camp 2071, III/I : 2068 Batch
2014 April 24 to May 10 (2071 Baisakh 12 to 30
Content of Booking Formate
S.No. Name of Booking Formate Formate Required Remarks
Number number of sheet

1 Reference sketch of station 1 8

2 Distance measurement by tape 2 2


3 Distance measurement by total station 3 4
4 Major traverse by Theodolite 4 3
5 Major traverse by Total station 5 5

6 Analytical resection for coordinate transfer 6 1


7 Minor traverse by Theodolite 7 3
8 Minor traverse by Total station 8 3
9 Detailing by Theodolite (Tacheometry) 9 5
10 Detailing by Total station 10 30
11 Two peg test 11 1
12 Fly levelling 12 6
13 Reciprocal levelling 13 1
14 Levelling (L-Section and X-Section) 14 6
15 Levelling (Rise and Fall method) 15 3

16 Levelling (HI method) 16 2


17 Intersection 17 1
18 Chainage computation of curve in road alignment 18 2
19 Gales table 19 2
Bridge site Triangulation (Base triangle) by
20 theodolite 20 2
21 Bridge site Triangulation by Theodolite 21 3
22 For computation of detailing by Tacheometry 1

23 For computation of detailing by Total station 1


Total 95 Sheets
Reference sketch of Control Station 1

Group No: Date:

Station No: Station No:

Station No: Station No:

Signature of the Teacher at site....................... Page No:


Signature of the Teacher at site....................... Page No:
Tribhuvan University
Institute of Engineering
Central Campus, Pulchowk
Group no: Department of Civil Engineering 2
Survey Instruction Committee
Observer : Date :
Recorder : Weather:
Instrument : Distance measurement Sheet by Tape Temperature:

Line Distance (m) Discrepancy Precision


S.No. Average Remarks
From To Forward (FW) Total FW Backward (BW) Total BW ≥ 1 : 2,000

Signature of Teacher at site........................... Page No:


Signature of Teacher at site........................... Page No:
Tribhuvan University
Institute of Engineering
Central Campus, Pulchowk
Department of Civil Engineering 3
Group no: Survey Instruction Committee
Observer : Date :
Recorder : Weather:
Instrument : Distance measurement sheet by Total Station Temperature:

Line Distance (m) Discrepancy Precision


S.No. Average
≥ 1 : 5,000
Remarks
From To Forward (FW) Backward (BW)

Signature of Teacher at site........................... Page No:


Signature of Teacher at site........................... Page No:
Tribhuvan University
Institute of Engineering
Central Campus, Pulchowk
Group no: Department of Civil Engineering 4 Bearing:
Survey Instruction Committee
Observer : Date :
Recorder : Major Traverse by Theodolite Weather:
Instrument : Horizontal Angle Observation Sheet Temperature:
HCR Observation Mean Horizontal angle Mean of sets Vertical/ Stadia reading {m} Horizontal Mean RL
{(I+II)/2} Zenithal angle distance{m} of staff
Sighted to
Ht. of ins.
Ins. St. &

point by
Mean Sta. Tape stadia
Face

d m s m s d m s d m s d m s T M B dist. dist. Remarks


L
R
L
I-Set R
L
R
L
II-set R
L
R
L
I-Set R
L
R
L
II-set R
L
R
L
I-Set R
L
R

Signature
II-set of Teacher at site................................. Page No:
L
II-set R

Signature of Teacher at site................................. Page No:


Tribhuvan University
Institute of Engineering
Central Campus, Pulchowk 5
Department of Civil Engineering Bearing :
Group no: Survey Instruction Committee
Observer : Date :
Recorder : Total Station Traverse Weather:
Instrument : Horizontal Angle Observation Sheet Temperature:

F Set-I Set-II Mean Horizontal Horizontal Vertical


Inst st and

Sighted to
Ht of Inst

A Target
HCR observation Mean Horizontal Angle HCR observation MeanHorizontal Angle angle {(I+II)/2} Distance Dist Remarks
Object

C Ht (m)
E ± (m)
d m s m-s d m s d m s m-s d m s d m s (m)
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
Tribhuvan University
Institute of Engineering
Central Campus, Pulchowk
Department of Civil Engineering 6 Bearing:
Group no:
Survey Instruction Committee
Observer : Date :
Recorder : Analytical Resection for Coordinate Transfer Weather:
Instrument : Temperature:
Set - I Set- II Mean Zenithal Angle Remarks
Ins. St. & Ht.

Horizontal Horizontal
Sighted to

HCR Observation HCR Observation Mean Horizontal angle Angle of Set


Mean angle
of ins.

{(I+II)/2}
Face

d m s d m s m s d m s d m s
m s d m s

Signature of Teacher at Site........................ Page No:


Tribhuvan University
Institute of Engineering
Central Campus, Pulchowk 7
Group no: Department of Civil Engineering
Survey Instruction Committee
Observer : Date :
Recorder : Minor Traverse by Theodolite Weather:
Instrument : Temperature:
Sighted to HCR Observation Mean Horizontal angle
Ht. of ins.
Ins. St. &

Face d m s m s d m s Remarks
L

L
R

Signature of Teacher at site................................. Page No:


R

Signature of Teacher at site................................. Page No:


Tribhuvan University
Institute of Engineering
Central Campus, Pulchowk 8
Group no: Department of Civil Engineering
Survey Instruction Committee
Observer : Date :
Recorder : Minor Traverse by Total Station Weather:
Instrument : Temperature:
HCR Observation Mean Horizontal angle Horizontal
Sighted to
Ht. of ins.
Ins. St. &

distance
Face
d m s m s d m s Remarks
L

L
R

Signature of Teacher at site................................. Page No:


R

Signature of Teacher at site................................. Page No:


Tribhuvan University
Institute of Engineering
Central Campus, Pulchowk 9
Group no: Department of Civil Engineering
Survey Instruction Committee
Observer : Date :
Recorder : Detailing by Tacheometry Weather:
Instrument : Temperature:
HCR Observation Stadia Reading (m) Vertical/Zenithal Angle
Sighted to
Ht. of ins.
Ins. St. &

d m s Top Mid Bot d m s Remarks

Signature of Teacher at site................................. Page No:


Signature of Teacher at site................................. Page No:
Tribhuvan University
Institute of Engineering
Central Campus, Pulchowk 10
Group no: Department of Civil Engineering
Survey Instruction Committee
Observer : Detailing by Total Station Date :
Recorder : Coordinate: X Y Z Weather:
Instrument : Backsight: Temperature:
Occupied Station:
HCR Observation Horizontal Vertical Remarks

height (m)
Sighted to
Ht. of ins.
Ins. St. &

Distance (m) Distance (m)


±
Signal

d m s

Signature of Teacher at site................................. Page No:


Signature of Teacher at site................................. Page No:
Tribhuvan University
Institute of Engineering
Central Campus, Pulchowk 11
Group no: Department of Civil Engineering
Survey Instruction Committee
Observer : Date :
Recorder : Two peg or Collimation test Weather:
Instrument : Temperature:

When instrument is at midway of two pegs:


Instrument Sighted Staff readings (m) Mean Value = True difference; Remarks
at to {(T+M+B) ÷ 3} h1=(MidA-MidB)
Top Mid Bottom

A
P
B

When Instrument is at near one Peg:


Instrument Sighted Staff readings (m) Mean Value = Apparent difference; Remarks
at to {(T+M+B) ÷ 3} h2=(MidA-MidB)
Top Mid Bottom

A
Q
B

Note: Compare mean value with middle wire readings which should be within tolerance ± 1mm

True difference, h1 = (a1-b1)…………………………………(1)


Apparent difference, h2 = (a2-b2)……………………………(2)
Collimation error, e = |[(h1-h2) ÷ (d/2+d/2)]|
Precision = 1/d/e ≥ 1 in 10,000

Signature of Teacher at site.................................


Obtained precision = 1/d/e =

Signature of Teacher at site.................................


Tribhuvan University
Institute of Engineering
Central Campus, Pulchowk
12
Department of Civil Engineering
Group no: Survey Instruction Committee
Observer : Date :
Recorder : Weather:
Instrument : Fly Levelling (RL Transfer) Temperature:

BS S1 FS S2 Stadia
Stations Hz. Dst
Mean Mean Fall Elevation Interval
Rise + (m) Remarks
Top Mid Bot BS (T-B) Top Mid Bot FS (T-B) - (m)
Chainage Sx100
S=S1+S2

Signature of Teacher at site........................... Page No:


Signature of Teacher at site........................... Page No:
Tribhuvan University
Institute of Engineering
Central Campus, Pulchowk 13
Group no: Department of Civil Engineering
Survey Instruction Committee
Observer : Date :
Recorder : Reciprocal Levelling Weather:
Instrument : Temperature:

When instrument is very near to A:


Instrument Sighted Staff readings (m) Mean Value = Apparent difference; Remarks
at to {(T+M+B) ÷ 3} h1=(MidA-MidB)
Top Mid Bottom

A
Very near
to A B

When Instrument is very near to B:


Instrument Sighted Staff readings (m) Mean Value = Apparent difference; Remarks
at to {(T+M+B) ÷ 3} h2=(MidA-MidB)
Top Mid Bottom
A
Very near
to B B

Check: (T+M+B) ÷ 3 = Mean - Mid = 3mm Tolerance

Apparent difference of level between A & B, h1 = |(a1-b1)|


Apparent difference of level between A & B, h2 = |(a2-b2)|
True difference in heights between A & B = [(a1-b1)+(a2-b2)]÷2 = (h1+h2)÷2
Error, e = |(h1-h2)|
Signature of Teacher at site.................................
Permissible error = ± 25√K mm. Where, K = loop distance in km = 2* axis distance in km

Signature of Teacher at site.................................


Tribhuvan University
Institute of Engineering
Central Campus, Pulchowk
Department of Civil Engineering 14
Group no: Survey Instruction Committee
Observer : Date :
Recorder : Weather:
Instrument : Temperature:
Levelling for L- Section and X - Section

Center Line
Left Offset Right Offset Reduced
Points BS IS FS HI Remarks
(m) (m) Level (m)
Chainage

Signature of Teacher at site......................... Page No:


Signature of Teacher at site......................... Page No:
Tribhuvan University
Institute of Engineering
Central Campus, Pulchowk
Department of Civil Engineering 15
Group no: Survey Instruction Committee
Observer : Date :
Recorder : Weather:
Instrument : Temperature:
Leveling Field Book by Rise and Fall method
Staff
Distance/ Rise Fall Reduced Level
Stations BS IS FS Remarks
Chainage + - (m)
Tribhuvan University
Institute of Engineering
Central Campus, Pulchowk
16
Department of Civil Engineering
Group no:
Survey Instruction Committee
Observer : Date :
Recorder : Weather:
Instrument : Temperature:
Leveling Field Book by HI method
Staff Distance/
stations Reduced
BS IS FS HI (m) Remarks
Level (m)
Chainage

Signature of Teacher at site........................... Page No:


Signature of Teacher at site........................... Page No:
Tribhuvan University
Institute of Engineering
Central Campus, Pulchowk
Department of Civil Engineering 17 Bearing:
Group no:
Survey Instruction Committee
Observer : Date :
Recorder : Analytical Intersection for Coordinate Transfer Weather:
Instrument : Temperature:
Set - I Set- II Mean Zenithal Angle Remarks
Ins. St. & Ht.

Horizontal Horizontal
Sighted to

HCR Observation HCR Observation Mean Horizontal angle Angle of Set


Mean angle
of ins.

{(I+II)/2}
Face

d m s d m s m s d m s d m s
m s d m s

Signature of Teacher at Site........................ Page No:


Tribhuvan University
Institute of Engineering
18 Bearing:
Central Campus, Pulchowk
Department of Civil Engineering
Group no: Survey Instruction Committee
Observer : Date :
Recorder : Chainage computation of curve in Road alignment Weather:
Instrument : Temperature:
Line/Leg
Deflection Angle = ± Δ Radius of Tangent Length of Apex
IP Station

IP to IP Chainage of IP Chainage of Chainage of Chainage of


From To Curve, Length Curve, Distance, Remarks
Distance station BC (km) MC (km) EC (km)
IP IP R (m) TL (m) L (m) E (m)
± d m s

Signature of Teacher at site.......................... Page No:


Signature of Teacher at site.......................... Page No:
Tribhuvan University
Institute of Engineering
19 Bearing:
Central Campus, Pulchowk
Department of Civil Engineering
Survey Instruction Committee
Major / Minor Traverse Computation (Gale's Table)
Reference Co-ordinate: X Y Z
Group no:
Station No: Date :
Observed Corrected Whole Circle Corrected consecutive
Angle Angle bearing Consecutive Co- Independent
Correction
Co-ordinate ordinate Co-ordinate Adjusted Adjusted
Correction
Leg/Line

Distance

Latitude length Bearing


Station

d m s d m s d m s Departure Latitude Latitude


=l Departure Departure Northing Easting
= l sinɵ
cosɵ

Sum = ∆L= ∆D=

Signature of Teacher at site.......................... Page No:


Signature of Teacher at site.......................... Page No:
Tribhuvan University
Institute of Engineering
Central Campus, Pulchowk
Department of Civil Engineering 20 Bearing:
Group no:
Survey Instruction Committee
Observer : Date :
Recorder : Bridge Site Triangulation (Base Triangle) by Theodolite Weather:
Instrument : Temperature:
Set - I Set- II Mean VCR Observation Signal Remarks
Ins. St. & Ht.

Horizontal height
Sighted to

HCR Observation HCR Observation Mean Horizontal angle Angle of Set


Mean Horizontal angle
of ins.

{(I+II)/2}
Face

d m s d m s m s d m s d m s
m s d m s
L

A and B are Control


C
R

Station of Bridge
L
A B
R
L
D

Axis
R
L
D
R
L
B A
R
L
C
R
L
B
R
C
L
A
R
L
A
R
D
L
B
R

Signature of Teacher at Site........................ Page No:


Tribhuvan University
Institute of Engineering
Central Campus, Pulchowk 21
Group no: Department of Civil Engineering
Survey Instruction Committee
Observer : Date :
Recorder : Bridge Site Triangulation by Theodolite Weather:
Instrument : Temperature:
Sighted to HCR Observation Mean Mean Horizontal angle
Ht. of ins.
Ins. St. &

Face d m s m s d m s Remarks
L

L
R

Signature of Teacher at site................................. Page No:


R

Signature of Teacher at site................................. Page No:


Tribhuvan University
Institute of Engineering
Central Campus, Pulchowk
Department of Civil Engineering
Survey Instruction Committee
Observer : Date :
Recorder : TACHEOMETRY SURVEY SHEET Weather:
Instrument : Temperature:

Stadia
Inst. Stn. Stadia Reading Vertical Vertical R L of points
Horizontal Angle intercept Hz. Dst
& Ht. of Sighted to Angle/Zenithal distance Remarks
{d-m-s) Top Mid Bot (m)
Inst. {d-m-s} ± (m) (m)
S=T-B
Tribhuvan University
Institute of Engineering
Central Campus, Pulchowk
Department of Civil Engineering
Err:509
Observer : Date :
Recorder : Weather:
Instrument : Differential Leveling by HI method (Three Wire ) Temperature:

Stadia
Height of
Stations Back Sight BS S1 Fore Sight FS S2 Elevation Interval Hz. Dst
Mean Mean
(m)
Top Mid Bot BS (T-B) Top Mid Bot FS (T-B) Instrument
Chainage (m) Sx100
HI (m)
S=S1+S2
Remarks
Tribhuvan University
Institute of Engineering
#REF!
DEPARTMENT OF CIVIL ENGINEERING

Dealt by :
Instrument used : Adjustment of Elevations (R L)
Project : Date :

(error/Σd)x cumu d Correction Adjusted


Partial Observed or
Stations
Distance
Chainage Elevation (R L)
Elevation Remarks
(error/ΣNo of TPs)x cumu TPs + or - (R L)