Professional Documents
Culture Documents
: 0002-PTU5/SMT/02-2023
PEKERJAAN : BC8 GEAR BOX RECONDITION
PO No. :
MACHINE ITEM/TAG NO.: TRIPPER UNIT STRE2
DATE: JANUARY- JUNI, 2023
AREA: PLTU LONTAR
CLIENT: PT. SEMITER
Page: 1/6
SERVICE REPORT
Dismantling lubrication
pump unit
Needs to be serviced
Lube Pump was light worn Running on dirty condition
Still operating well
Lube Pump Unit parts Lube installation tube was dirty Running on dirty condition Needs to be serviced
identification and
inspections Filter oil was dirty Running on dirty condition Replaced with new one
Boring process Return to original size Using in situ line boring mc.
Top tolerance +0.005
Bor diameter 180.00 Ok
Bottom tolerance -0.005
QC inspection
Roughness N6 N5-N6 Ok
Moving to site
Installation on site
Motor to Axial : 0.03 Axial tolerance : 0.08
Ok
gearbox Radial : 0.04 Radial tolerance : 0.08
Alignment
Conv. to Axial : 0.03 Axial tolerance : 0.08
OK
gearbox Radial : 0.06 Radial tolerance : 0.08
Page: 6/6
ARRANGED BY: PT. PERSADA TANTA UTAMA CLIENT APPROVAL: PT. SEMITER END USER: PLN UPP JBB