PROFORMA INVOICE

形式发票

Date: April 17th, 2023 P/I No.: ZKJQ-AW-XS-220130/2

BUYER: KAIROS CONSULTING


ADD: NEW ZEALAND

SELLER: HENAN ZHENGZHOU MINING MACHINERY CO., LTD


ADD: QIAOLOU CAIZHAI INDUSTRY ZONE, ZHENGZHOU, CHINA

1. Equipment Price 设备价格


Price(USD)
No. Unit Approx Qty
Item Model 价格(美元)
序 Weigh(Ton) (Set)
项目 型号
号 单台约重 数量 Unit 单 Total 总

EXW Price of Inlet Hopper and Seat Frame of


1 Vibration Grizzly ZKZD600x130 8.6 1 16,000 16,000
棒条式振动给料机的料仓和底座出厂价格
Transportation and Seaport Price From ZK’s
Workshop to Lyttelton, New Zealand Price 1x40’ Frame
2 as CIF Terms Container 1 8,000 8,000
运输和港口费用从工厂到新西兰利特尔顿斯 40 英尺框架柜
港,基于CIF条款
Total CIF Lyttelton, New Zealand Price
24,000
新西兰利特尔顿斯港到岸总价
AMOUNT IN WORDS: SAY US DOLLARS TWENTY FOUR THOUSAND ONLY

2. Price Term 价格条款


The price unit is US Dollars (USD).
价格单位为美元。
The price is based on CIF Lyttelton, New Zealand according to “ INCO terms 2010”.
价格为新 西 兰 利 特 尔 顿 交货价,依据《国际贸易术语解释通则 2010》。

3. Payment Term 付款方式


30% of the total contract price paid by T/T after signing the contract.
签完合同,电汇合同总金额的 30%。
70% of the total contract price paid by T/T after inspection and before shipment.
发货前验货后,电汇合同总金额 的 70%。

1/2
4. Quality Guarantee 质量保证
15 months after B/L date or 12 months after installation and commissioning, whichever comes earlier
(Wear parts are not included)
提单日后的 15 个月或安装调试完后的 12 个月,以较早者为准(易损件不包括在内)。
The inlet hopper, seat frame and vibration grizzly shall be pre-assembly before shipment in case there
is no interference and other quality problem before shipment.
进料仓,底座和棒条式振动料机在发货前 需要进行预组装,确保没有干涉等质量问题。

5. Delivery Time 交货期


All the goods shall be ready for shipment within 15 working days after receiving advanced payment and
getting the approval on the general assembly drawing.
所有设备在预付款到账且总图确认后的 15 个工作日内 具备发货条件。

6. Packing 包装
The equipment bodies and partial accessories and spare parts shall be packed in seaworthy cases and
well protected against dampness, moisture, shock, rust, and rough handling for the transportation
period and be as appropriate for safe delivery receipt to port of destination.
设备主体和附属件以及备件要用适合海运的的包装,做防潮,防晃,防锈等基础处理。
The equipment shall be covered with waterproof cloth.
设备需要加盖防雨篷布。

7. Other terms 其它条款


If the delivery is delayed more than 90 days due to the Buyer’s reason, the Buyer shall bear the
expenses for the Seller’s goods maintenance and storage.
如因买方原因,造成延迟发货超过 90 天,则买方应承担卖方货物维护和仓储保管设备的费用。

8. Technical Parameter And Supply Scope 技术参数和供货范围


Please refere to the following drawings from ZK Corp.
“00 Inlet Hopper and Seat Frame Assembly Drawing 230417”
“01 Inlet Hopper 230417”
“02 Seat Frame 230417”
请参见如下来自郑矿的图纸
“00 进料斗和底架组装图 230417”,“01 进料斗图 230417”,“02 底架图 230417”。

9. BANK INFORMATION 银行信息:


Beneficiary Name: HENAN ZHENGZHOU MINING MACHINERY CO., LTD
Beneficiary Bank: Bank of China Ltd, Henan Branch
Bank address: No.3-1, Shangwu Waihuan Road, Zhengdong New District, Zhengzhou, Henan, China
SWIFT BIC: BKCHCNBJ530
Account No.: 2572 1233 0722

HENAN ZHENGZHOU MINING MACHINERY CO., LTD


(Authorized Signature)