You are on page 1of 3

HSE DAILY REPORT

PROJECT ADD ON PLTGU MUARA TAWAR BLOK 2, 3 DAN 4

Weather

CLEAR (CERAH) / CLOUDY CLEAR (CERAH)/ CLOUDY


07:00 – 12.00 AM 12.00 – 17.00 PM
(BERAWAN) / RAIN (HUJAN) (BERAWAN)/RAIN (HUJAN)

Manpower

Personnel on Board
Perusahaan Direct Indirect
REC- PLN E 72 0
DOOSAN 68 0
HUTAMA KARYA 149 7
MJA 25 0
TPE 311 10
SIMETRIK 144 18
WEN 3 1
LOW 0 0
LASINDO 14 1
SMS 0 0
CENDANA JAYA MANDIRI 0 0
ASCOLINDO 0 0
SURVEYOR INDONESIA 0 0
GRESSINDO 0 0
786 37
TOTAL
823

Incidents Definition / Definisi Insiden

FAT -
Fatality Kematian
LTI -
Lost Time Injured / Hilang Waktu Kerja
RWDC -
Restricted Workday Case / Cedera Ringan
MTC -
Medical Treatment Case / Penanganan Medis
FAC -
First Aid Case / Pertolongan Pertama
MD/ED -
Material Damaged / Kerusakan Material
NMI -
Near Miss / Kejadian Hampir Celaka

HSE Work Activities

Today:
 Housekeeping all area & walkway access
 Body Temperature Check at Gate 5
 Body Temperature Check at site office

15 May, 2023
HSE DAILY REPORT
PROJECT ADD ON PLTGU MUARA TAWAR BLOK 2, 3 DAN 4

 Monitoring of work all area


 Daily Toolbox Meeting
 Cleaning at site area
 Healthy check worker’s
 Vitamin distribution
 Safety line installation
 Drainage normalization
 Cutting grass area GIB line
 Safety sign installation
 Safety patrol activity
 Maintenance safety sign
 General housekeeping activity
 Gas test confined space MOT block 3
 Cutting grass at GIB line area
 CCB cable scrap cleaning in front of CCB area, and replacement to fire ground
 Prepare for reliability run activity, Blocked HRSG #2 with bule tape
 Cleaning cable laydown area CWPH access
 Wood scrap cleaning at STB3 loading bay, and replacement to fire ground area
 Drainage cleaning at CWPH on desalination area
 Fogging activity all area site
 Continue cleaning drainage CWPH area

Tomorrow:
 Housekeeping all area
 Body Temperature Check at Gate 5
 Body Temperature Check at site office
 Monitoring of work all area
 General Toolbox Meeting
 Cleaning at site area
 Healthy check worker’s
 Vitamin distribution

HSE Issues:
- Stock medicine at Faskes is empty
Grass cut at GIB line area
Look Ahead Activities:
- Request and procurement of medicine at Faskes

Picture:

Continue cleaning drainage CWPH area Fogging activity all area site

15 May, 2023
HSE DAILY REPORT
PROJECT ADD ON PLTGU MUARA TAWAR BLOK 2, 3 DAN 4

Drainage cleaning at CWPH on Wood scrap cleaning at STB3 loading


desalination area bay, and replacement to fire ground area

Cleaning cable laydown area CWPH access Prepare for reliability run activity,
Blocked HRSG #2 with bule tape

CCB cable scrap cleaning in front of CCB Cutting grass at GIB line area
area, and replacement to fire ground

Gas test confined space MOT block 3

15 May, 2023