TITLE ISSUE DATE DOCUMENT NUMBER

JIB CRANE LOAD TEST Aug 24h, 2022 TEST 001

LOCATION APPROVED BY VERSION NUMBER PAGE


1450 Dublin Avenue
Winnipeg, MB R3E 3K1 Jardel Santos – Industrial Engineer - EIT 1 1

1.0 Scope
This document describes the procedure used for the load test of the 1/2ton jib cranes attached to the molding press and shows
the results obtained.

2.0 Procedure
1 - Measure the distance between the crane and floor at both ends.
2 - Lift 1000 lbs
3 - Wait for 5 min
4 - Measure the distance between the crane and floor at both ends.
5 - Compare results. If the deflection is higher than 1%. Abort and reject. If not, test with 125% of the crane capacity.
6 - Lift 1250 lbs
7 - Measure the distance between the crane and floor at both ends.
8 - Compare results. If the deflection is lower than 1%, approve

3.0 Results
3.1. South jib crane
- Brand: Spanco
- Capacity: ½ ton
- Span: 8’
- Pull/thrust: 2,590 lbs
- Distance between jib crane and floor: 101.5”
- Distance between jib crane and floor under load 100% capacity (1000 lbs): 101.5”
- Distance between jib crane and floor under load 125% capacity (1250 lbs): 101.5”
APPROVED!

3.1. North jib crane


- Brand: Spanco
- Capacity: ½ ton
- Span: 8’
- Pull/thrust: 2,590 lbs
- Distance between jib crane and floor: 101.5”
- Distance between jib crane and floor under load 100% capacity (1000 lbs): 101.5”
- Distance between jib crane and floor under load 125% capacity (1250 lbs): 101.5”
- APPROVED!

4.0 Worker sign-off


By signing below, I acknowledge that I attended the load test and checked the measurements performed.

Name: (please print) Signature: Date:

1.

2.