Calculation Sheet BLOK TAMBAHAN PUSAT KHIDMAT AGE


KEBANGSAAN
(PKAADK) DAERAH JASIN, MELA

Title: Step (2) : Sizing of sediment basin Design by: VNA


Date: 02/03/2012
REF. CALCULATION

MSMA SIZING OF SEDIMENTATION BASIN


2000

Design Criteria:
Table 39.4
Soil type = C
Construction Period = 2 years
Design Storm ARI = 3 months (2 years cons.)
Time of Concentration, t0 = 15 minutes
Table 39.5 Required Surface Area = 292 m²/ ha
Required Surface Volume = 350 m³/ ha

The surface required for the site = 292 x 0.272


(required surface area x area catchment) 79 m²

Total volume required site = 350 x 0.272


(required surface area x area catchment) 95 m³

a) SETTLING ZONE

Required settling zone is half the total volume required;


Required settling zone, v1 = 47.63 m³ half the total volume
Settling zone, y1 = 0.6 m

Use trial & error;


Try average width, w1 = 7.4 m
Required settling zone L1 = v1 = 10.73
average length, ( w1 * y1 )
say; 15.2 m

Average surface area provided, = 15 x 7.4


= 112.5 > 79.3
Page 39-16
( c ); vol.15
Check Settling Zone Dimension;

L1 ratio = 17.88 < 200 ms 39-16


y1

L1 ratio = 2.05 > 2 ms 39-16


w1

Confidential 25/5/2022 Silt Trap (2)1 of 6


Project:
Calculation Sheet BLOK TAMBAHAN PUSAT KHIDMAT AGE
KEBANGSAAN
(PKAADK) DAERAH JASIN, MELA

Title: Step (2) : Sizing of sediment basin Design by: VNA


Date: 02/03/2012
REF. CALCULATION

MSMA b) SEDIMENT STORAGE


2000
The required sediment storage zone volume is half (1/2) of the Total Volume

Required storage volume, V2 = 47.63 m³ half the total volume


For side slope Z, H= 2 :V= 1
Z= 2

dimension storage zone at top;


W2 = W 1 - 2 (d1/2) x z = 6.2 m

L2 = L1 - 2 (d1/2) x z = 14.00 m

The required depth for the sediment storage zone which must be at least 300mm can
be calculated from the following realtionship:
V2 = Z² y2³ - Z y2²(W 2 + L2) + y2 (W 2 L2)
use trial & error;
y2 = 0.1 m V2 = 8.28 m³
0.9
Page 39-16 y2 = 0.10 m > 0.3 m
V2 = 8.28 m³ > 48 m³

c) OVERALL BASIN DIMENSION

At top water level : W TWL = W 1 + 2 x Y1/ 2 = 8.00 m

LTWL = L1 - 2 x Z x Y1/ 2 = 14.00 m

Base : W B = W 1 - 2 x Z x (Y1/ 2 + Y2) = 5.00 m

LB = L1 - 2 x Z x (Y1/ 2 + Y2) = 13.60 m

Confidential 25/5/2022 Silt Trap (2)2 of 6


Project:
Calculation Sheet BLOK TAMBAHAN PUSAT KHIDMAT AGE
KEBANGSAAN
(PKAADK) DAERAH JASIN, MELA

Title: Step (2) : Sizing of sediment basin Design by: VNA


Date: 02/03/2012
REF. CALCULATION

MSMA
2000

Wb Wt

Lt

Lb

Depth; Settling zone, y1 = 0.60 m


Sedimentation zone, y2 = 0.10 m
Side slope Z = 2 (H), 1 (V)

Settling zone, y1
Sedimentation zone, y2

Confidential 25/5/2022 Silt Trap (2)3 of 6


ENSI ANTIDADAH

AKA (FASA II)

REMARK

vol.

v1
y1

w1

L1

OK!

OK!

OK!

Confidential 25/5/2022 Silt Trap (2)4 of 6


ENSI ANTIDADAH

AKA (FASA II)

REMARK

NOT OK!
NOT OK!
v2

Wt

Lt

Wb

Lb

Confidential 25/5/2022 Silt Trap (2)5 of 6


ENSI ANTIDADAH

AKA (FASA II)

REMARK

Wt (m) =
8.00

Wb (m) =
5.00

Lt (m) =
14.00

Lb (m) =
13.60

y2

Confidential 25/5/2022 Silt Trap (2)6 of 6

You might also like