Q3 HOLDINGS IN-HOUSE INJECTOR NOZZLE SERVICE ADDITIONAL COSTS

Quotation:

Additional Tools QUANTITY Rate Cost


Bench Vice 1 250000 250000
Diesel holding 1 25000 25000
container
Torque wrench 1 350000 350000
Sub Total 625000
Floor works
Sand 4 Wheel Barrow 7000 28000
Labour 60,000 60000
Cement 1 bag Available Available
Red Cement/Oxide 20000 20000
Sub Total 108000
Electrical works $
Conductor Gauge 20m 5000 100000
3.5
Mk box plastic 2 2000 4000
double
Pending
Mk box plastic single 2 1500 3000
Bulb 2 7000 14000
Socket 2 7000 14000
Switch 2 15000 30000
Clips 3.5 1 box 5000 5000
Square conduits 10m 30000 30000
Bulb holder 1 3000 3000
Screws & plastic I box 25000 25000
fitting
Sub Total 228000
Operation
WD Spray 1 20000 20000
Diesel 5ltrs Available
5 litres Ultrasonic 5 ltrs 15000 75000
liquid
Total 95000
Additional
Pad lock 1 40000
Vent instalation 60000
Sub Total 100000
Total 1156000