BCE Survey Camp Practical Field Works Schedule 2077(2017 Batch)
Group 1 to 8 Effective From:15 Falgun 2077
Date 15 Falgun 16 Falgun 17 Falgun 18 Falgun 19 Falgun 20 Falgun 21 Falgun 22 Falgun 23 Falgun 24 Falgun
Group DAY - 1 DAY - 2 DAY - 3 DAY - 4 DAY - 5 DAY - 6 DAY - 7 DAY - 8 DAY - 9 DAY - 10
1 Recce MT/mt TPT+FL Det/Comp Detail+Plot RAS RAS BS Survey BS Detail Detail+Viva
2 Recce MT/mt TPT+FL Det/Comp Detail+Plot RAS RAS BS Survey BS Detail Detail+Viva
3 Recce MT/mt TPT+FL Det/Comp Detail+Plot RAS RAS BS Survey BS Detail Detail+Viva
4 Recce MT/mt TPT+FL Det/Comp Detail+Plot RAS RAS BS Survey BS Detail Detail+Viva
5 Recce MT/mt TPT+FL Det/Comp Detail+Plot RAS RAS BS Survey BS Detail Detail+Viva
6 Recce MT/mt TPT+FL Det/Comp Detail+Plot RAS RAS BS Survey BS Detail Detail+Viva
7 Recce MT/mt TPT+FL Det/Comp Detail+Plot RAS RAS BS Survey BS Detail Detail+Viva
8 Recce MT/mt TPT+FL Det/Comp Detail+Plot RAS RAS BS Survey BS Detail Detail+Viva
Description
Recce:Reconnaissance MT:Major Traverse FL:Fly level REC:Resection
RAS:Road Alignment Survey mt:Minor Traverse Det:Detail INT: Intersection
BS:Bridge Site Survey TPT:Two Peg Test Comp:Computation Plot: Plotting
Reference sketch of Control Station
Observer :
Recorder :
Instrument : Distance measurement Sheet by Tape
Line Distance (m)
S.No.
From To Forward (FW) Total FW Backward (BW) Total BW
E COLLEGE
Date :
Weather:
Temperature:
Precision
Discrepancy
Average ≥ 1 : 2,000 Remarks
Group no:
Observer :
Recorder :
Instrument :
Line
S.No.
From To Forward (FW)
UNIVERSAL ENGINEERING AND SCIENCE COLLEGE
Chakupat, Lalitpur
Department of Civil Engineering
Date :
Weather:
y Tape Temperature:
Discrepancy Precision ≥ 1 : 2,000
Average Remarks
Total BW
UNIVERSAL ENGINEERING AND SCIENCE COLLEGE
Chakupat Lalitpur
Group no: Department of Civil Engineering
Group no:
Observer :
Recorder :
Instrument : Distance measurement Sheet by Total Station
Line Distance (m) Discrepancy
S.No. Average
From To Forward (FW) Backward (BW)
GE
Date :
Weather:
Temperature:
Precision Remarks
≥ 1 : 5,000
UNIVERSAL ENGINEER
Group no: Department
Group no:
Observer :
Recorder : Major Traverse
Instrument : Horizontal Angle
F
and Ht of
Set-I Set
Sighted
Inst st
A
Inst
C
E d m s d-m-s d m s d m s
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
0
NIVERSAL ENGINEERING AND SCIENCE COLLEGE
Department of Civil Engineering Bearing :
Date :
Weather:
Temperature:
Observer :
Recorder : Minor Traverse by Total Station
Instrument :
Sighted to
Face
ins.
d m s d-m-s d m
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
Date :
Weather:
Temperature:
l angle
s Remarks
UNIVERSAL ENGINEERING AND SCIENCE COLLEGE
Chakupat Lalitpur
Group no: Department of Civil Engineering
Observer :
Recorder :
Instrument : Detailing Sheet by Total Station
S.N Instrument at Inst.Ht Ref.Ht Easting( E ) Northing(N)
SCIENCE COLLEGE
ur
ngineering
Date :
Weather:
ation Temperature:
Elevation(Z) ID Remarks
Central Engineering Campus
Group no: Department of Civil Engineering
Observer : Date :
Recorder : Weather:
Note: Compare mean value with middle wire readings which should be within tolerance ± 1mm
Observer :
Recorder : Fly Levelling (RL Transfer)
Stations BS S1 FS
Mean Mean
Top Mid Bot BS (T-B) Top Mid Bot FS
Chainage
G AND SCIENCE COLLEGE
t, Lalitpur
Civil Engineering
Date :
g (RL Transfer) Weather:
S2 Stadia
Hz. Dst
Fall Elevation Interval
Rise + (m) Remarks
(T-B) - (m)
Sx100
S=S1+S2
UNIVERSAL ENGINEERING AND SCIENCE COLLEGE
Chakupat, Lalitpur
Group no: Department of Civil Engineering
Center
Left Right
Line Reduced
Points Offset Offset BS IS FS HI Remarks
Level (m)
(m) (m)
Chainage
UNIVERSAL ENGINEER
Group no: Chaku
Department o
Observer :
Recorder : Analytical In
Instrument :
Set - I
& Ht. of
Sighted
Ins. St.
d m s m s d m
to
L
R
L
R
L
R
L
R
UNIVERSAL ENGINEERING AND SCIENCE COLLEGE
Chakupat, Lalitpur
Bearing:
Department of Civil Engineering
Date :
Analytical Intersection Weather:
Temperature:
Set- II Mean
l angle HCR Observation Mean Horizontal angle Horizonta
s d m s m s d m s l Angle of
Set
Bearing:
Temperature:
d m s
UNIVERSAL ENGINEER
Chaku
Group no: Department o
Observer :
Recorder : Analytical R
Instrument :
Set - I
& Ht. of
Sighted
Ins. St.
d m s m s d m
to
L
R
L
R
L
R
L
R
L
R
L
R
UNIVERSAL ENGINEERING AND SCIENCE COLLEGE
Chakupat, Lalitpur
Department of Civil Engineering Bearing:
Date :
Analytical Resection Weather:
Temperature:
Set- II Mean
l angle HCR Observation Mean Horizontal angle Horizonta
s d m s m s d m s l Angle of
Set
ring:
Temperature:
d m s
Universal Engineering and Science College
Chakupat, Lalitpur
Department of Civil Engineering
Group no:
Adjustment of Reduced Level
Calculate
Partial d
Stations Chainage Correction ±
Distance Reduced
Level
ience College
neering
Date:
Adjusted Reduced
Remarks
Level
Universal Engineering and Science College
Chakupat, Lalitpur
Station
From To of IP Curve,
Distance
IP IP station ± d m s R (m)
IP
Steps to be followed to compute the Road Hz Curve Elements during field survey
Date :
f curve in Road alignment Weather:
Temperature:
Tangent length)
1, 2, 3, 5, 6 and 7
Universal Engineering and S
Chakupat, Lalitp
Department Of Civil En
Recorder:
Instrument:
Group no:
Distance
Correcti
Station
d m s d m s
on
Sum =
Universal Engineering and Science College
Chakupat, Lalitpur
Department Of Civil Engineering Bearing:
Consecutive Independent
Whole Circle bearing Correction Corrected
Co-ordinate Co-ordinate
d m s Latitude Departure Latitude consecutive
Latitude
Departure Departure Northing
= l cosɵ = l sinɵ
∆L= ∆D=
earing:
Temperature:
Pressure:
Date :
Independent
Co-ordinate Adjusted
Easting length
Universal Engineering and Science
Chakupat, Lalitpur
Department of Civil Engineer
Group no:
Date :
Weather:
cted independent Coordinates
E
UNIVERSAL ENGINE
Ch
Group no: Departmen
Observer :
Recorder : Bridge Site Triangulat
Instrument :
Set - I
& Ht. of
Sighted
Ins. St.
d m s m s d m s
to
L
C
R
L
A B
R
L
D
R
L
D
R
L
B A
R
L
C
R
L
B
R
C
L
A
R
L
A
R
D
L
B
R
UNIVERSAL ENGINEERING AND SCIENCE COLLEGE
Chakupat, Lalitpur
Department of Civil Engineering Bearing:
Date :
ridge Site Triangulation (Base Triangle) by Theodolite Weather:
Temperature:
Temperature:
Control Station
of Bridge Axis
A and B are
Universal Engineering and ScienceCollege
Chakupat, Lalitpur
Department Of Civil Engineering
Group no:
For Computation of Detailing by Total Station
Observer : Co-ordinate X Y
Recorder : Backsight
Occupied Station
HCR Observation Horizonta
Height (m)
Instrument
Sighted to
l Distance Vertical
Reduced
at & HI
± distance
Signal
Group No:
S.N Roll No. Name Attendence Remarks
1
2
3
4
5
6
7
Group No:
S.N Roll No. Name Attendence Remarks
1
2
3
4
5
6
7
Group No:
S.N Roll No. Name Attendence Remarks
1
2
3
4
5
6
7
Teacher Name :
Signature:
Date:
Universal Engineering and Science College
Chakupat Lalitpur
Department of Civil Engineering
DAILY PROGRESS RECORD SHEET
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
Teacher Name :
Signature:
Date:
Universal Engineering and Science College
Chakupat Lalitpur
Department of Civil Engineering
EVALUATION SHEET
Teacher Name :
Signature:
Date: