You are on page 1of 2

GOVERNMENT OF KARNATAKA Form No:

Department of Collegiate and Technical Education

BGS POLYTECHNIC [498] Revision:


SJCIT Campus, B.B. Road, Chikkaballapur-562101
Date:
E-Mail: -principalbgsp@gmail.com Phone:9380486028
Capstone project
Format-7
WeeklyStatusReport
Capstone project Name: PICK AND PLACE PNEUMATIC CYLINDER CONTROLLED BY PLC.

Capstone project Members: 1. ASHWANTH M[498EC20009]


2.AKSHAY S D[498EC20007]
3.ABHILASH H G [498EC20001]

Status:

1. Given tasks are being completed.

Highlights:
1. Through online resources and YouTube videos.

2. Choosing a suitable methodology to implement.

3. Preparation of selected methodology format using MS office

Risks or Issues List:

Date Risk or Issue Description Resolution Status

06-03-2023 Timing Procedure to be completed completed


before the event.
07-03-2023 Resource Time of event orgnizer pending
requirements
08-03-2023 Proposed actions Contact marquee company completed
and advice that they will need
to complete it and submit it to
the event.
09-03-2023 Communication There needs to be swift and pending
Lag effective communication
between the project lead and
group members.
10-03-2023 Monitoring Completed check list to be pending
obtained from installer
immediately after erection of
marquee.
11-032023 Scope creep The team finds on internal issues pending
that needs working on to aid
delivery.
Tasks in Progress or Completed:
List the tasks that each member of the capstone project worked on up to the present
time.

TeamMember PercentageCo
Task Name Description Responsible mplete
Work breakdown structure Group discussion on work break Ashwanth M 100%
down structure and time line schedule.

Time line schedule Preparation of work break down Ashwanth M 100%


structure and timeline schedule format
using MS office.
Classroom presentation Classroom presentation o n work break Ashwanth M 100%
down structure and timeline SC.

Group discussion Group discussion on cost break down Ashwanth M 100%


structure.

Format preparation Preparation of cost break down structure Ashwanth M 100%


using MS office.

Weekly meeting Conduct the weekly meeting with team. Ashwanth M 100%

Upcoming Tasks:
List the tasks that each capstone project member is planning to work on the upcoming
tasks

Team Member
Task Name Description Responsible
Learning about Methodology Through online resources and YouTube videos. Ashwanth M
Discussion Different types of methodology.

Methodology selection Choosing suitable methodology to implement. Ashwanth M

Group discussion Preparation of selected methodology format using MS Ashwanth M


office.
Presentation Classroom presentation on selected methodology and Ashwanth M
risk analysis.
Meeting Weekly meetings were conducted with the team. Ashwanth M

Date: Signature of the students