You are on page 1of 4

GREAT VISION SOLUTION SDN BHD (1203016-X)

No.43-A, Jalan Rebana, Off Jalan Seruling 59, Taman Klang Jaya, Kawasan 3,
41200 Klang, Selangor Darul Ehsan, Malaysia.
Email: admin@grevis.com.my Tel:+6(03)33192999

MAGNETIC PARTICLE INSPECTION REPORT (MPI)

Client : GENSON ORNAMENTAL WORKS Procedure No. : GVS/MPI/002 Rev.0

Examination Standard : BSEN IS0 23278: 2015


Project : PROJEK PEMBANGUNAN KEBUK
ELECTROMAGNETIC COMPATIBILITY Acceptance Standard : BSEN IS0 23278: 2015

Location : PLOT 2B, JALAN SEGAMBUT Inspection Date : 30/06/2022

Report No. : MPI-065-GOW-0722 Rev.0

Material : CARBON STEEL Welding Process : FCAW

Surface Preparation : AS WELDED Stage of Examination : COMPLETE WELD

MAGNETIC PARTICLE INSPECTION:

Dry Wet Fluorescent

Magnetic Particle : Sherwin – BO-1 Surface Contrast : Sherwin CP-2


Method of removing excess particle : Normal blow

Magnetizing Technique : Yoke Technique Prod Technique


Magnetizing Current : AC Electromagnetic DC Electromagnetic Permanent Magnet

Lighting : Day light


Artificial Light View illumination : >1300 lux
Black Light uW/cm²

No. Joint Reference Interpretation Result Remarks


Magnetic Particle Inspection was
carried out on weldment area follow:

ITEM : CONNECTION DETAIL TO COLUMN No relevant indication was Accepted *Refer Attached
UNIT NO : Q&L Detected during the inspection picture

NDT Operator : Reviewed By : Approved By :

Signature : Signature : Signature :


Name : Ammar – NDT Lev II Name : Name :
Date : 01/07/2022 Date : Date :

Page 1 of 4
GREAT VISION SOLUTION SDN BHD (1203016-X)
No.43-A, Jalan Rebana, Off Jalan Seruling 59, Taman Klang Jaya, Kawasan 3,
41200 Klang, Selangor Darul Ehsan, Malaysia.
Email: admin@grevis.com.my Tel:+6(03)33192999

MAGNETIC PARTICLE INSPECTION REPORT (MPI)

GENERAL VIEW AND EQUIPMENT DETAIL

NDT Operator : Reviewed By : Approved By :

Signature : Signature : Signature :


Name : Ammar – NDT Lev II Name : Name :
Date : 01/07/2022 Date : Date :

Page 2 of 4
GREAT VISION SOLUTION SDN BHD (1203016-X)
No.43-A, Jalan Rebana, Off Jalan Seruling 59, Taman Klang Jaya, Kawasan 3,
41200 Klang, Selangor Darul Ehsan, Malaysia.
Email: admin@grevis.com.my Tel:+6(03)33192999

MAGNETIC PARTICLE INSPECTION REPORT (MPI)

Client : GENSON ORNAMENTAL WORKS Procedure No. : GVS/MPI/002 Rev.0

Examination Standard : BSEN IS0 23278: 2015


Project : PROJEK PEMBANGUNAN KEBUK
ELECTROMAGNETIC COMPATIBILITY Acceptance Standard : BSEN IS0 23278: 2015

Location : PLOT 2B, JALAN SEGAMBUT Inspection Date : 30/06/2022

Report No. : MPI-065-GOW-0722 Rev.0

Material : CARBON STEEL Welding Process : FCAW

Surface Preparation : AS WELDED Stage of Examination : COMPLETE WELD

MAGNETIC PARTICLE INSPECTION:

Dry Wet Fluorescent

Magnetic Particle : Sherwin – BO-1 Surface Contrast : Sherwin CP-2


Method of removing excess particle : Normal blow

Magnetizing Technique : Yoke Technique Prod Technique


Magnetizing Current : AC Electromagnetic DC Electromagnetic Permanent Magnet

Lighting : Day light


Artificial Light View illumination : >1300 lux
Black Light uW/cm²

No. Joint Reference Interpretation Result Remarks


Magnetic Particle Inspection was
carried out on weldment area follow:

ITEM : CONNECTION DETAIL TO COLUMN No relevant indication was Accepted *Refer Attached
UNIT NO : E7 & E5 Detected during the inspection picture

NDT Operator : Reviewed By : Approved By :

Signature : Signature : Signature :


Name : Ammar – NDT Lev II Name : Name :
Date : 01/07/2022 Date : Date :

Page 3 of 4
GREAT VISION SOLUTION SDN BHD (1203016-X)
No.43-A, Jalan Rebana, Off Jalan Seruling 59, Taman Klang Jaya, Kawasan 3,
41200 Klang, Selangor Darul Ehsan, Malaysia.
Email: admin@grevis.com.my Tel:+6(03)33192999

MAGNETIC PARTICLE INSPECTION REPORT (MPI)

GENERAL VIEW AND EQUIPMENT DETAIL

NDT Operator : Reviewed By : Approved By :

Signature : Signature : Signature :


Name : Ammar – NDT Lev II Name : Name :
Date : 01/07/2022 Date : Date :

Page 4 of 4

You might also like