You are on page 1of 2

GREATER MALE'CONNECTIVITY–

MALE' TO THILAFUSHI LINK PROJECT

Contract No: (AGR)471-EDS1/PRIV/2021/9

SUBMISSION NOTICE

Our Ref.: AFCONS/MTL/SN/0375


Your Ref. MTL/RSS/SNR/C25-500/0321 dated 15 th April 2022
Subject: Preliminary Design Report - Structures Design Statement – Rev. D

PART A: TO BE COMPLETED BY THE CONTRACTOR

NOTICE OF SUBMISSION OF CONTRACTOR’S DOCUMENTS


The following Contractor’s Documents are hereby submitted to the Employer’s Representative for review.

Sr. Document / Drawing no. Title Rev.


No.
1 - ECF duly filled with Contractor’s Response -

We hereby certify to the Employer that the above Contractor’s Documents are ready for review and comply with
the Contract except to the extent noted below:

Signed: Firm: AFCONS INFRASTRUCTURE LTD


CONTRACTOR (Contractor’s Representative)

Name: SATISH MAHADEV TENGERI Date: 23.04.2022

Page 1 of 2
GREATER MALE'CONNECTIVITY–
MALE' TO THILAFUSHI LINK PROJECT

Contract No: (AGR)471-EDS1/PRIV/2021/9

SUBMISSION NOTICE continued

Our Ref.: AFCONS/MTL/SN/0375


.

PART B: TO BE COMPLETED BY THE EMPLOYER’S REPRESENTATIVE ON RECEIPT OF THE


SUBMISSION NOTICE
Receipt of this Submission Notice is acknowledged by the Employer’s Representative.

Signed: Date:
on behalf of the EMPLOYER

PART C: TO BE COMPLETED BY THE EMPLOYER’S REPRESENTATIVE ON EXPIRY OF THE


REVIEW PROCEDURE

The Employer’s Representative has completed the review of the above named Contractor’s Documents and (tick
box(es) as
appropriate):

□ has no comment / acceptable

□ has the following comments:

…………………………………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………………………………

□ notifies the Contractor that the Contractor’s Documents fail to comply with the Contract to the following

extent(s), and that said Contractor’s Documents should be rectified and resubmitted:

…………………………………………………………………………………………………………………………………………………………………

□ notifies the Contractor of the following Hold Points and Witness Points:

…………………………………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………………………………

Signed: Date:
on behalf of the EMPLOYER

Page 2 of 2