HSE DAILY REPORT

Project : INSTAL & FABRIKASI PIPA + COVER FILTER DRUM Date : 13-Jun-23
Location : PT.INDOFERMEX DEPOK Client : STEVEN
Reported By : RANDA ERLANGGA
Manpower & Manhours HSE Performance
No Ket Jam Jml Manhours No Item Total Keterangan
MB 1 Fatality 0
1 Manpower 8 10 80 2 Lost Time Incident 0
2 Manpower 2 10 20 3 Medical Treatment Case 0
0 0 0 4 First Aid Case 0
Tata 5 Environmental Violation 0
1 Manpower 0 0 0 6 Fire Incident 0
2 Manpower OT 0 0 0 7 Covid Case 0
Total Manpower MB 10 8 Permit 2
Total Manhours MB 100 9

Equipment Inspection
No Item Total Keterangan No Item Total Keterangan
1 Mesin gerinda 3 6 APAR 1
2 mesin las 2 7 porklif 0
3 panel listrik 0 8 segel 0
4 blower 2 9 Fullbody harness 0
5 sling belt 0 10 crane 0
Permit Release Over time
NO Item Lokasi Total Actifity Actifity NO Time Lokasi Hse Activity

room produksi welding pip , fabrikasi & instal didepan kantor welding pip , fabrikasi & instal
1 Hot work 3 1 13:00 - 17:00 RE
lama suport ,pipa cream dan garam produksi suport ,pipa cream dan garam

room produksi pemasangan pipa diatas supor


2 General 1
lama tanki

didepan kantor
3 ketinggian
produksi
Today Activity
1. Lokasi : Di depan office 2. Lokasi : room packing lama
SPV & HSE : Irsan Hatta & Randa E. SPV & HSE : Irsan Hatta & Randa E.
Activity : Tbm pagi ,pengarahan kerja dan safety,mengingatkan team yg bekerja Activity : welding pip , fabrikasi & instal suport ,pipa cream dan garam
diketinggian selalu perhatikan tumpuan kaki dan harness selalu di cantolkan,dan pasaat
pemeotongan pipa di atas hati2 material yg dipotong jatuh kebawah menimpa orang.

3. Lokasi : room packing baru 4. Lokasi :


SPV & HSE : Irsan Hatta & Randa E. SPV & HSE: Irsan Hatta & Randa E.
Activity : Activity: