This document outlines the tasks, duration, dependencies and resources required to design and fabricate a portable lathe machine. It includes 46 total tasks over 85 days, from project initiation through celebration of completion. Key stages include design and planning, procurement of materials, manufacturing and assembly, testing and quality assurance, documentation, installation and training. The project is to be completed by 3 individuals: Hasseb, Raheel and Faizan.
This document outlines the tasks, duration, dependencies and resources required to design and fabricate a portable lathe machine. It includes 46 total tasks over 85 days, from project initiation through celebration of completion. Key stages include design and planning, procurement of materials, manufacturing and assembly, testing and quality assurance, documentation, installation and training. The project is to be completed by 3 individuals: Hasseb, Raheel and Faizan.
This document outlines the tasks, duration, dependencies and resources required to design and fabricate a portable lathe machine. It includes 46 total tasks over 85 days, from project initiation through celebration of completion. Key stages include design and planning, procurement of materials, manufacturing and assembly, testing and quality assurance, documentation, installation and training. The project is to be completed by 3 individuals: Hasseb, Raheel and Faizan.