DISTRIBUTION BOARD CSF-CL-HT-XXXX

CUSTOMER : CSF TELCOHUB EXCHANGE 1


SYSTEM : HT DC SUPPLY
LOCATION : HT ROOM
DATE OF INSPECTION :

ITEM DESCRIPTION PASS FAIL REMARK

1. 2. 3. 4. 5.

6. 7. 8. 9. 10.

11. 12. 13. 14. 15.

i. Record output voltage of each cell. (VDC)

16. 17. 18. 19. 20.

21. 22. 23. 24.

ii. Ensure ventilation in Battery Room.

iii. Clean terminal from acid corrosion.

iv. Clean & retighten vent plug.

v. Ensure all meters are functional.

vi. Release air bubbles trapped in the batteries to prolong battery lifetime.

vii. Make sure all cells are cleaned.

viii. Lubricate connection between cells with petroleum jelly (if needed)

MAINTENANCE REMARK:

CHECKED BY: VERIFIED BY:

DATE: DATE:

TIME: TIME:
HT SWITCHGEAR 30V DC BATTERY CHARGER SYSTEM CSF-CL-HT-XXXX

CUSTOMER : CSF TELCOHUB EXCHANGE 1


SYSTEM : HT DC SUPPLY
LOCATION : HT ROOM
DATE OF INSPECTION :

ITEM DESCRIPTION PASS FAIL REMARKS


Ensure ventilation in battery panel system in good
a.
condition
Clean & retighten battery terminal from acid
b.
corrosion

c. Clean & retighten battery vent plug

d. Ensure all meters and LEDs are functional.

Release air bubbles trapped in the batteries to


e.
prolong battery lifetime

f. Ensure all cells are cleaned

Lubricate connection between cells with petroleum


g.
jelly (if needed)
Record voltage and current for battery output
h. V A
charging
BATTERY READING (VDC)
1. 2. 3. 4.

5. 6. 7. 8.

9. 10. 11. 12.


i. Record battery voltage for each cell
13. 14. 15. 16.

17. 18. 19. 20.

21. 22. 23. 24.

MAINTENANCE REMARKS :

CHECKED BY : VERIFIED BY :
Name & Signature : Name & Signature :

Date : Date :

Time : Time :