Artyzen Cuscaden

Singapore

Brief of BOH Design


Workshop
for Design Development

Date: 13 Feb 2020

CULTURALLY-REWARDING
EXPERIENCES
Cuscaden_Brief of BOH Design Workshop
Propose:
The brief is to highlight the AHG’s BOH Design Guide and previous agreed
BOH schematic design layouts for project team to speed up the BOH’s Design
Development.
The highlights in this brief are the minimum standard for hotel BOH areas,
and other requirements not described herein shall refer to the Artyzen Brand
Design, Engineering and ICT Standard.

Content:
1. BOH Design Guide and General Highlight
2. BOH Area List for Artyzen Cuscaden Singapore
3. BOH Area Highlight for Artyzen Cuscaden Singapore

CULTURALLY-REWARDING
EXPERIENCES
1. BOH Design Guide and General Highlights
Issued BOH Documents for Cuscaden Project:
1. Artyzen BOH Brand Standard for
Cuscaden project is issued on 2018-
08-07;
2. Artyzen Brand Standard_The Back of
House@190505 is provided for easy
reference;
3. Artyzen Brief of BOH Engineering
Requirement @190718 is issued;

Highlights of “Artyzen Brand Standard_The


Back of House@190505”: AHG Brand Standards_The Back of House@190505.pdf

CULTURALLY-REWARDING
EXPERIENCES
CULTURALLY-REWARDING
EXPERIENCES
Project:

CULTURALLY-REWARDING
EXPERIENCES
2. BOH Area List for Artyzen Cuscaden Singapore
Item Artyzen Brand Standard Cuscaden BOH’s Remark
The Back of House Sign-off SD Layout
Section B: 1. General Concept  * Combined Office
Administration 2. Administration Offices Area
Facilities • Private Office  L3_GM Office,
• Open Office  L3_Staff Office
• Office Support Area  L3_Staff Rest + Meeting,
Quiet Rooms,

3. Front Office & Luggage Room  L1_Front Office &


Luggage Room;
Section C: 1. General Concept 
Staff Facilities 2. Staff Entry  L1_Staff Entry,
3. Security Office  L1_Security Office cum Receiving Office
4. Human Resource Office  L3_Staff Office cum HR Office
5. Staff Training Room  L3_Staff Rest + Meeting cum Staff Training
Room & Staff Dinning
& Lounge
6. Staff Locker Room & Changing  L3_Staff Washroom +
Area Locker Room + Soiled
7. Uniform Room Uniform Collection;
8. Staff Dinning & Lounge  L3_Staff Rest + Meeting cum Staff Training
Room & Staff Dinning
9. Shift Dormitory & Lounge
CULTURALLY-REWARDING
EXPERIENCES
2. BOH Area List for Artyzen Cuscaden Singapore
Item Artyzen Brand Standard Cuscaden BOH’s Remark
The Back of House Sign-off SD Layout
Section D: 1. General Concept 
General Services 2. Loading/Unloading & Receive  L1_Receiving Area,
Facilities Area
3. Receiving & Purchasing Office  L1_Security Office cum Receiving
4. Driver Toilet  L1_Driver Toilet; Office
5. Service Corridor 
6. Service Lift 
7. General Storage  General Storage Space provision
8. Trash Collection Area only at B1/B2
 L1_Bin Centre;
Section E: 1. General Concept 
Housekeeping 2. Housekeeping Office & Storage  L3_Housekeeping /
Facilities Engineering Office and Store;

3. Maids Room  on every guest floor

4. Linen Chute & Soiled Linen  Linen Chute door on every


Holding guest floor+L3_Soiled Linen
Room;

5. Valet Laundry
 L3_Valet Laundry,
CULTURALLY-REWARDING
EXPERIENCES
2. BOH Area List for Artyzen Cuscaden Singapore
Item Artyzen Brand Standard Cuscaden BOH’s Remark
The Back of House Sign-off SD Layout
Section F: 1. General Concept 
Food & Beverage 2. Area Program  L1/L4/Roof_F&B Kitchens &
Facilities Bar;
 L20_Penthouse unit’s Pantry;
 L3_F&B Storage cum future cold
3. Design & Construction room
Requirement 
Section G: 1. General Concept 
Engineering 2. Engineering Office & Store  L3_Housekeeping /
Facilities 3. IT Server Room Engineering Office and Store;
4. MEP Plantrooms  L3_IT Server Room;
5. MEP Risers & Shafts  MEP Plantrooms;
 MEP Risers & Shafts;

CULTURALLY-REWARDING
EXPERIENCES
Area require design
rendering / colored
elevations + material
board+ FFE propsoal:
1. Administration Offices
2. Staff Locker Room &
Changing Area
3. Staff Dinning &
Lounge
4. Service Corridor

CULTURALLY-REWARDING
EXPERIENCES
CULTURALLY-REWARDING
EXPERIENCES
Project:

CULTURALLY-REWARDING
EXPERIENCES
Project:

CULTURALLY-REWARDING
EXPERIENCES
Project:

To coordinate with Kitchen


Consultant for the F&B
area design &
CULTURALLY-REWARDING
construction.
EXPERIENCES
Project:

CULTURALLY-REWARDING
EXPERIENCES
3. BOH Area Highlight for Artyzen Cuscaden Singapore
a) Administration Facilities: L3_Staff Office; ENGINEERING REQUIREMENT:
• Dedicated Electrical DB;
• FCU with local thermostat controller for each room;
• Min. lighting lux level = 500;
• Each desk / workstation: 13A twin sockets and two data outlets
(for computer and telephone), installed above table;
• Low-level socket for general use at each of walls;
• Provide WIFI AP;
• ED = RFID Card Reader at all entrance doors;
• BGM with volume controller for staff office;
Full glass panel for separation of office and rest area
• CCTV camera watching the Cashier’s sitting area;
• Panic Alarm button for Finance Cashier;

KEY DESIGN ELEMENT:


• Open Plan Office
• Homey and Warm Environment
Printer and Shredder
Mineral water dispenser • Ergonomic and Cheerful Office Furniture
White Board
• Reflection of FOH Interior Design
Small glass panel on entrance door
• Green Planting
• Decorative Lighting
• Can consider the open ceiling with partial panels
L3_Staff Office
OTHER REQUIREMENT:
• All-in-one Printer (with power and data outlets)
Finance • Shredder (with power outlet)
Cashier • Mineral water dispenser for staff office
• White board (for drawing) hanging on wall

CULTURALLY-REWARDING
L3 Artyzen Hotel - FSCS_F&B plan & equip Sign Off Aug 2019.pdf
EXPERIENCES
3. BOH Area Highlight for Artyzen Cuscaden Singapore
a) Administration Facilities: L3_GM Office and Quiet Rooms;
ENGINEERING REQUIREMENT:
• FCU with local thermostat controller for each room;
• Min. lighting lux level = 500;
L3_GM Office and Quiet Rooms; • Each desk / workstation: 13A twin sockets (with USB charging
outlet) and two data outlets (for computer and telephone),
installed above table;
• Low-level socket for general use at entrance;
• Provide WIFI coverage;
• ED = RFID Card Reader at GM office’s door, not for Quiet room’s
door;

Laser printer and safe box at low cabinet


OTHER REQUIREMENT:
• Bigger desk for General Manager;
• High and Low Cabinets in GM Office;
Full glass panel on doors
• Laser printer (with power and data outlets) and Safe box for GM
office;
• Glass panel on door for GM Office and Quiet Room;

CULTURALLY-REWARDING
EXPERIENCES
3. BOH Area Highlight for Artyzen Cuscaden Singapore
a) Administration Facilities: L3_Staff Rest + Meeting;
L3_Staff Rest + Meeting ENGINEERING REQUIREMENT:
• FCU with local thermostat controller;
• Min. lighting lux level = 500, can be dimmable;
• 4 universal type twin power sockets with USB ports + HDMI outlet
Small glass panel (connected to TV) + data outlet for teleconference (with hinged cover);
on entrance door • Low-level twin socket at each of the longer walls;
White boards at both
side wall, ledge below
• Provide WIFI AP;
• One twin socket and telephone outlet on top of the cabinet;
• BGM with volume controller for staff rest;
• Double sink (with hot and cold water);
• Power socket for coffee machine, fridge, microwave, U/C oven,
instantaneous hot water boiler;

KEY DESIGN ELEMENT:


• Homey and Warm Environment, Reflection of FOH Interior Design
Notice board on wall • Ergonomic and Cheerful Office Furniture
• Green Planting
• Decorative Lighting (*Apart from the ceiling downlight, decorative
pendant light can be considered on top of table).

OTHER REQUIREMENT:
• LED TV (65”) c/w soundbar and VC system for meeting facilities (see AV
system brief), wireless and wired HDMI connection from laptop
computer to LED TV;
• Notice board, White board for drawing, Wall clock
• High level cabinet
• Mineral water dispenser and U/C waste bin

CULTURALLY-REWARDING
EXPERIENCES
3. BOH Area Highlight for Artyzen Cuscaden Singapore Front Office:
ENGINEERING REQUIREMENT:
a) Administration Facilities: L1_Front Office • DB for Main Reception Area;
• FCU with local thermostat
controller;
• Min. lighting lux level = 500;
• Each desk / workstation : 13A
twin sockets (with USB
charging outlet) and two data
outlets (for computer and
Front Office telephone), installed above
table;
• One twin socket at low level for
• Storage area
general use;
• Provide WIFI AP;
• ED = RFID Card Reader;
• CCTV camera watching the safe
box in Front office;
• Fire alarm repeater panel, BGM
• Staff seat controller, ID Lighting
area
Controller at Front Office;
OTHER REQUIREMENT:
• Counter-top laser printer (with
a) Wall-mounted DBs; General Reminds:
power and data outlets);
b) BGM/PA zone selection 1. Front Office’s Equipment Installation CSD and MEP DD shall • Shredder (with power outlet);
console (on table); be reviewed by Consultants/MEP Checker and signed-off by • Mineral water dispenser;
c) Fire alarm repeater panel AHG; • White board (for drawing)
(on side wall); 2. The submission shall indicate the notes for Outstanding hanging on wall;
d) AV Rack (on wall, upper Information; • Safe box;
part); 3. Each BOH area’s operation requirement, please refer to the
e) FOH Lighting Controller issued documents of “01 Cuscaden_Brief of BOH Engineering
(on wall, lower part); Requirement@190718” or “AHG Brand Standards_The Back
C U L T U R A L L Y - R E W A R D of
I N House@190505”.
G
EXPERIENCES L1 Artyzen Hotel - FSCS_F&B plan & equip Sign Off Aug 2019.pdf
3. BOH Area Highlight for Artyzen Cuscaden Singapore
a) Administration Facilities: L1_Luggage Room;

Luggage Room:
ENGINEERING REQUIREMENT:
• FCU with local thermostat controller;
• lighting lux level = 400;
• One twin socket at low level for general use;
• Provide WIFI AP;
• 1 data outlet for wall-mounted telephone;
• ED = RFID Card Reader;
• CCTV camera watching inside Luggage room;
L1_Luggage Room; OTHER REQUIREMENT:
• Free standing shelving around the room
• Durable floor finish: ceramic tiles
• Heavy duty printed vinyl wallpaper
• Corner protection on any exposed corners

CULTURALLY-REWARDING
EXPERIENCES
3. BOH Area Highlight for Artyzen Cuscaden Singapore
b) Staff Facilities: L1_Staff Entry;
Staff Entry:
Scupper drain/Steps/Drop is not advisable at BOH Service ENGINEERING REQUIREMENT:
Routing; • Min. lighting lux level = 300;
• 2 power outlets and 2 data points at high-
level for future use;
• Video intercom outside entry for visitor,
wired to Security office;
• 2 nos. ED = RFID Card Readers for staff in and
out; Advance security access control system
for staff access shall be studied by Project
Security Consultant, i.e. Biometric
technology;
• 2 nos. CCTV watching the staff in and out;
Digital
Notice Board OTHER REQUIREMENT:
• A digital notice board shall be considered at
staff entry;

West Corridor Exit:

ENGINEERING REQUIREMENT:
• ED = RFID Card Readers for staff in and out;
• CCTV watching the staff in; Staff Entry c/w Video Intercom for visitor
and Two Finger Print Timeclocks for
attendance & time tracking At 1350mm
CULTURALLY-REWARDING (power and data outlets)
EXPERIENCES
3. BOH Area Highlight for Artyzen Cuscaden Singapore
b) Staff Facilities: L1_Security Office (cum Receiving office/FCC);
Acting as Security & Security Office (cum Receiving office and FCC)
Acting as FCC ENGINEERING REQUIREMENT:
Receiving Office
• Dedicated Electrical DB(E) c/w essential power
and UPS
• FCU with local thermostat controller;
• Standby split A/C units connected with essential
power;
• Min. lighting lux level = 500;
• Desk/workstation: two 13A twin sockets and two
data outlets (for computer and telephone),
installed above table;
• Apart from workstation, additional twin sockets
shall be provided above table for charging of
walkie talkie and general use;
• Provide WIFI AP;
• Video Intercom to Staff Entry for visitor access
releasing;
• ED = RFID Card Reader: Security office, Building
OTHER REQUIREMENT: west back door;
• Master key cabinets; • CCTV watching the key control system cabinets;
• Counter-top laser printer (with power and data outlets); • Multiple 46” LCD monitors (at least 2 x 2);
• Guard daily operation equipment as proposed by Security • Main fire alarm panel; Security system control
Consultant; console; Lift supervisory panel;
• Provide desk space for access door lock system
encoding;

CULTURALLY-REWARDING
EXPERIENCES
3. BOH Area Highlight for Artyzen Cuscaden Singapore
b) Staff Facilities: L3_Staff Washroom + Locker Room;
Soiled Uniform Collection OTHER REQUIREMENT:
Locker Room
• Lockers shall seat on a 100mm thick concrete pad;
• Minimum dimension lockers shall be a twin 250mm wide and
1500 high with base compartment for shoe storage. Lockers
must be factory-painted baked enamel. Each locker shall have
a number plate and keyless lockable system with override
mechanism. Each locker shall have visual front and a sloped
top
• 760mm x 1980mm high mirror;
• One wall-mounted notice board 610mm x 915mm, 6mm think
cork with wooden frame; House phone;
Shower Area
• A robe hook shall be provided at each shower door;
• Hand shower shall be with thermostat control valve;
• Kerb to be provided between shower wet area and dry area;
Notice Board with
House phone
Lavatory
• Each WC closet shall be provided with dual toilet paper holder,
waste receptacle and coat hook at door;
ENGINEERING REQUIREMENT: • Wash basin, wash closet and urinal shall be an electrical-
• FCU with local thermostat controller and adequate operated sensor type (touchless fixtures);
mechanical; • Waste receptacle and liquid soap dispenser can be integrated
• Ceiling panel Min. lighting lux level = 300; into the wet vanity.
• Provide one socket (above table) for dry make-up vanity;
• Provide WIFI Coverage;
• Low level waterproof socket for general use;
• ED = RFID card reader (only for female);
• Background music;

CULTURALLY-REWARDING
EXPERIENCES
3. BOH Area Highlight for Artyzen Cuscaden Singapore
c) General Services Facilities: L1_Receiving Area, Bin Centre;
Bin Centre
ENGINEERING REQUIREMENT:
• Water hose and drainage for cleaning;
• FCU with local thermostat controller;
• Min. lighting lux level = 150;
Bin Centre • Low level waterproof socket for general use;
• High level waterproof socket for insect killer
machine;
• CCTV camera watching the entrance/driveway;
• Provide WIFI coverage;

Receiving Area (Loading/Unloading Bay)


ENGINEERING REQUIREMENT
• Water hose and drainage for cleaning;
• Min. lighting lux level = 200;
Receiving Area
• Low level waterproof socket for general use;
• Provide WIFI coverage;

CULTURALLY-REWARDING
EXPERIENCES
3. BOH Area Highlight for Artyzen Cuscaden Singapore
c) General Services Facilities: Service corridor and lobby, Services lift car;
ENGINEERING REQUIREMENT:
• PAU for enclosed corridor, through BMS control;
• min. lighting lux level = 150; Motion sensor to control the
alternative light circuits for energy saving;
• Spot track light along corridor for notice board;
Notice board
• Low level power socket for general use, every 20m interval;
with spot track
lights; • Provide WIFI coverage;
• Good quality pipe sealant for pipe penetrating the floor,
cove covers between floor and wall;
• Delivery protection hanger sheet for service lift car;

OTHER REQUIREMENT:
• Corner edge protection and bumper rail along service
routing, kick-plate on all service doors;
• Viewing glass panel for service doors where heavy traffic;
• Door stopper and latch to keep open;
• Floor tiles with curved edge up;
• Notice board with spot track lights;

CULTURALLY-REWARDING
EXPERIENCES
3. BOH Area Highlight for Artyzen Cuscaden Singapore
d) Housekeeping Facilities: L3_Housekeeping/Engineering Office and Store;
ENGINEERING REQUIREMENT:
• Dedicated Electrical DB;
• FCU with local thermostat controller
• Min. lighting lux level = 500 for desk area; 300 for other area;
• Each Desk workstation: two 13A twin sockets (with USB charging
outlet) and two data outlets (for computer and telephone), installed
above table;
• Low-level socket for general use at each of the longer walls;
• Provide WIFI AP;
• ED = RFID Card Reader at both doors;
• CCTV camera watching to Master Key Boxes;
• BGM with volume controller for Housekeeping/Engineering office;
KEY DESIGN ELEMENT:
• Open Plan Office; Homey and Warm Environment;
• Ergonomic and Cheerful Office Furniture; Green Planting;
OTHER REQUIREMENT:
• Counter-top laser printer (with power and data outlets);
• Mineral water dispenser;
• White board (for drawing) hanging on wall;
• Master Key Boxes;
• Lost and Find Cabinet;
• Heavy duty free-standing shelving rack for store;
Counter-top laser printer (with power and data • Store for clean linen, amenities and other general items;
outlets);
Mineral water dispenser
White board (for drawing) hanging on wall; Reference of Master Key Boxes:
Master Key Box; • at L3_Housekeeping / Engineering office;
Lost and Find Cabinet; • at L1_Security office;
CULTURALLY-REWARDING
EXPERIENCES
3. BOH Area Highlight for Artyzen Cuscaden Singapore
d) Housekeeping Facilities: L3_Valet Laundry
ENGINEERING REQUIREMENT
Valet Laundry • Aircon to the room;
• MEP connection provision (including adequate mechanical
ventilation) for laundry equipment as per Specialist’s advice;
• Min. lighting lux level = 500;
• Waterproof socket for general use;
• Provide WIFI coverage and Wall-mounted VoIP Telephone;
• ED = RFID Card Reader at the door;
• Power Outlets and Water Outlets for washing equipment as
advised by Kitchen Consultant
• Power Outlet and Water Outlet for Cleaning Chemical
Dispensing System

OTHER REQUIREMENT:
• Cleaning Chemical Dispensing System as per AHG email dated
on Fri 12/4/2019 7:19 PM

The below detergent information for reference.

https://www.ecolab.com/offerings/all-purpose-cleaning/a-
456-ii-disinfectant-
qc?industry=Hospitality&market=Hotels&application=Hotel
+Cleaning&solution=Housekeeping+Solutions

https://www.diversey.com/product-catalogue/command-
center-dispensing-system-d5055748
CULTURALLY-REWARDING
EXPERIENCES
3. BOH Area Highlight for Artyzen Cuscaden Singapore
d) Housekeeping Facilities: L3_Soiled Linen Room and Linen Chute;
Soiled Linen Room
ENGINEERING REQUIREMENT
• Air-con to the room with adequate mechanical ventilation;
Soiled Linen Room • Min. lighting lux level = 500;
• One twin socket at low level;
• Provide WIFI coverage and Wall-mounted VoIP Telephone;
• ED = RFID Card Reader at the door;
OTHER REQUIREMENT:
• Wall Protection: 0.9 m above floor continuous synthetic wood (recycled
PVC / wood composite) stainless steel bump rail, minimum 120mm H x
35mm D;
• Corner guard:1.8 m high, synthetic wood; stainless steel guards at wall
Linen Chute corners;
Linen Chute
ENGINEERING REQUIREMENT
• Fire protection (i.e. Sprinkler) as per code requirement;
OTHER REQUIREMENT:
• Interlocking among Linen Chute doors for safety, i.e. only can open one
line chute’s door for all floors line chutes at each time.

CULTURALLY-REWARDING
EXPERIENCES
3. BOH Area Highlight for Artyzen Cuscaden Singapore
d) Housekeeping Facilities: Guestroom floor, Maid Area;
ENGINEERING REQUIREMENT
1st Maid Area
• PAU to the area;
• Min. lighting lux level = 300;
• One socket at low level for each Maid area;
• Provide WIFI coverage;
• ED = RFID Card Reader at the door;

OTHER REQUIREMENT:
• Door stopper and latch to keep open;
• Wall Protection: 0.9 m above floor continuous synthetic wood (recycled PVC /
wood composite) stainless steel bump rail, minimum 120mm H x 35mm D;
• Corner guard:1.8 m high, synthetic wood; stainless steel guards at wall
corners;
• Shelfing for linen storage;

2nd Maid Area

CULTURALLY-REWARDING
EXPERIENCES
3. BOH Area Highlight for Artyzen Cuscaden Singapore
e) Food & Beverage Facilities: L1/L4/Roof_F&B Kitchen;
CONSTRUCTION REQUIREMENT:
Kitchen Floor slab and Kitchen Floor finish
1. All kitchens in the BOH are to have a full
structural depression of 300mm;
2. Structural Loadings area: Kitchen General Areas
450kg/m2. Localized loadings of 750kg/m2 and
General Stores and Chilled/ Freezer Rooms
100Kg/sqm; L1_Kitchen
3. Thickness 20mm, Surface as R12 non-profiled,
unglazed, dry-pressed homogenous tiles, acid
and oil resistant, resistant against caustic
solutions, extremely high point loads are possible
according to DIN/EN 176, water absorption: <
3%, flexural strength: 27 m/mm2;
4. Curved skirting: Floor to wall & juncture to be
coved w/ radius 20 mm to min. height to wall
150 mm;
5. Concrete Plinth: Non-absorbent masonry
concrete plinth base with a layer of smooth
finished (same material as floor). Minimum
height should be 100 mm. Spaces between the
masonry base and the equipment must be sealed
with water, heat & chemical resistance grout. L4_Kitchen

Roof_Kitchen
CULTURALLY-REWARDING
EXPERIENCES
REFERENCE FOR KITCHEN FINISH AND CORNER GUARDS

CULTURALLY-REWARDING
EXPERIENCES
3. BOH Area Highlight for Artyzen Cuscaden Singapore
e) Food & Beverage Facilities: L3_F&B Storage;
ENGINEERING REQUIREMENT
• Aircon to the area;
• Min. lighting lux level = 300;
• One socket at low level;
Provision • Provide WIFI coverage and wall-mounted VoIP Telephone;
Area for • ED = RFID Card Reader at the door;
• Other as per Kitchen Consultant’s advice;
future Cold
F&B Storage Store OTHER REQUIREMENT:
• Door stopper and latch to keep open;
• Shelfing for storage as per Kitchen Consultant’s advice;
• Chiller and freezer room storage are important and must be
flush level with floor, require approx. 200 mm set down or
sunken and coordinate with Architect.

PROVISION AREA FOR FUTURE COLD STORE


• MEP provision shall be advised by Kitchen Consultant;

CULTURALLY-REWARDING
EXPERIENCES
3. BOH Area Highlight for Artyzen Cuscaden Singapore
f) Engineering Facilities: L3_IT Server Room;
CONSTRUCTION REQUIREMENT:
1. Floor: Raised floor with anti-static material and non-
magnetic finish; Floor height at least 300mm for
floor cabling, Capable of supporting up to 1000
kg/m2; 1m vinyl skirting;
2. Wall: Fire resistant, painted white; No external
window allowed;
3. Ceiling: Ceiling gird system (600mm x 600mm);
4. Door: Fire resistant type; A min 900mm x 2m for
easy rack delivery; electronic key card; hangers;
stop; silencers;
5. No wet room above Server Room; Floor immediately
above the room shall be watertight and any
openings in the ceiling, walls or floor shall be sealed;

MANNING:
1. No staff in this room;

CULTURALLY-REWARDING
EXPERIENCES
3. BOH Area Highlight for Artyzen Cuscaden Singapore
f) Engineering Facilities: MEP Plantrooms and Area;
CONSTRUCTION REQUIREMENT:
1. Floor: Heavy duty homogenous tiles; 100mm
concrete plinth for all floor standing
panels/equipment. Floor Drain for Mechanical
Plantrooms, to provide the scrapper drain and
sump pit as necessary for equipment drains and
overflows, arranged to minimize potential
tripping hazards.
2. Base/Sealant: 100mm vinyl;
3. Wall: Painted whited. Acoustic type wall panels /
ceiling panels for noise operation plantrooms as
advised by Acoustic Consultant;
4. Door size or wall opening for full equipment
replacement delivery shall be advised by MEP
Designer. (Remark: Assemble of equipment
product on site is not advisable due to
inadequate site-test facilities for verifying the
final product performance);
5. Door Hardware: Electronic key card for essential
plantrooms, and mechanical key for non-
essential plantroom; hangers; stop; silencers;

CULTURALLY-REWARDING
EXPERIENCES
3. BOH Area Highlight for Artyzen Cuscaden Singapore
f) Engineering Facilities: MEP Plantrooms and Area;
NOISE / VIBRATION TREATMENT REQUIREMENT:
1. MEP Plantrooms, e.g. Chiller Plantroom and Cooling Tower • MEP equipment at above of L20_Guestrooms
Area, Generator Area, Pump Areas, Fan Areas and etc., are the & Penthouse Bedroom, Acoustic Consultant /
source of noise/vibration generation, which shall be located MEP Checker please review the
away from the noise-sensitive areas as much as possible; If equipment/pipe’s operation vibration and
not achievable due to building plan limitation, adequate noise treatment solution in MEP Detailed
acoustic / vibration treatment shall be implemented. Advice
Design.
from Acoustic Consultant shall be obtained for all MEP
Plantroom’s equipment/pipe work detailed design;

CULTURALLY-REWARDING
EXPERIENCES
3. BOH Area Highlight for Artyzen Cuscaden Singapore
f) Engineering Facilities: MEP Risers and Shafts; Typical Guestroom Floor (i.e. Level 14)
CONSTRUCTION REQUIREMENT:
1. Floor: Smooth trowelled concrete;
2. Wall: Painted whited.
3. Door: subject to project specify for services
inspection;
4. Door Hardware: Mechanic key, hangers; stop;
silencers;
5. Elect / IT / Data / Tel Risers are not advisable to be
adjacent to Water Pipe Shafts;

ENGINEERING REQUIREMENT:
1. No suspended water pipe over electrical panels or
equipment control panels, including any wet piping,
appurtenances or condensate drainage;
2. All electrical panels and circuits accessible to the
public must be kept locked;
3. Electric shock treatment notices must be prominently
displayed internally together with all statutory
notices on the entry door;

CULTURALLY-REWARDING
EXPERIENCES
Cuscaden_Brief of BOH Design Workshop

Q&A

Thank you!