LOT-1&2 Painting Deviations
LOT-1&2 Painting Deviations
Waste Management Center
Project No: P-3256
Date: 5/23/2023
Category of
Number Title Problem Description Problem Solution Contractor Status Due Date
Defect
Touch up painting for Touch Up Painting -With
the feed hopper Report
R9O1J6 L25-Feedhopper including lifting tools C INCO FZE (Site) Open 3/14/2023
shall be touch up
painted
Category of
Number Title Problem Description Problem Solution Contractor Status Due Date
Defect
Cleaning and painting Touch Up Painting -With
L24-Bottom ash inside the chute shall Report
7D62XZ C INCO FZE (Site) Open 2/27/2023
chute be completed
Category of
Number Title Problem Description Problem Solution Contractor Status Due Date
Defect
Touch up Painting for Touch Up Painting -With
L24-Bottom Ash the Extractor not Report
ZE8P96 C INCO FZE (Site) Open 2/27/2023
extractor completed
Generated by Insite LMS Page 1 of 10
Project: Dubai Waste Management Center
Project No: P-3256
Date: 5/23/2023
Category of
Number Title Problem Description Problem Solution Contractor Status Due Date
Defect
Painting shall be Touch Up Painting -With
L25-Grate riddling completed in Report
L5056G C INCO FZE (Site) Open 3/14/2023
System damaged area
Category of
Number Title Problem Description Problem Solution Contractor Status Due Date
Defect
Touch up painting for Touch Up Painting -With
L25-Bottom ash mechanical damaged Report
LU71MJ C INCO FZE (Site) Open 3/14/2023
chute area not done
Category of
Number Title Problem Description Problem Solution Contractor Status Due Date
Defect
Painting not done in Touch Up Painting -With
L25-Bottomash mechanical damaged Report
5F1HZZ C INCO FZE (Site) Open 3/14/2023
extractor area
Category of
Number Title Problem Description Problem Solution Contractor Status Due Date
Defect
Touch up painting for Touch Up Painting -With
L25-Vibrating mechanical damaged Report
V0TLPL C INCO FZE (Site) Open 2/27/2023
Conveyor area not done
Category of
Number Title Problem Description Problem Solution Contractor Status Due Date
Defect
Touch up painting not Touch Up Painting -With
L25-Primary Air done in pre heater Report
LY18BB C INCO FZE (Site) Open 3/14/2023
preheater and supports
Category of
Number Title Problem Description Problem Solution Contractor Status Due Date
Defect
Cleaning and painting Touch Up Painting -With
L25-Primary air shall be done Report
0LJ5JA C INCO FZE (Site) Open 3/14/2023
ducts
Category of
Number Title Problem Description Problem Solution Contractor Status Due Date
Defect
L12-Start-Up Paint touch up is to Touch Up Painting -With
BA0GG1 Auxilary Burner be carried out on the Report C INCO FZE (Site) Open 12/31/2022
and Ducts ducts.
Category of
Number Title Problem Description Problem Solution Contractor Status Due Date
Defect
Touch up painting in Touch Up Painting -With
L24-Recirculation the fan and base Report
5YN7VM C INCO FZE (Site) Open
fan frame not done
Generated by Insite LMS Page 2 of 10
Project: Dubai Waste Management Center
Project No: P-3256
Date: 5/23/2023
Category of
Number Title Problem Description Problem Solution Contractor Status Due Date
Defect
General Item, -PA ducts
Coating damages Touch up painting
& touch up Balnce
85Q87U C INCO FZE (Site) Open 2/27/2023
painting. Primary
Air System _ Line
L11
Category of
Number Title Problem Description Problem Solution Contractor Status Due Date
Defect
General Item, -PA ducts
Coating damages Touch up painting not
& touch up done
19EO2T C INCO FZE (Site) Open 2/27/2023
painting.Primary
Air System _ Line
L12
Category of
Number Title Problem Description Problem Solution Contractor Status Due Date
Defect
General Item, -SA ducts
Coating damages Touch Up painting
& touch up not done
9M74E9 painting. C INCO FZE (Site) Open 2/27/2023
Secondary and
Recirc Air _ Line
L11
Category of
Number Title Problem Description Problem Solution Contractor Status Due Date
Defect
General Item, -FGR duct
Coating damages -SA duct
& touch up Touch Up Painting
YS6OXF painting. Not done C INCO FZE (Site) Open 2/27/2023
Secondary and
Recirc Air _ Line
L12
Generated by Insite LMS Page 3 of 10
Project: Dubai Waste Management Center
Project No: P-3256
Date: 5/23/2023
Category of
Number Title Problem Description Problem Solution Contractor Status Due Date
Defect
Touch Up painting
not done in
L23-Auxilary
9320H2 combustion fan C INCO FZE (Site) Open 2/3/2023
Burner system
cooling fan, burner
and ducts
Generated by Insite LMS Page 4 of 10
Project: Dubai Waste Management Center
Project No: P-3256
Date: 5/23/2023
Category of
Number Title Problem Description Problem Solution Contractor Status Due Date
Defect
Touch up painting not
L25-Primary Air done
4VJR88 C INCO FZE (Site) Open 3/31/2023
system
Generated by Insite LMS Page 5 of 10
Project: Dubai Waste Management Center
Project No: P-3256
Date: 5/23/2023
Generated by Insite LMS Page 6 of 10
Project: Dubai Waste Management Center
Project No: P-3256
Date: 5/23/2023
Category of
Number Title Problem Description Problem Solution Contractor Status Due Date
Defect
-Paint touch up is to Cleaning and paint touch up
be carried out on all is to be carried out
L24-Vapour Air
W6683W Supports. C INCO FZE (Site) Open 6/30/2023
System
-Cleaning is to be
performed on all lines
Category of
Number Title Problem Description Problem Solution Contractor Status Due Date
Defect
Final Painting in Sol: Painting works are to be
L25-Flue Gas Damaged area to be carried out wherever required C
FZ8716 INCO FZE (Site) Open 6/30/2023
Recirculation Fan completed
Generated by Insite LMS Page 7 of 10
Project: Dubai Waste Management Center
Project No: P-3256
Date: 5/23/2023
Category of
Number Title Problem Description Problem Solution Contractor Status Due Date
Defect
All Frame for block 2
D9984I L20-Belt conveyor is not done touch up C INCO FZE (Site) Open 4/20/2023
painting
Generated by Insite LMS Page 8 of 10
Project: Dubai Waste Management Center
Project No: P-3256
Date: 5/23/2023
Category of
Number Title Problem Description Problem Solution Contractor Status Due Date
Defect
Painting for the
L25-wall air gauge flanges are not
RC6060 C INCO FZE (Site) Open 5/24/2023
system done
Generated by Insite LMS Page 9 of 10
Project: Dubai Waste Management Center
Project No: P-3256
Date: 5/23/2023