W3-Hima-Badki, Jumla District Annex-1

S.No. As per NEA Observation Contractor’s Clarification NEA Observation


Submission

1. The name of the substation must be Noted. All substations name has Noted
cleared. The contractor may be been revised as per Contract BOQ
instructed to use or write the substation Price Part
by one name-As the Substation has
been written by different names on
different pages, Like –Bachedichaur
Nagma, Distt. Kalikota on the Covering
Letter of Geo-technical report, Tilagufa
in the Geotechnical Report, Nagma SS,
Kalikot in Annex-A (site Map) and
Bachedichaur Kalikot in the Master
Plan. The same please be checked for
another substation too.

2. The test has been conducted by M/S Before Starting of ERT and Noted
Pahupati-Driling & Geo-technical Pvt. Geotechnical Investigation activities.
Limited, Please confirm whether the We informed to NEA and No
approval of the same has been taken by objection certification issued by NEA
NEA. If yes please share to us. Letter is hereby attached

3. The name/witness of approved Letter is hereby attached as issued We requested for the witness of
authority for conducting Geo-Technical Deputy Managing Director, NEA to approval authority/name in the
investigation may kindly be provided Distribution Centers for presence thereof test is
Coordination. Record keeping of conducted however reply
name /witness is not a part of provided doesn’t relate to the
contract for this activity. observation.

4. The identified quarry sites description Identification of Quarry sites in not a Please provide a details of quarry
along with the map and coordinates part of Substation Geotechnical site alongwith the material to be
may kindly be provided investigation. extracted viz a viz requirement of
material at site.

5. The contractor may be instructed to Updated Noted


provide the calculations sheets of
various field and laboratory tests
performed (sample wise) for better
understanding

6. The table representing the Not a part of substation Noted


aggregates/sample Passing is sieve (Size Geotechnical investigation. Material
in mm), Retained IS Sieve (size in mm) test may be done separately, if
and percentage may kindly be provided. required as per contract document

7. The classification of soil has been The sample test is not applicable for Noted. However, Kindly see
mentioned in Annex-B (Bore Hole Log weathered rock. ANNEX-F (Laboratory Test Result
table), however, Grain size Distribution Summary Sheet) of the submitted
Curve/Gradation are missing (% finer report. Grain size Distribution
corresponding particle size (D) dia. Curve has been shown. Kindly
Kindly provide for better understanding elaborate.

8. The graph clearly mentioning the The sample test is not applicable for Noted
Moisture Content (%) vs No. of Blows weathered rock.
should be plotted to get the Flow Index
value

9. The LL and PL values for some samples The sample test is not applicable for Noted
from Trial Pit are non-know. Kindly weathered rock.
clarify

10. Test results related to swell pressure The sample test is not applicable for Noted
and free swell index determination are weathered rock.
not provided

11. Chemical tests results for soil samples The sample test is not applicable for Noted. However, Kindly see
as per IS: 2720 are not provided. Kindly weathered rock. ANNEX-F (Laboratory Test Result
clarify Summary Sheet) of the submitted
report. Chemical Test Report has
been shown at 3m depth. We
understand rock has been
encountered after 1m depth as
per Annex-B (Bore Hole Log
datasheet) Kindly elaborate.
12. Chemical tests pertaining to the The sample test is not applicable for Noted
presence of Nitrate in water samples weathered rock.
are not provided. Kindly Clarify

13. The contractor may be instructed to The sample test is not applicable for Noted
provide the chemical tests results weathered rock.
sample wise for better understanding of
the harmful substances present in soil
and water.

14. The type of sample (Disturbed or Bore hole sample is Undisturbed. Noted
Undisturbed) Should be clarify written
in the result table

15. The test result range of aggregate Note a part of sub- station Noted
impact value, crushing value and Geotechnical, Material test may be
abrasion, value as per IS-2386 may done separately, if required as per
kindly be provided contract comment.

16. Kindly provide the photographs Site images are hereby attached. We have asked for the
performing Laboratory Testing as well. photographs of Laboratory
Testing. However, the
photographs received are of field
tests only. Kindly provide

17. Conclusion and Recommendation


should be more elaborative and
discusses for particular parameters

B. Comments/observations on Earth
Resistivity Test report Applicable on
both the substations

1. Calibration certificate of the kyoritsu Calibration certificate is hereby Calibration certificate provided is
Earth Restively Tester new 4106 shall be attached Page no. 24-26 with ERT not valid.
provided. Reports

2 The test has been conducted by M/s Before starting of ERT and Noted.
Pahupati-Drilling & Geo-technical Pvt. Geotechnical Investigation activities,
Limited. Please confirm whether the we informed to NEA and No
approved of the same has been kindly objection certificate issued by NEA
by NEA. If yes Please share. to us. Letter is hereby attachd.

3 The name/witness of approval authority Letter is hereby attached as issued We requested for the witness of
for conducting Geo-Technical Deputy Managing Director, NEA to approval authority/name in the
Investigation may Kindly be provided Distribution Centres for presence thereof test is
Coordination. Record Keeping of conducted however reply
Name/witness is note a par of provided doesn’t relate to the
contract for this activity observation.

4 Weather condition/ Temperature in the Recording of weather Weather condition/Temperature


report has not been filled up. Please condition/Temperature is not a part in the report format is shown
confirm whether the same has been of contract not recorded. which is not filled up so we
recorded or not. If yes please provided requested the same whether
the data during the test, the then
temperature and weather
conditions are recorded or not as
per IS standard 3043-2018
temperature and weather
conditions may affects the test
results.

5 It seen from the report that earth Earth resistivity test has been Noted.
resistivity has been measures in April Measures in February 2023 and our
2022. The same may also be required in contract started from Nov. 20222. As
dry season during (Oct-Dec 2023) for per contract agreement, if there is a
designing the earth mat. requirement for measurement in dry
season, may be measured in dry
season.