(D) Concrete and platering debris showing in many areas of building all around and
Terrace Floor,
(E) Fire Over Head Water Tank side wall southside concrete and Main Over Head Water
Tank side wall northside concrete is plumb and line out,
2.Why are there no labourers on the Terrace floor for outside plastering and
deshuttering elevation slab ? It's been more than a week since there are no outside
plastering works ..
3.Why are there is no Shoe casting in STP 2 ? It's casting date is on 08/05/2023
now 11days completed...