DISTRIBUTION SORTER
CONNECTION WITH BOX
STORE
MAINTENANCE
PROCEDURE A5
A1-PED-PAQ-005
V1.0
A1-PED-PAQ-005
DISTRIBUTION SORTER CONNECTION WITH BOX STORE Date: 24/09/2020
Version: 1.0
Index
1. OPERATIVE / FUNCTIONALITY.................................................................................................................................................. 2
2. PROCEDURE REVISIONS.......................................................................................................................................................... 6
1
A1-PED-PAQ-005
DISTRIBUTION SORTER CONNECTION WITH BOX STORE Date: 24/09/2020
Version: 1.0
1. OPERATIVE / FUNCTIONALITY
The purpose of this procedure is to describe the process/route the boxes follow from the Distribution Sorters (Eurosort Dual Split Tray)
until they arrive to the box store (FP Silo).
2
A1-PED-PAQ-005
DISTRIBUTION SORTER CONNECTION WITH BOX STORE Date: 24/09/2020
Version: 1.0
☐ STEP 01
Once the operators have finished extracting the required garments for production from a box,
they are evacuated from the induction stations via a Knapp conveyor belt.
☐ STEP 02
The boxes circulate through different conveyors on the intermediate platform above the
sorters. The following types of Knapp Streamline series conveyors can be found in this area:
A. Roller Conveyor
B. Driven-roller Conveyor Curve
C. High-Speed Roller Switch V2
D. Hinged Conveyor Gate
E. Belt Conveyor
F. Aligning Unit BDE
☐ STEP 03
From The boxes that evacuate from inductions 1 to 6 of each of the sorters (S) are joined in a
From S3 2 S2 From S1
single line. While those evacuating from inductions 7 to 12 are joined in another line.
The boxes will circulate on these two lines from the intermediate platform to third floor (Empty
Boxes Area).
☐ STEP 04
All boxes leaving Sorter, both those that are completely empty and those that still contain
some garments, go up to the upper floor (third floor) via two Knapp conveyors.
3
A1-PED-PAQ-005
DISTRIBUTION SORTER CONNECTION WITH BOX STORE Date: 24/09/2020
Version: 1.0
☐ STEP 05
Boxes with goods take the green route through conveyors to go to box store (FP Silo).
See more about path of empty boxes in A1-PED-PAQ-008 Empty Boxes procedure.
☐ STEP 06
The boxes that continue along the line through the Knapp roller conveyors.
☐ STEP 07
The line is divided into two routes to direct the boxes to one of the two box closers located in
the empty box area.
A pop-up table allows you to manage the box traffic between the two routes.
☐ STEP 08
The boxes pass through one of Tecnimusa's box sealers (ID.47 & 48) to close them at the
top side with adhesive tape (the lower module is deactivated).
4
A1-PED-PAQ-005
DISTRIBUTION SORTER CONNECTION WITH BOX STORE Date: 24/09/2020
Version: 1.0
☐ STEP 09
At the exit of the two box sealers, the goods are rejoined in a single line (green path) by
which they leave the empty carton area (third floor) through a single line (green path).
☐ STEP 10
Goods descend two levels to the first floor through roller and belt conveyors.
☐ STEP 11
At this point the boxes are connected with the boxes coming from the rejection stations and
going to the box store (FP Silo).
The next station through which the boxes will pass is the INTRALOX table (ARB Switch
S7000).
From here, the steps through which the boxes will pass to the box store can be followed in
procedure A1-REC-PAQ-001 BOX ENTRANCE.
MAINTENANCE
☐ STEP 01
According to the manufacturer, the major cleaning/maintenance (in Three-shift operation) for
conveyor system Streamline should be carried out every 4 months regardless of the
workload:
5
A1-PED-PAQ-005
DISTRIBUTION SORTER CONNECTION WITH BOX STORE Date: 24/09/2020
Version: 1.0
☐ STEP 02
According to the manufacturer, the major cleaning/maintenance (in Three-shift operation) for
local control cabinet should be carried:
For specific electrical components see Local Control Cabinet Streamline Maintenance &
Repair Manual from Knapp.
☐ STEP 01
Streamline series conveyors from Knapp, is controlled by KiSoft SCADA software and its
graphical user interface (GUI).
Active messages (E/W/N) from system appears on GUI with the structure shown on the
picture.
☐ STEP 02
6
A1-PED-PAQ-005
DISTRIBUTION SORTER CONNECTION WITH BOX STORE Date: 24/09/2020
Version: 1.0
2. PROCEDURE REVISIONS
REVISIONS
APPROVAL