Specification of work: DATE:

1) Earth Work Civil Work


Size 5.0 × 5.0 × 5.0 Column
2) P.C.C 1:4:8 Column Foundation
5.0 × 5.0 × 0.4½
3) Sand Filling for Column Foundation
5.0 × 5.0 × 0.5
4) Column Beam Foundation
4.6 × 4.6 × 1.6
5) Column Size
0.9 × 1.0 × 0.9 × 0.9
Steel for column: 6Nos
16mm 8mm Rings

Plinth Beams:
1) Size 0.9 1.0 P.C.C 1:4:4 Steel 16mm 4Nos
Basement Height
4.0 Height Earth Sand Filling
Basement Flooring Sand Filing 0.4½
Basement Flooring P.C.C: 1:4:8 0.4½”

Brick Work:
Main Walls 0.9 CM 1:6
Partition Wall 4 ½” CM 1:5

Plastering work: 3/4” Thick, M Sand CM 1:4


Outer & Inner Walls:
Ceiling Height 10 Feet
1) Lintel Doors and Windows
2) Loft & Cupboard Work for Bed Rooms & Kitchen
3) Slab: Beam
4) Slab: 4 ½ Thick P.C.C: 1:2:4 with steel
5) Parapet Walls 0.9”
6) Weathering Course: 2” Thickness (usage) Brick with Lime mix concrete
One layer of Press tiles.

Doors & Windows:


1) Door Frame Size 4 × 2 ½
2) Second Quality Teak Wood Ready-made door 3500/-
3) Window UPVC with Plain Glass with Grills
4) Both Room Doors WBC Frame & WBC Doors Plan

Electrical Work:
1) Using 1/180, 1/320, 780 Wire for Light
Power Point, Header Kundan 181 Wire
Metal Box Anchor Roma Switches
2) Bed Room: 2 Light Point, 1 Fan Point, Two Power Points,
2Plug Point, 1AC Point.
3) Hall: 2 Light Point, 1 Fan Point, TV, AC, 4Plug Points.
4) Kitchen: 2 Light, 1 Exhaust Fan, 4 Power Points
Change Over Tripper Switch Box.
Paint Work:
1) Ceiling: One coat white cement & Two coats of (ACC) Emulsion Paint
2) Inner: Wall Putty (Birla Putty) & Two coats of (Tractor) Emulsion
3) Doors & Window Grills: One coat of Primer & two coats of Emulsion Paint
4) Outer Walls: One coat of White Cement & Two coats of (ACC) Emulsion Paint

Plumbing Work:
1) Using ISI (UPVC) Varun Pipes for Bath rooms with Brass Fittings
2) Outer ISI Varun Pipes for all the outer works. Using Heavy gauge 4”, 3”, 2 ½, 1” &
¾” Pipes with Fittings.
3) Bath Rooms Wall Mixer (Metro) Tap. Heater lines,
4) 1 Parry ware European Closet, 1 Parry ware Washbasin with necessary fittings.

Tiles Work:
1) Using 2 × 2 Vitrified Tiles at the rate of 45 to 50/Rs for all flooring.
2) Bath Rooms 7” height Ceramic tiles at the rate of 40/Rs
3) Kitchen Top Granite Tiles at the rate of 200/Rs & 3” feet height ceramic tiles for
kitchen top walls.

Step: Hand Drilling using SS Steel and step flooring at the rate of 45 to 50/Rs
We are using ISI TMT Steel
We are using Ramco cement
Basement Height 4 Feet

Extra Work: Sump & Septic Tank, Front Elevation Work, Compound Wall with Gate.
Safety Gate, EB Main Connection Board, Plywood loft Cupboard, Electrical Fittings.