You are on page 1of 53

UNIVERSAL ENGINEERING AND SCIENCE COLLEGE

Chakupat, Lalitpur
BCE Survey Camp Practical Field Works Schedule 2077(2017 Batch)
Group 1 to 8 Effective From:15 Falgun 2077
Date 15 Falgun 16 Falgun 17 Falgun 18 Falgun 19 Falgun 20 Falgun 21 Falgun 22 Falgun 23 Falgun 24 Falgun
Group DAY - 1 DAY - 2 DAY - 3 DAY - 4 DAY - 5 DAY - 6 DAY - 7 DAY - 8 DAY - 9 DAY - 10
1 Recce MT/mt TPT+FL Det/Comp Detail+Plot RAS RAS BS Survey BS Detail Detail+Viva
2 Recce MT/mt TPT+FL Det/Comp Detail+Plot RAS RAS BS Survey BS Detail Detail+Viva
3 Recce MT/mt TPT+FL Det/Comp Detail+Plot RAS RAS BS Survey BS Detail Detail+Viva
4 Recce MT/mt TPT+FL Det/Comp Detail+Plot RAS RAS BS Survey BS Detail Detail+Viva
5 Recce MT/mt TPT+FL Det/Comp Detail+Plot RAS RAS BS Survey BS Detail Detail+Viva
6 Recce MT/mt TPT+FL Det/Comp Detail+Plot RAS RAS BS Survey BS Detail Detail+Viva
7 Recce MT/mt TPT+FL Det/Comp Detail+Plot RAS RAS BS Survey BS Detail Detail+Viva
8 Recce MT/mt TPT+FL Det/Comp Detail+Plot RAS RAS BS Survey BS Detail Detail+Viva

Group 8 to 15 Effective From:15 Falgun 2077


Date 15 Falgun 16 Falgun 17 Falgun 18 Falgun 19 Falgun 20 Falgun 21 Falgun 22 Falgun 23 Falgun 24 Falgun
Group DAY - 1 DAY - 2 DAY - 3 DAY - 4 DAY - 5 DAY - 6 DAY - 7 DAY - 8 DAY - 9 DAY - 10
9 Recce RAS RAS BS Survey BS Detail MT/mt TPT+FL Det/Comp Detail+Plot Detail+Viva
10 Recce RAS RAS BS Survey BS Detail MT/mt TPT+FL Det/Comp Detail+Plot Detail+Viva
11 Recce RAS RAS BS Survey BS Detail MT/mt TPT+FL Det/Comp Detail+Plot Detail+Viva
12 Recce RAS RAS BS Survey BS Detail MT/mt TPT+FL Det/Comp Detail+Plot Detail+Viva
13 Recce RAS RAS BS Survey BS Detail MT/mt TPT+FL Det/Comp Detail+Plot Detail+Viva
14 Recce RAS RAS BS Survey BS Detail MT/mt TPT+FL Det/Comp Detail+Plot Detail+Viva
15 Recce RAS RAS BS Survey BS Detail MT/mt TPT+FL Det/Comp Detail+Plot Detail+Viva

Description
Recce:Reconnaissance MT:Major Traverse FL:Fly level REC:Resection
RAS:Road Alignment Survey mt:Minor Traverse Det:Detail INT: Intersection
BS:Bridge Site Survey TPT:Two Peg Test Comp:Computation Plot: Plotting
Reference sketch of Control Station

Group no: Date:


UNIVERSAL ENGINEERING AND SCIENCE COLLEGE
Chakupat, Lalitpur
Group no: Department of Civil Engineering

Observer :
Recorder :
Instrument : Distance measurement Sheet by Tape
Line Distance (m)
S.No.
From To Forward (FW) Total FW Backward (BW) Total BW
E COLLEGE

Date :
Weather:
Temperature:
Precision
Discrepancy
Average ≥ 1 : 2,000 Remarks
Group no:

Observer :
Recorder :
Instrument :
Line
S.No.
From To Forward (FW)
UNIVERSAL ENGINEERING AND SCIENCE COLLEGE
Chakupat, Lalitpur
Department of Civil Engineering

Distance measurement Sheet by Tape


Distance (m)
Total FW Backward (BW)
E

Date :
Weather:
y Tape Temperature:
Discrepancy Precision ≥ 1 : 2,000
Average Remarks
Total BW
UNIVERSAL ENGINEERING AND SCIENCE COLLEGE
Chakupat Lalitpur
Group no: Department of Civil Engineering
Group no:
Observer :
Recorder :
Instrument : Distance measurement Sheet by Total Station
Line Distance (m) Discrepancy
S.No. Average
From To Forward (FW) Backward (BW)
GE

Date :
Weather:
Temperature:
Precision Remarks
≥ 1 : 5,000
UNIVERSAL ENGINEER
Group no: Department
Group no:
Observer :
Recorder : Major Traverse
Instrument : Horizontal Angle

F
and Ht of

Set-I Set
Sighted
Inst st

A
Inst

HCR observation Mean Horizontal Angle HCR observation


to

C
E d m s d-m-s d m s d m s
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
0
NIVERSAL ENGINEERING AND SCIENCE COLLEGE
Department of Civil Engineering Bearing :

Major Traverse by Total Station


Horizontal Angle Observation Sheet

Set-II Mean Horizontal angle


VCR Observation
Mean Horizontal Angle {(I+II)/2}
m-s d m s d m s d
Bearing :

Date :
Weather:
Temperature:

VCR Observation Signal


Remarks
Height
m s
UNIVERSAL ENGINEERING AND SCIENCE COLLEGE
Chakupat Lalitpur
Group no: Department of Civil Engineering

Observer :
Recorder : Minor Traverse by Total Station
Instrument :
Sighted to

HCR Observation Mean Horizontal angle


& Ht. of
Ins. St.

Face
ins.

d m s d-m-s d m
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
Date :
Weather:
Temperature:

l angle

s Remarks
UNIVERSAL ENGINEERING AND SCIENCE COLLEGE
Chakupat Lalitpur
Group no: Department of Civil Engineering

Observer :
Recorder :
Instrument : Detailing Sheet by Total Station
S.N Instrument at Inst.Ht Ref.Ht Easting( E ) Northing(N)
SCIENCE COLLEGE
ur
ngineering

Date :
Weather:
ation Temperature:
Elevation(Z) ID Remarks
Central Engineering Campus
Group no: Department of Civil Engineering

Observer : Date :
Recorder : Weather:

When instrument is at midway of two pegs:


Instrume Sighted Staff readings (m) Mean Value = True difference; Remarks
nt at to Top Mid Bottom {(T+M+B) ÷ 3} h1=(MidA-MidB)
A
P
B

When Instrument is at near one Peg:


Instrume Sighted Staff readings (m) Mean Value = Apparent Remarks
nt at to Top Mid Bottom {(T+M+B) ÷ 3} difference;
A h2=(MidA-MidB)
Q
B

Note: Compare mean value with middle wire readings which should be within tolerance ± 1mm

True difference, h1 = (a1-b1)…………………………………(1)


Apparent difference, h2 = (a2-b2)……………………………(2)
Collimation error, e = (h1-h2)
Precision = 1/d/e ≥ 1 in 10,000
Obtained precision = 1/d/e =
UNIVERSAL ENGINEERING AND SCIENCE COLLEGE
Chakupat, Lalitpur
Department of Civil Engineering
Group no:

Observer :
Recorder : Fly Levelling (RL Transfer)

Stations BS S1 FS
Mean Mean
Top Mid Bot BS (T-B) Top Mid Bot FS
Chainage
G AND SCIENCE COLLEGE
t, Lalitpur
Civil Engineering

Date :
g (RL Transfer) Weather:

S2 Stadia
Hz. Dst
Fall Elevation Interval
Rise + (m) Remarks
(T-B) - (m)
Sx100
S=S1+S2
UNIVERSAL ENGINEERING AND SCIENCE COLLEGE
Chakupat, Lalitpur
Group no: Department of Civil Engineering

Observer : Reciprocal Levelling Date :


Recorder : Weather:

When instrument is very near to A:


Instrume Sighted Staff readings (m) Mean Value = Apparent Remarks
nt at to Top Mid Bottom {(T+M+B) ÷ 3} difference;
Very A h1=(MidA-MidB)
near to A B

When Instrument is very near to B:


Instrume Sighted Staff readings (m) Mean Value = Apparent Remarks
nt at to Top Mid Bottom {(T+M+B) ÷ 3} difference;
Very A h2=(MidA-MidB)
near to B B

Check: (T+M+B) ÷ 3 = Mean - Mid = 3mm Tolerance

Apparent difference of level between A & B, h1 = |(a1-b1)|=


Apparent difference of level between A & B, h2 = |(a2-b2)|=
True difference in heights between A & B = [(a1-b1)+(a2-b2)]÷2 = (h1+h2)÷2 =
Error, e = |(h1-h2)|=
Permissible error = ± 25√K mm = . (Where, K = loop distance in km = 2* axis distance in km)
UNIVERSAL ENGINEERING AND SCIENCE COLLEGE
Chakupat, Lalitpur
Department of Civil Engineering
Group no:

Observer : L - Section & X - Section Levelling Date :


Recorder : Weather:

Center
Left Right
Line Reduced
Points Offset Offset BS IS FS HI Remarks
Level (m)
(m) (m)
Chainage
UNIVERSAL ENGINEER
Group no: Chaku
Department o
Observer :
Recorder : Analytical In
Instrument :

Set - I
& Ht. of

Sighted
Ins. St.

HCR Observation Mean Horizontal angle


Face
ins.

d m s m s d m
to

L
R
L
R
L
R
L
R
UNIVERSAL ENGINEERING AND SCIENCE COLLEGE
Chakupat, Lalitpur
Bearing:
Department of Civil Engineering
Date :
Analytical Intersection Weather:
Temperature:

Set- II Mean
l angle HCR Observation Mean Horizontal angle Horizonta
s d m s m s d m s l Angle of
Set
Bearing:

Temperature:

Zenithal Angle Remarks

d m s
UNIVERSAL ENGINEER
Chaku
Group no: Department o

Observer :
Recorder : Analytical R
Instrument :

Set - I
& Ht. of

Sighted
Ins. St.

HCR Observation Mean Horizontal angle


Face
ins.

d m s m s d m
to

L
R
L
R
L
R
L
R
L
R
L
R
UNIVERSAL ENGINEERING AND SCIENCE COLLEGE
Chakupat, Lalitpur
Department of Civil Engineering Bearing:

Date :
Analytical Resection Weather:
Temperature:

Set- II Mean
l angle HCR Observation Mean Horizontal angle Horizonta
s d m s m s d m s l Angle of
Set
ring:

Temperature:

Zenithal Angle Remarks

d m s
Universal Engineering and Science College
Chakupat, Lalitpur
Department of Civil Engineering
Group no:
Adjustment of Reduced Level

Calculate
Partial d
Stations Chainage Correction ±
Distance Reduced
Level
ience College

neering

Date:

Adjusted Reduced
Remarks
Level
Universal Engineering and Science College
Chakupat, Lalitpur

Department of Civil Engineering


Group no:
Observer :
Recorder : Chainage computation of curve in Road alignment
Instrument :

Line/Leg Chainage Radius of


IP to IP Deflection Angle = ± Δ

Station
From To of IP Curve,
Distance
IP IP station ± d m s R (m)
IP

Steps to be followed to compute the Road Hz Curve Elements during field survey

1 Tangent Length TL = R (Tan Δ/2)

2 Length of Circular Curve Lc = ( Λ R Δ/180)

3 Apex Distance E = R( ( 1/CosΔ/2) - 1)

4 Chainage of IP = Chainage of previous EC + ( IP distance - previous Tangent length

5 Chainage of BC or T1 = Chainage of current IP - current Tangent length)

6 Chainage of MC = Chainage of BC + (Length of Curve/2)

7 Chainage EC or T2 = Chainage of BC + Length of Curve

8 Chainage of IP = Again repeat the step 4 at next station and 1, 2, 3, 5, 6 and 7


d Science College
itpur
Bearing:
Engineering

Date :
f curve in Road alignment Weather:
Temperature:

Tangent Length of Apex Chainage Chainage Chainage


Length Curve, Distance, of BC of MC of EC Remarks
TL (m) L (m) E (m) (km) (km) (km)

previous Tangent length)

Tangent length)

1, 2, 3, 5, 6 and 7
Universal Engineering and S
Chakupat, Lalitp
Department Of Civil En
Recorder:
Instrument:

Group no:

Observed Angle Corrected Angle


Leg/Line

Distance

Correcti
Station

d m s d m s

on

Sum =
Universal Engineering and Science College
Chakupat, Lalitpur
Department Of Civil Engineering Bearing:

Major Traverse Computation (Gale's Table)


Reference Co-ordinate: X Y Z
Station No:

Consecutive Independent
Whole Circle bearing Correction Corrected
Co-ordinate Co-ordinate
d m s Latitude Departure Latitude consecutive
Latitude
Departure Departure Northing
= l cosɵ = l sinɵ

∆L= ∆D=
earing:

Temperature:
Pressure:
Date :

Independent
Co-ordinate Adjusted
Easting length
Universal Engineering and Science
Chakupat, Lalitpur
Department of Civil Engineer
Group no:

Observer : Minor Traverse Calc


Recorder :
Correction Corrected Consecutive Coordinates
Station Leg Length Included angle Bearing (ne/N) Bearing Latitude
niversal Engineering and Science College
Chakupat, Lalitpur Bearing:
Department of Civil Engineering

Minor Traverse Calculation(Gale's Table)

Consecutive Coordinates Independent Coordinates Correction(ne/N) Corrected independent Coordinates


Departure N E N E N
ing:

Date :
Weather:
cted independent Coordinates
E
UNIVERSAL ENGINE
Ch
Group no: Departmen
Observer :
Recorder : Bridge Site Triangulat
Instrument :

Set - I
& Ht. of

Sighted
Ins. St.

HCR Observation Mean Horizontal angle


Face
ins.

d m s m s d m s
to

L
C
R
L
A B
R
L
D
R
L
D
R
L
B A
R
L
C
R
L
B
R
C
L
A
R
L
A
R
D
L
B
R
UNIVERSAL ENGINEERING AND SCIENCE COLLEGE
Chakupat, Lalitpur
Department of Civil Engineering Bearing:
Date :
ridge Site Triangulation (Base Triangle) by Theodolite Weather:
Temperature:

Set- II Mean VCR Observation


HCR Observation Mean Horizontal angle Horizonta
d m s m s d m s l Angle of d
Set
ng:

Temperature:

VCR Observation Signal Remarks


height
m s

Control Station
of Bridge Axis
A and B are
Universal Engineering and ScienceCollege
Chakupat, Lalitpur
Department Of Civil Engineering
Group no:
For Computation of Detailing by Total Station
Observer : Co-ordinate X Y
Recorder : Backsight
Occupied Station
HCR Observation Horizonta
Height (m)
Instrument

Sighted to

l Distance Vertical
Reduced
at & HI

± distance
Signal

d m s (m) Level (m)


(m)
cienceCollege
r
ineering

etailing by Total Station


Z Date :
Weather:

Whole circle Bearing


Easting Northing
Remarks
d m s (m) (m)
Universal Engineering and Science College
Chakupat Lalitpur
Department of Civil Engineering
DAILY ATTENDENCE SHEET
Group No:
S.N Roll No. Name Attendence Remarks
1
2
3
4
5
6
7

Group No:
S.N Roll No. Name Attendence Remarks
1
2
3
4
5
6
7

Group No:
S.N Roll No. Name Attendence Remarks
1
2
3
4
5
6
7

Group No:
S.N Roll No. Name Attendence Remarks
1
2
3
4
5
6
7

Teacher Name :
Signature:
Date:
Universal Engineering and Science College
Chakupat Lalitpur
Department of Civil Engineering
DAILY PROGRESS RECORD SHEET

S.N Group Task Complete(%) Remaining(%) Remarks

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

Teacher Name :
Signature:
Date:
Universal Engineering and Science College
Chakupat Lalitpur
Department of Civil Engineering
EVALUATION SHEET

S.N Roll No. Name Marks Obtained


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36

Teacher Name :
Signature:
Date:

You might also like