You are on page 1of 3

Project: hhghh General Notes:

Job No.: hhghh gkg


Client: yyy uyuu
Design by: uuu hgh
Date: tyyuy
Sheet: 2 Of 5
Jerv Works Const. Ref: Reinforced Concrete Design vol 2, pg. 411 by: Besavilla
*Input data in green cells

Reinforced Concrete Wall Footing

Wall footing no. 4

specification
fc' 27.6 MPa
fy 276.5 Mpa
allowable soil pressure 190 kPa
wt. of soil 15.7 kN/m3

service load
dead load 50 kN/m
live load 30 kN/m

type of wall masonry wall


wall thickness 300 mm

footing
assume footing depth h =1.5 wall width 200 mm >>== 130
assume footing width 0.5 m. >>== 0.5
concrete cover 70 mm
depth of footing below final grade 1.2 m

R-bars to use
Phils. Standard Reinforcing Bars

reinforcement ratio
.75Pb > p > 1.4/fy masonry wall
0.037026 0.005 0.005063
300 mm.
r-bar temp. bar
10mm 10mm
Main bar
Temp. bar 10mm @ 650 mm. c to c
3 - 10mm
Result:
1. OK - shear stress
2. No Good - r-bar development length -
hook r-bar or increase footing width

200 mm.

0.5 m.
solution:

assume thickness of footing = 1.5 x of wall thickness 200 mm


wt. of soil = 15.7 kPa
wt. of footing = 4.7088 kPa
effective soil pressure qe = allow. soil pressure - wt. of soi 169.5912 kPa
area required = 0.4717226 m2
considering 1-meter strip of wall, L = 0.5 m
final footing width 0.5 m
ultimate bearing pressure of soil
qu = 242 kPa

bending moment

masonry wall k = 0.175 m


concrete wall k = 0.1 m
k= 0.175 m
Mu = 3.705625 kN-m
3705625 N-mm
Mn = Mu/Ф 4117361.1 N-mm
B1 = .85 if fc'<=30 30
B1 = .85-.008(fc'-30) 0.8692
but B1 should not less than .65 0.65
final B1 0.85
reinforcement ratio
p = .85fc'B1/fy(600/600+fy) 0.0493686
max Pb = .75p 0.0370265
min p = 1.4/fy 0.0050633
use p = 0.005
m = fy/.85fc' 11.786019
Rn = pfy(1-pm/2) 1.3417646 Mpa
1.3417646 N/mm2
required d = √Mn/bRn 55.395096
required h = 130 mm
actual h = 200 mm
actual d = 125 mm
recalculate based on actual d
Rn = Mn/bd2 0.2635111 N/mm2
p = 1/m(1-√1-2mRn/fy) 0.0009584
As = pbd 119.80465 mm2
655.56718 mm c to c
650 mm c to c

check for shear


s d
s= -0.025 m
Vu = -6.05 kN
-6050 N
actual shear Vn = Vu/Фbd -0.0569412 Mpa
allowable shear stress = 1/6(√fc') 0.875595 Mpa >>== -0.056941
1. OK - shear stress

development length
Ld = .02Abfy/√fc' 82.672579 mm
Ld min = 300 300 mm
required min Ld = 300 mm
actual Ld furnished = (L - wall width)/2 - conc. Cover 30 mm >>== 300
2. No Good - r-bar development length - hook r-bar or increase footing width
Temp. bar
As =.002bt 200 mm2
3 ea.

Phils. Standard Reinforcing Bars temp. bar area dia.


r-bar area dia. 6mm 28.27 6
6mm 28.27 6 10mm 78.54 10
10mm 78.54 10 12mm 113.1 12
12mm 113.10 12 78.54 10
16mm 201.1 16
20mm 314.2 20
25mm 491.90 25
28mm 615.75 28
32mm 804.25 32
78.54 10
ASTM Standard Reinforcing Bars concrete wall
Phils. Standard Reinforcing Bars masonry wall